Permit Information
Permit NumberFIR18-00562
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 2105 S FEDERAL WAY
Project NameSkyline Apartments Bldg C
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Skyline Apartments Building C - Udg Only] - Quick Permit
Install a new 2"x41'+- CPVC line into the Apartment Bldg. This is only for the underground line. A full fire sprinkler submittal will follow at a later date.

[BLD17-04625]
The NFPA 13-R fire sprinkler system is used for occupancy and for story increase. To construct a 25,320 square foot three story VB Type of Construction apartment building (8,458 sq. ft. 1st story and 8,431 sq. ft. 2nd story and 8,431 sq. ft. 3rd story). Each unit is 1 story. Work is to include concrete footings, concrete foundations, concrete slabs on grade, wood stud bearing walls, wood stud shear walls, fiberglass shingles, 1-hr dwelling unit separations, 1 hour fire barriers for stair and breezeways, rated doors in breezeway, interior nonbearing walls, millwork, and finishes. Special Inspection is NOT required. The roof truss design is a deferred submittal item. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13-R as regulated by the Fire Department. Separate fire sprinkler permits shall be obtained prior to beginning any modification or installation work on such systems. **ajs**192 unit apartment project with (9) apartment buildings, clubhouse, and associated site work
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/28/20193/28/20193/28/2019PPASS
DetailsJim Page
Final inspection for underground supply complete.



Gerardo Arce is the contact. This inspection has already been done, reach out to the contact for more information. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro3/26/20193/26/20193/26/2019PDONE
DetailsJim Page
Hydrstatic test for underground supply witnessed, no pressure loss observed.

Gerardo Arce is the contact. This inspection is for a Hydro only. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush3/18/20193/20/20193/20/2019PPASS
DetailsTroy Cobbley
underground flush witnessed.

Gerardo Arce is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush2/1/20192/4/20192/4/2019PFAIL
DetailsJim Page
Could not complete flush, underground valves were not accessable at time that flush could be completed due to dirt cover/bent valve box.

Underground hydro/flush
Gabriel Garduno is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush1/24/20191/29/20191/29/2019AFAIL
DetailsJim Page
Point of contact could not be reached.

Gerarrdo is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro11/8/201811/13/201811/13/2018PCANC
DetailsTroy Cobbley
Problem with hydro pump

Hydro Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Supply line flush11/8/201811/13/201811/13/2018PCANC
DetailsTroy Cobbley
Not ready due to pump problems

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/29/201810/30/201810/30/2018APASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.


Phone #: ###-#### Inspection requested via web by Stan Beus