Permit NumberESC18-00176
StatusIssued
Name ERIC JONES
Site Address 2227 BROADWAY AVE
Project NameOffice Builing - Benjamin Vict
Customer Number 
ePlanReviewNo
Description
Rough grading associated with the construction of a 2-story, 2,700sf building. (BLD17-04650)
*There will be approximately 390 CY of imported fill materials with 347 CY of existing soils to be removed (For item No. 5, we added both together)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection7/27/20207/27/20207/27/2020 PASS
DetailsMichael Zawacki
Building completed, parking lot done, landscaping has begun.
Aging Inspection5/25/20205/25/20205/26/2020 CANC
DetailsAndy J. Long
Aging Inspection3/23/20203/23/20203/23/2020 PASS
DetailsMichael Zawacki
Exterior and parking lot completed. Large pile of trash on site, all along fence.
Site still needs landscaping.
Aging Inspection1/21/20201/21/20201/22/2020 PASS
DetailsMichael Zawacki
Building exterior and parking lot completed.
No apron onto Howard. Lot isn't stable, is below surrounding grade. Silt fence still installed, all torn, more as a perimeter fence.
Aging Inspection11/19/201911/19/201911/19/2019 PASS
DetailsMichael Zawacki
Site is clean. Being prepped for paving, scheduled for 11/20
Aging Inspection9/17/20199/17/20199/17/2019 PASS
DetailsAndy J. Long
No trackout, no activity at site. BMPs installed, permit sign posted
Aging Inspection7/17/20197/17/20197/17/2019 PASS
DetailsMichael Zawacki
WIP. Workers parked on street, site contained. No ESC issues.
General Inspection5/14/20195/14/20195/14/2019PPASS
DetailsMichael Zawacki
No workers on site. Building is framed, area clean and contained. No ESC issues.
Aging Inspection4/23/20194/23/20194/23/2019 PASS
DetailsMichael Zawacki
WIP on vertical. Nothing leaving site, silt fence is in poor shape.
BMP Violation1/17/20191/24/20191/23/2019APASS
DetailsMichael Zawacki
Spoke with RP, hopper on pump truck malfunctioned and spilled concrete, washout wasn't dumped.
Framers now on site.
General Inspection1/2/20191/17/20191/17/2019PFAIL
DetailsMichael Zawacki
Washout dumped on ground. Left message with RP.
Conference1/2/20191/2/20191/2/2019APASS
DetailsAndy J. Long
ESC onsite conference with RP Eric to review ESC BMPs

- double-lined wooden concrete washout box has been placed on site. Will relocate once pump truck arrives
- large rock stabilized access is installed.
- sandbag perimeter built around the storm drain for sediment protection.
- ESC permit sign is posted.

Approved for construction.
General Inspection11/19/201811/19/201811/19/2018PPART
DetailsMichael Zawacki
Silt fence on south west perimeter needs to be trenched. No inlet protection at Broadway intersection. Construction entrance is round river rock not crushed.
General Inspection8/21/20188/21/20188/21/2018PPEND
DetailsMichael Zawacki
Perimeter silt fence will need repairs, parts have been knocked over. Inlet on corner of Broadway will nee protection, entrance will need to be constructed.