General Inspection | 9/18/2019 | 9/18/2019 | 9/18/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 9/3/2019 | 9/3/2019 | 9/3/2019 | | PASS |
Michael Zawacki
|
|
|
Home and landscaping completed. Driveway is done. No ESC issues.
|
General Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 | | PASS |
Michael Zawacki
|
|
|
Driveway paved, landscapers on site.
|
General Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 | | PASS |
Michael Zawacki
|
|
|
Home completed and landscaped. Surrounding area needs to regrow.
|
General Inspection | 7/18/2019 | 7/18/2019 | 7/19/2019 | | PASS |
Michael Zawacki
|
|
|
Landscapers on site.
|
General Inspection | 7/3/2019 | 7/3/2019 | 7/3/2019 | | PASS |
Michael Zawacki
|
|
|
Fence being installed, no ESC issues.
|
General Inspection | 6/18/2019 | 6/18/2019 | 6/19/2019 | | PART |
Michael Zawacki
|
|
|
Some wind blown plastic and trash around site. No dust or trackout.
|
General Inspection | 6/3/2019 | 6/3/2019 | 6/10/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/17/2019 | 5/17/2019 | 5/17/2019 | | PASS |
Michael Zawacki
|
|
|
Nothing leving site, no ESC issues.
|
General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. No landscaping or stabalization begun.
|
General Inspection | 4/17/2019 | 4/17/2019 | 4/17/2019 | | PASS |
Michael Zawacki
|
|
|
Nothing leaving site, no trackout. Workers parked on road.
|
General Inspection | 4/2/2019 | 4/2/2019 | 4/2/2019 | | PASS |
Michael Zawacki
|
|
|
Some rock work behind home. No material or equipment leaving lot, no ESC issues.
|
General Inspection | 3/18/2019 | 3/18/2019 | 3/22/2019 | | PASS |
Michael Zawacki
|
|
|
No ESC issues.
|
General Inspection | 3/1/2019 | 3/1/2019 | 3/1/2019 | | PART |
Michael Zawacki
|
|
|
Some trackout from driveway.
|
General Inspection | 2/12/2019 | 2/12/2019 | 2/13/2019 | | PASS |
Michael Zawacki
|
|
|
Site is contained, no runoff or trackout.
|
General Inspection | 1/25/2019 | 1/25/2019 | 1/25/2019 | | PASS |
Michael Zawacki
|
|
|
2 parcel home. Old trackout has been cleaned. Site is trash free and clean. No new ESC issues.
|
General Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | | FAIL |
Michael Zawacki
|
|
|
Home covers two parcels. Someone has driven through mud on side and tracked onto sidewalk and road. Remainder of lot is clean. Sent message to RP.
|
General Inspection | 12/19/2018 | 12/19/2018 | 12/19/2018 | | PASS |
Michael Zawacki
|
|
|
Home being built on two parcels. Site contained, large natural buffer. Workers parking on street and walking. No dirt coming from driveway.
|
General Inspection | 12/3/2018 | 12/3/2018 | 12/3/2018 | | PASS |
Andy J. Long
|
|
|
Snow covered. No trackout. No muddy runoff observed in the thawing conditions.
|
General Inspection | 10/26/2018 | 10/26/2018 | 10/26/2018 | | PASS |
Michael Zawacki
|
|
|
Home is on 2 parcels. Large buffer area, no runoff to roads or sidewalk. No lose trash.
|
General Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Michael Zawacki
|
|
|
Home is on two parcels. Working on framing. Nothing leaving site. Area above driveway has been tracked, blocksoe on inlets. Gravel snake check bags on road, are clean.
|
General Inspection | 4/6/2018 | 4/6/2018 | 4/6/2018 | P | PASS |
Andy J. Long
|
|
|
Graded hillsides have been tracked and hydroseeded. Permit signs posted. Minimal trackout.
|