INSP-Final Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Final Inspection | 6/15/2019 | 6/17/2019 | 6/17/2019 | A | CANC |
Troy Cobbley
|
|
|
Contractor was not ready for inspection when I wasContact Andrew Larson 208###-#### 30 min prior to UG Final Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in/Hydro | 6/13/2019 | 6/14/2019 | 6/14/2019 | A | PASS |
Troy Cobbley
|
|
|
The underground hydro test was witnessed.
|
INSP-Sprinkler Rough-in/Hydro | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | CANC |
Troy Cobbley
|
|
|
Point of Contact is Andrew Larson ###-#### please call him 30 min prior to UG Hydro insp start time.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Conference | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | DONE |
Troy Cobbley
|
|
|
I let Andrew know that if they need to repair the underground piping a new flush and hydro would be required.
|
INSP-Sprinkler Rough-in/Hydro | 6/6/2019 | 6/7/2019 | 6/7/2019 | A | CANC |
Troy Cobbley
|
|
|
The underground supply piping is still losing pressure. Was not able to start a test.
Contact Andrew Larson ###-#### 30 min prior to UG Hydro start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Final Inspection | 6/5/2019 | 6/6/2019 | 6/6/2019 | A | FAIL |
Troy Cobbley
|
|
|
The underground hydro failed due to visible loss on the guage.
Contact Andrew Larson ###-#### 30 Min Prior to UG Final start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Supply line flush | 5/22/2019 | 5/22/2019 | 5/22/2019 | A | PASS |
Troy Cobbley
|
|
|
.The underground supply line flush was witnessed and a verified flow of over 1500 gpm
Contact Andrew Larson ###-#### 30 min prior to Flush Insp start pelase
Thank YOU, Teri Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 1/22/2019 | 1/23/2019 | 1/22/2019 | A | PASS |
Troy Cobbley
|
|
|
The remaining underground supply piping is ok for cover. Mechanical restraint was used and four additional 45 fittings have been used which will need to be included in the overhead hydraulic calculations.
Contact Leroy Anderson - ###-#### 30 min prior to UG RTC Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 1/18/2019 | 1/22/2019 | 1/18/2019 | A | CANC |
Troy Cobbley
|
|
|
Contact Leroy Anderson ###-#### 30 Min prior ot UG RTC insp. start please.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Sprinkler Rough-in | 12/27/2018 | 12/28/2018 | 12/28/2018 | A | PASS |
Troy Cobbley
|
|
|
Underground stub out is ok for cover.
rough to cover // Leroy Phone #: ###-####
|
INSP-Sprinkler Rough-in | 12/19/2018 | 12/20/2018 | 12/20/2018 | P | FAIL |
Troy Cobbley
|
|
|
No underground supply piping has even been installed yet per the general contractor
Contact Keith Orahood ###-#### 30 Min prior to UG RTC Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Sprinkler Rough-in | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | CANC |
Troy Cobbley
|
|
|
Contact Keith Orahood - ###-#### 30 min prior to UG RTC Insp start please.
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|