Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberFIR18-00964
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 601 W GOWEN RD
Project NameWestern Power Sports Warehouse
Customer Number 
ePlanReviewYes
Description
Install 3 new ESFR Systems in new addition, Install new fire pump, Install new risers and supply to 6 existing sytems, commision new fire pump then decomission existing fire pump.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/17/20197/19/20197/19/2019ACANC
DetailsJim Page
Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Final Inspection7/19/20197/19/20197/19/2019APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

INSP-Sprinkler Rough-in6/24/20196/24/20196/24/2019PPASS
DetailsJim Page
Rough in and rough to cover inspections for overhead fire sprinkler piping in new addition complete, demo work, where required, for fire sprinkler piping in existing building to be completed at a later date. Awaiting final inspection request from the fire alarm vendor to final fire sprinkler systems.

Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
INSP-Sprinkler Rough-in6/4/20196/6/20196/6/2019PDONE
DetailsJim Page
Fire pump commissioning complete.

Fire pump start up test. Lonnie Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Sprinkler Rough-in/Hydro4/8/20194/9/20194/9/2019ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping witnessed (Total of 9 systems), no pressure loss observed.

Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
INSP-Sprinkler Rough-in/Hydro4/4/20194/5/20194/4/2019ACANC
DetailsJim Page
Cordinate Inspection with Lonnie Greenfield Phone #: ###-#### >> Inspection requested via web by Christophe Wilson Inspection cancelled from web by: Christophe Wilson
INSP-Sprinkler Rough-in3/28/20193/29/20193/29/2019APASS
DetailsTroy Cobbley
Rough-in passed for system #2 and #6. Revised earthquake calculations are required for the 6" main. Piping in these areas are ok for cover. Piping near the new fire pump has not been installed.

Cordinate Inpsection with Lonnie Greenfield Phone #: ###-#### Inspection requested via web by Christophe Wilson
INSP-Sprinkler Rough-in3/4/20193/5/20193/5/2019APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on system 1 complete, notated city approved drawings where system 1 is approved for cover.

Cordinate inpsection with Lonnie Greenfield Phone #: ###-#### Inspection requested via web by Christophe Wilson