Site Final | 10/18/2019 | 10/21/2019 | 10/21/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/18/2019 | 10/18/2019 | 10/18/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/3/2019 | 10/3/2019 | 10/4/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior work completed, lot lanscaped.
|
General Inspection | 9/17/2019 | 9/17/2019 | 9/18/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior home work completed. Landscapers on site, some landscape rock stored in road.
|
General Inspection | 8/26/2019 | 8/29/2019 | 8/29/2019 | A | PASS |
Michael Zawacki
|
|
|
Landscapers and A-core on site
|
General Inspection | 8/21/2019 | 8/21/2019 | 8/26/2019 | | PEND |
Michael Zawacki
|
|
|
Currently grading site. Lots of dirt on sidewalk. Follow up scheduled for 8/29
|
General Inspection | 8/6/2019 | 8/6/2019 | 8/8/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior work is completed. Site still needs to be landscaped. No dirt leaving site, no loose trash.
|
General Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/5/2019 | 7/5/2019 | 7/5/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/20/2019 | 6/20/2019 | 6/21/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/5/2019 | 6/5/2019 | 6/10/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/15/2019 | 5/17/2019 | 5/16/2019 | A | PASS |
Michael Zawacki
|
|
|
Sidewalk has been cleaned.
|
General Inspection | 5/14/2019 | 5/14/2019 | 5/15/2019 | | PEND |
Michael Zawacki
|
|
|
Home is framed and stabalized drive in place, trah picked up. Some runoff onto sidewalk, message sent to builder and follow up scheduled.
|
General Inspection | 4/2/2019 | 4/2/2019 | 4/2/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on framing, all trash contained. No dirt leaving site or other ESC issues.
|
Complaint Inspection | 1/31/2019 | 1/31/2019 | 2/4/2019 | P | PASS |
Michael Zawacki
|
|
|
Issues were cleaned. Wattle and gatorguard installed. Trackout has been swept up.
|
General Inspection | 12/14/2018 | 12/14/2018 | 12/14/2018 | P | PEND |
Michael Zawacki
|
|
|
Hauling away backfill, some dirt falling on road and sidewalk, they are sweeping. Concrete wall along back complete, currently excavating for foundation.
|
General Inspection | 10/19/2018 | 10/19/2018 | 10/19/2018 | P | PASS |
Michael Zawacki
|
|
|
Wattle along lower perimeter. Large pile of backfill on site. Concrete company in process of installing footings.
|
Random Inspection | 10/9/2018 | 10/9/2018 | 10/9/2018 | P | FAIL |
Andy J. Long
|
|
|
WIP.
No site preparation inspection.
No trackout or discharges, but no BMPs installed.
|