INSP-Final Inspection | 9/11/2019 | 9/12/2019 | 9/12/2019 | A | PASS |
Jim Page
|
|
|
Previously noted items have been corrected, downstairs room labeled as pantry will stay as a pantry. Final fire sprinkler inspection is complete.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 9/5/2019 | 9/6/2019 | 9/6/2019 | A | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, hole for sprinkler head relocate has not been patched, inspection request will be rescheduled for a later date.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | FAIL |
Jim Page
|
|
|
Head in lower bedroom is 10ft 6 off of wall, needs to be 10 foot or less. Basement pantry is not a pantry, discussed room with Mark Stumbaugh, fire sprinkler plan reviewer and he agrees that room needs a sprinkler head. Irrigation needs to be active to test irrigation shutdown when flow switch activates, no flow test performed.
Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Final Inspection | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | CANC |
Jim Page
|
|
|
Wrong permit was entered for inspection request, this inspection is cancelled, was not requested by this permit holder.
Matt Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Jim Page
|
|
|
Tenting inspection complete, overehad fire sprinkler piping approved for cover.
Tenting inspection, please call Alicia before heading out to confirm it is ready. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 1/14/2019 | 1/14/2019 | 1/14/2019 | P | PART |
Jim Page
|
|
|
Rough in inspection for overhead fire sprinkler piping complete, piping between conditioned spaces approved for cover, areas requiring tenting not approved for cover until tenting install is inspected and approved.
|
INSP-Sprinkler Rough-in/Hydro | 1/11/2019 | 1/14/2019 | 1/14/2019 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed with antifreeze puped up to city pressure, no pressure loss observed.
Call before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|