Site Final | 2/12/2020 | 2/13/2020 | 2/13/2020 | P | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 2/13/2020 | 2/13/2020 | 2/13/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 2/12/2020 | 2/12/2020 | 2/12/2020 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/27/2020 | 1/27/2020 | 1/27/2020 | | PASS |
Michael Zawacki
|
|
|
Home is completed. Hillside has blankets installed, no issues. Lot has been sodded. All construction materials have been removed.
|
General Inspection | 1/10/2020 | 1/10/2020 | 1/10/2020 | | CANC |
Michael Zawacki
|
|
|
|
General Inspection | 12/26/2019 | 12/26/2019 | 12/26/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/11/2019 | 12/11/2019 | 12/11/2019 | | PASS |
Michael Zawacki
|
|
|
About half of home is wrapped and has scaffolding. No ESC issues, stabalization in progress.
|
General Inspection | 11/26/2019 | 11/26/2019 | 11/26/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/8/2019 | 11/8/2019 | 11/8/2019 | | PASS |
Michael Zawacki
|
|
|
Sod installed on flats. Retaing wall and stairs completed on uphill side. TRM and blankets installed on hillside.
|
General Inspection | 10/24/2019 | 10/24/2019 | 10/24/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/9/2019 | 10/9/2019 | 10/9/2019 | | PASS |
Michael Zawacki
|
|
|
Mini excavator working on retaining wall on uphill side of home. Still some material stored on site.
|
General Inspection | 9/23/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Michael Zawacki
|
|
|
Mini excavator working along uphill side of driveway, looks like prep for a wall. Backfill being loaded into trailer. Some compacted dirt on rpoad.
|
General Inspection | 9/11/2019 | 9/11/2019 | 9/11/2019 | | PASS |
Michael Zawacki
|
|
|
Looks like road has been scraped clean. Materials still stored on road.
|
General Inspection | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | PART |
Michael Zawacki
|
|
|
Hillside above home has no protection. Road is dirty around the area they are using for storage.
|
General Inspection | 8/22/2019 | 8/22/2019 | 8/22/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/7/2019 | 8/7/2019 | 8/7/2019 | | PART |
Michael Zawacki
|
|
|
Materials still stored in road. Drywall work has begun, scraps piled in front of home. Road is dirty.
|
General Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 | | PASS |
Michael Zawacki
|
|
|
No workers on site. Uphill side my cause issues if not stabalized before rain starts.
|
General Inspection | 7/8/2019 | 7/8/2019 | 7/8/2019 | P | PASS |
Michael Zawacki
|
|
|
Pit run drive drive and walkway installed. Some material stored on road. No runoff from site.
|
General Inspection | 5/29/2019 | 5/29/2019 | 5/29/2019 | P | PASS |
Michael Zawacki
|
|
|
Some building material stored in road. Front lot is pitrun. No ESC issues, no runoff going down hill.
|
General Inspection | 3/27/2019 | 3/27/2019 | 3/27/2019 | P | FAIL |
Michael Zawacki
|
|
|
Lots of dirt on road in front of house. Previously talked to builde about keeping site clean.
|
General Inspection | 3/7/2019 | 3/7/2019 | 3/7/2019 | P | PEND |
Michael Zawacki
|
|
|
Framers on site. Some dirt on road from backfilling. Framers said they will let RP know to get it cleaned up.
|
General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PART |
Michael Zawacki
|
|
|
Most styrofoam cleaned, still one area where fence is under load. Fresh concrete pour, no dumped washout.
|
General Inspection | 1/17/2019 | 1/29/2019 | 1/29/2019 | P | PART |
Michael Zawacki
|
|
|
Foundation poured, no dumped washout. Silt fence under heavy loads in areas. Lots of loose styrofoam around site, needs to be cleaned. Runoff risk from top of site.
|
General Inspection | 1/17/2019 | 1/17/2019 | 1/17/2019 | P | PASS |
Andy J. Long
|
|
|
WIP. Silt fence perimerter control is working. No discharges or muddy trackout extending out of culdesac.
- Need to work on the frozen mud that is now thawing directly in front of site to get a cleaner surface.
Homeowner is GC, builder onsite Chet Clark said he would clean up. Will need to watch stockpile of backfill if there is any left over after.
Notified Chet of washout requirements.
|
General Inspection | 11/27/2018 | 11/27/2018 | 11/27/2018 | P | FAIL |
Michael Zawacki
|
|
|
Wattle and silt fence has been installed, neither are trenched in and will do nothing to prevent run off. Multiple outpak washouts at site.
|
Site Preparation | 11/7/2018 | 11/8/2018 | 11/8/2018 | A | PASS |
Andy J. Long
|
|
|
930 am
Pre construciton review of ESC plan with RP-excavator Buzz and homeowner Fabian.
On downhill side of lot perimeter silt fence with J hook outlet will be install. WIll set back from street a bit to utilize the existing flat grassy area.
Review concrete washout containment options. Brooms for daily sweeping are on site. Homeowner has talked to neighbors. No sediment protection requested on downstream inlet due to disctance and large drainage area for system. Will keep dirt on site and monitor trackout.
Permit posted. Approved for construction.
|
Site Preparation | 11/7/2018 | 11/7/2018 | 11/8/2018 | P | CANC |
Andy J. Long
|
|
|
Fabin-please Fabin call to meet Phone #: ###-####
rescheduled
|