General Inspection | 5/15/2019 | 5/15/2019 | 5/15/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 5/15/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/30/2019 | 4/30/2019 | 4/30/2019 | | PASS |
Michael Zawacki
|
|
|
Home is completed and lot landscaped. Multiple perits still opened.
|
General Inspection | 4/12/2019 | 4/12/2019 | 4/12/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/28/2019 | 3/28/2019 | 3/28/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/13/2019 | 3/13/2019 | 3/19/2019 | | PASS |
Andy J. Long
|
|
|
Front yard landscaped. Backyard not yet stabilized.
|
General Inspection | 2/20/2019 | 2/20/2019 | 2/26/2019 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 2/1/2019 | 2/1/2019 | 2/6/2019 | | PASS |
Michael Zawacki
|
|
|
Home completed, backyard still needs to be landscaped.
|
General Inspection | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Michael Zawacki
|
|
|
Two homes being done under same inspection. All foundation work complete, concrete washout on site and clean. Homes are being framed, sites are clean. Excavator on site, loading into dump truck, some dirt on sidewalk. Rock channels along perimeter need better protection.
|
General Inspection | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Michael Zawacki
|
|
|
Two homes being built next to eachother. Each lot has construction entrance, workers are parked on street. Water truck on site. Piece of gator guard not trenched in protectiong drainage on sout side. Large dirt stockpile close to drainage, only a small natural buffer. Sites are clean and free from trash. No fugitive dust.
|
General Inspection | 6/25/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Michael Zawacki
|
|
|
Two neighboring lots. Still large piles of backfill. Perimeter controls are old and will need repair. Some dirt goes right onto slope drainage channel. Pump truck onsite, was using washout.
|
Site Preparation | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | PART |
Andy J. Long
|
|
|
No site preparation inspection requested. Lots excavated and foundations in progress.
Two adjacent sites by same contractor. Permit sign posted, lined concrete washout and construction entrance installed. Subdivsion stormdrains have sediment bags.
No trackout, discharge, or fugitive dust at sites. After backfill is conducted, will need to re-install perimter controls on the west lot. Follow up inspeciton scheduled.
Will remind GC and excavator of site preparation requirement.
|