INSP-Final Inspection | 7/17/2019 | 7/19/2019 | 7/19/2019 | A | CANC |
Jim Page
|
|
|
Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
|
INSP-Final Inspection | 7/19/2019 | 7/19/2019 | 7/19/2019 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Sprinkler Rough-in | 6/24/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Jim Page
|
|
|
Rough in and rough to cover inspections for overhead fire sprinkler piping in new addition complete, demo work, where required, for fire sprinkler piping in existing building to be completed at a later date. Awaiting final inspection request from the fire alarm vendor to final fire sprinkler systems.
Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 6/4/2019 | 6/6/2019 | 6/6/2019 | P | DONE |
Jim Page
|
|
|
Fire pump commissioning complete.
Fire pump start up test. Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
|
INSP-Sprinkler Rough-in/Hydro | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed (Total of 9 systems), no pressure loss observed.
Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in/Hydro | 4/4/2019 | 4/5/2019 | 4/4/2019 | A | CANC |
Jim Page
|
|
|
Cordinate Inspection with Lonnie Greenfield Phone #: ###-#### >> Inspection requested via web by Christophe Wilson Inspection cancelled from web by: Christophe Wilson
|
INSP-Sprinkler Rough-in | 3/28/2019 | 3/29/2019 | 3/29/2019 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed for system #2 and #6. Revised earthquake calculations are required for the 6" main. Piping in these areas are ok for cover. Piping near the new fire pump has not been installed.
Cordinate Inpsection with Lonnie Greenfield Phone #: ###-#### Inspection requested via web by Christophe Wilson
|
INSP-Sprinkler Rough-in | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping on system 1 complete, notated city approved drawings where system 1 is approved for cover.
Cordinate inpsection with Lonnie Greenfield Phone #: ###-#### Inspection requested via web by Christophe Wilson
|