Information based on query as of Monday, May 13, 2024.
Permit Information
Permit NumberFIR18-00464
StatusFinaled
Name STATEFIRE DC SPECIALTIES
Site Address 3266 E BARBER VALLEY DR
Project NameVeranda @ barber Station
Customer Number 
ePlanReviewYes
Description
[Veranda at Barber Station]
The fire sprinkler scope of work consists of a single level memory care and assisted living center. There is above and below protection throughout. There is a combination of residential sprinklers and quick response type sprinklers. The systems is supplied by 8” underground piping to a 3” back flow preventer, 3” header and to two 3” wet systems. EQ Bracing is required and shown throughout. The system design is a combinations of grids and trees.

• Building A is under permit BLD17-04133
• Building B is under permit BLD18-00230
• The underground piping is under permit FIR18-00241

[BLD17-04133]
Building A
Permit for the construction of a 36,087 sq. ft. 45 room memory care center (foundation and site under BLD17-03587) with work to include the construction of a new wood framed building with all associated interior and exterior finishes per the approved plans. This building is fully fire sprinklered for area increase and occupancy type. CDM

Building B
Permit for the construction of a 37,328 sq. ft. 39 unit assisted living center (foundation and site under BLD17-03587) with work to include the construction of a new wood framed building with all associated interior ans exterior finishes per the approved plans. This building is fully fire sprinklered for area increase and occupancy type. CDM

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There is an AMM but it does not pertain to the fire sprinkler protection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/24/20191/25/20191/25/2019PPASS
DetailsJim Page
Final fire sprinkler inspection complete.

Matt is the contact Phone #: ###-#### Inspection requested via web by jeremiah robison
INSP-Sprinkler Rough-in/Hydro1/9/20191/10/20191/10/2019PDONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro12/28/201812/31/201812/31/2018PFAIL
DetailsTroy Cobbley
System 1 failed due to a visible loss of pressure on the guage. System 2 failed due to not all of the piping in the Kitchen area has been installed. I also noted that the supply piping to the FDC was not hydro tested yet but will need to be as per NFPA 13.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in12/7/201812/10/201812/10/2018PPART
DetailsJim Page
Inspection for fire sprinkler piping in doghouse/bump out complete.

DOGHOUSES Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in11/29/201812/3/201812/3/2018ACANC
DetailsTroy Cobbley
The building dept needs to approved the plan modifications prior to a fire sprinkler inspection for these areas.

doghouses Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in11/9/201811/13/201811/13/2018APART
DetailsTim Frost
Reviewed inspection comments made by Jim P. for area B. All of the comments seemed to be addressed correctly.

The area above each foyer is on hold until the hvac is installed. These areas are supposed to be supplied with heat. At a later date adequate heat shall be verified and or a heat sensor tied to the fire alarm panel may be required.


Area B Phone #: ###-#### >> Inspection requested via web by Matthew Lewis
INSP-Conference11/8/201811/9/201811/9/2018ADONE
DetailsJim Page
Fire conference complete, an acceptable means of freeze protection has been approved, heaters will be installed in doghouses that are effected with room temperature sensors that will be linked to the fire alarm system. Cover is approved in areas that has passed RTC inspection and notated on city approved drawings, cover install is at GC discretion due to mechanical/electrical work that will be required for the proposed methed of freeze prevention.

on roof ESI would like to talk about the dog houses Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in11/8/201811/9/201811/9/2018AFAIL
DetailsJim Page
Make corrections toupright heads that are blocked as discussed. Add heads in discussed areas next to draft-stops/combustible concealed spaces as discussed.

area B Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in10/31/201811/1/201811/1/2018PPART
DetailsJim Page
Rough in spection for overhead fire sprinkler piping in requested area complete, notated city approved drawings with red ink area inspected. Cover is not approved until documentation can be provided for heat maintenance in attic spaces.

as late as you can please. Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in10/23/201810/24/201810/24/2018APART
DetailsJim Page
Rough in spection for overhead fire sprinkler piping in requested area complete, notated city approved drawings with red ink area inspected. Cover is not approved until documentation can be provided for heat maintenance in attic spaces.

Part A Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro10/8/201810/9/201810/9/2018ACANC
DetailsJim Page
Underground supply is under permit FIR18-00241, this requestb is cancelled.

with underground flush Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in10/8/201810/9/201810/9/2018APART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with green highlighter/red ink including date of inspection and areas approved for cover.

Partial for the area Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in10/5/201810/8/201810/8/2018PCANC
DetailsJim Page
Rough in inspection rescheduled to coincide with underground flush on 9OCT2018

Partial for the area Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in9/24/20189/26/20189/26/2018PPART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with green highlighter/red ink including date of inspection and areas approved for cover.

Partial Rough-in for area "A" ( Memory Care)
Matt Robison is point of contact Phone #: ###-#### Inspection requested via web by Randy Knutson
INSP-Sprinkler Rough-in9/24/20189/25/20189/24/2018ACANC
DetailsJim Page
Partial Rough-in Inspection for area A (Memory Care).
Matt Robison is point of contact. Phone #: ###-#### >> Inspection requested via web by Randy Knutson Inspection cancelled from web by: Randy Knutson
INSP-Sprinkler Rough-in9/11/20189/17/20189/18/2018PPASS
DetailsJim Page
area C Phone #: ###-#### >> Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in8/27/20188/28/20188/28/2018APART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with pink highlighter/red ink areas approved for cover.

area d Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in8/21/20188/22/20188/22/2018PPASS
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with green highlighter/red ink areas approved for cover.

Rough-in Inspection for section "D"
Matt Robison is on site.
Thanks Phone #: ###-#### Inspection requested via web by Randy Knutson
INSP-Sprinkler Rough-in/Hydro8/21/20188/22/20188/21/2018PCANC
DetailsJim Page
Rough to cover for section "D"
Matt Robison should be on site. Phone #: ###-#### >> Inspection requested via web by Randy Knutson Inspection cancelled from web by: Randy Knutson
INSP-Sprinkler Rough-in8/10/20188/13/20188/13/2018PPART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated city approved drawings with green highlighter/red ink areas approved for cover.

Area D Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in7/25/20187/26/20187/26/2018PPASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Matthew Lewis