INSP-Final Inspection | 1/24/2019 | 1/25/2019 | 1/25/2019 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Matt is the contact Phone #: ###-#### Inspection requested via web by jeremiah robison
|
INSP-Sprinkler Rough-in/Hydro | 1/9/2019 | 1/10/2019 | 1/10/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in/Hydro | 12/28/2018 | 12/31/2018 | 12/31/2018 | P | FAIL |
Troy Cobbley
|
|
|
System 1 failed due to a visible loss of pressure on the guage. System 2 failed due to not all of the piping in the Kitchen area has been installed. I also noted that the supply piping to the FDC was not hydro tested yet but will need to be as per NFPA 13.
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 12/7/2018 | 12/10/2018 | 12/10/2018 | P | PART |
Jim Page
|
|
|
Inspection for fire sprinkler piping in doghouse/bump out complete.
DOGHOUSES Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 11/29/2018 | 12/3/2018 | 12/3/2018 | A | CANC |
Troy Cobbley
|
|
|
The building dept needs to approved the plan modifications prior to a fire sprinkler inspection for these areas.
doghouses Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 11/9/2018 | 11/13/2018 | 11/13/2018 | A | PART |
Tim Frost
|
|
|
Reviewed inspection comments made by Jim P. for area B. All of the comments seemed to be addressed correctly.
The area above each foyer is on hold until the hvac is installed. These areas are supposed to be supplied with heat. At a later date adequate heat shall be verified and or a heat sensor tied to the fire alarm panel may be required.
Area B Phone #: ###-#### >> Inspection requested via web by Matthew Lewis
|
INSP-Conference | 11/8/2018 | 11/9/2018 | 11/9/2018 | A | DONE |
Jim Page
|
|
|
Fire conference complete, an acceptable means of freeze protection has been approved, heaters will be installed in doghouses that are effected with room temperature sensors that will be linked to the fire alarm system. Cover is approved in areas that has passed RTC inspection and notated on city approved drawings, cover install is at GC discretion due to mechanical/electrical work that will be required for the proposed methed of freeze prevention.
on roof ESI would like to talk about the dog houses Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 11/8/2018 | 11/9/2018 | 11/9/2018 | A | FAIL |
Jim Page
|
|
|
Make corrections toupright heads that are blocked as discussed. Add heads in discussed areas next to draft-stops/combustible concealed spaces as discussed.
area B Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 10/31/2018 | 11/1/2018 | 11/1/2018 | P | PART |
Jim Page
|
|
|
Rough in spection for overhead fire sprinkler piping in requested area complete, notated city approved drawings with red ink area inspected. Cover is not approved until documentation can be provided for heat maintenance in attic spaces.
as late as you can please. Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PART |
Jim Page
|
|
|
Rough in spection for overhead fire sprinkler piping in requested area complete, notated city approved drawings with red ink area inspected. Cover is not approved until documentation can be provided for heat maintenance in attic spaces.
Part A Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in/Hydro | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | CANC |
Jim Page
|
|
|
Underground supply is under permit FIR18-00241, this requestb is cancelled.
with underground flush Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with green highlighter/red ink including date of inspection and areas approved for cover.
Partial for the area Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 10/5/2018 | 10/8/2018 | 10/8/2018 | P | CANC |
Jim Page
|
|
|
Rough in inspection rescheduled to coincide with underground flush on 9OCT2018
Partial for the area Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 9/24/2018 | 9/26/2018 | 9/26/2018 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with green highlighter/red ink including date of inspection and areas approved for cover.
Partial Rough-in for area "A" ( Memory Care) Matt Robison is point of contact Phone #: ###-#### Inspection requested via web by Randy Knutson
|
INSP-Sprinkler Rough-in | 9/24/2018 | 9/25/2018 | 9/24/2018 | A | CANC |
Jim Page
|
|
|
Partial Rough-in Inspection for area A (Memory Care). Matt Robison is point of contact. Phone #: ###-#### >> Inspection requested via web by Randy Knutson Inspection cancelled from web by: Randy Knutson
|
INSP-Sprinkler Rough-in | 9/11/2018 | 9/17/2018 | 9/18/2018 | P | PASS |
Jim Page
|
|
|
area C Phone #: ###-#### >> Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with pink highlighter/red ink areas approved for cover.
area d Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 8/21/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with green highlighter/red ink areas approved for cover.
Rough-in Inspection for section "D" Matt Robison is on site. Thanks Phone #: ###-#### Inspection requested via web by Randy Knutson
|
INSP-Sprinkler Rough-in/Hydro | 8/21/2018 | 8/22/2018 | 8/21/2018 | P | CANC |
Jim Page
|
|
|
Rough to cover for section "D" Matt Robison should be on site. Phone #: ###-#### >> Inspection requested via web by Randy Knutson Inspection cancelled from web by: Randy Knutson
|
INSP-Sprinkler Rough-in | 8/10/2018 | 8/13/2018 | 8/13/2018 | P | PART |
Jim Page
|
|
|
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with green highlighter/red ink areas approved for cover.
Area D Phone #: ###-#### Inspection requested via web by Matthew Lewis
|
INSP-Sprinkler Rough-in | 7/25/2018 | 7/26/2018 | 7/26/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Matthew Lewis
|