Permit Information
Permit NumberESC18-01191
StatusFinaled
Name ERIC BELL
Site Address 4525 W RIM ST
Project Name 
Customer Number 
ePlanReviewNo
Description
As per ESC Conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/21/20204/21/20204/21/2020PPASS
DetailsAndy J. Long
HOme complete. BLD finaled. DI bag removed.
Aging Inspection4/21/20204/21/20204/21/2020 CANC
DetailsAndy J. Long
Aging Inspection2/18/20202/18/20202/18/2020 FAIL
DetailsAndy J. Long
BLD open past expiration date. Temporary storm drain bag still installed. Yard is landscaped/stabilized.
Aging Inspection12/17/201912/17/201912/17/2019 FAIL
DetailsAndy J. Long
Temporary storm drain protection still installed. Builder non-responsive. BLD open, home not currently listed for sale.

Need to remove storm drain bag
Site Final10/16/201910/17/201910/18/2019ANR
DetailsAndy J. Long
DI bag still installed. BLD open because house is for sale.

Will close ESC when DI bag is removed.
Aging Inspection10/16/201910/16/201910/16/2019 CANC
DetailsAndy J. Long
Site Final8/12/20198/12/20198/13/2019PNR
DetailsAndy J. Long
Need to pull temporary sediment bag installed in storm drain. No other request, home is landscaped and perimeter clean.

Text notification to RP-GC
Site Preparation8/12/20198/13/20198/12/2019PCANC
DetailsAndy J. Long
wrong inspection type
General Inspection3/19/20193/21/20193/22/2019PPASS
DetailsAndy J. Long
Sweeping and trash pickup completed.

RP stated he will have excavator haul off washout container and provide a new one for the upcoming sidewalk work.
General Inspection3/13/20193/19/20193/19/2019APEND
DetailsAndy J. Long
Trash has been picked up around both projects.

RP notified that excavator will be removing old washout today or tomorrow. New washout to be provided for sidewalk work later this week.

Follow up scheduled for 3/21 PM. No trackout or discharges at site.
General Inspection3/13/20193/13/20193/13/2019PPART
DetailsAndy J. Long
No trackout or discharges observed. Storm drain has sediment bag installed. Most trash is picked up.

Corrections needed:
- sweep gutter on Rim Street
- provide new concrete washout for upcoming flat work
- pick up any loose trash around site
- check storm drain bag for maintenance

Posted correction notice on adjacent project (same builder/RP). Compliance date Tuesday 3/19 12 PM
Tracking Control12/17/201812/17/201812/17/2018PFAIL
DetailsAndy J. Long
Trackout from this site and adjacent site. NO construction entrance. Trash and debris laying around site. End of day clean up and correction request or will issue SWO.
BMP Violation10/26/201810/26/201810/26/2018PFAIL
DetailsAndy J. Long
No concrete washout provided. Washout conducted directly onto the ground, adjacent to a irrigation canal (not flowing). 2nd violation regarding washout at this site. Sunroc driver also appear to wash his hopper and some of the truck off at site as well, which is not allowed.

Special Investigation fee assessed. Incident occurred 5:40 PM 10/25
Random Inspection10/9/201810/9/201810/9/2018PPART
DetailsAndy J. Long
No trackout or discharges.

Correction request:
- provide trash containment and pick up loose trash around site.
- instruct crews not to park or drive in the mud to prevent trackout.
BMP Violation9/24/20189/25/20189/28/2018PPASS
DetailsAndy J. Long
Oil spill and stain has been cleaned. DI bag that captured some of the spill was removed and discarded. New DI bag in place. Site foundation in progress. Request to RP to sweep everyday that earthwork is occuring for foundation backfill.
BMP Violation9/24/20189/24/20189/24/2018PFAIL
DetailsAndy J. Long
Spill absorbent not cleaned up. Oil stains still visible. DI bag with contaminated dirt has not been changed out. Deadline extended to tomorrow PM
Site Preparation9/21/20189/21/20189/21/2018PFAIL
DetailsAndy J. Long
ESC General Permit, WIP on foundation, no site prep was required to start.

- Need to post new ESC sign for new project.
- Need a lined concrete washout or prohibit onsite chute rinsing.
- need to clean up spill of hydraulic oil in gutter and street on Rim next to storm drain.