Description
INSTALL NEW PENDENT AND UPRIGHT SPRINKLER HEADS TO THE NEW WALL AND CEILING LAYOUT ON THE FIRST FLOOR. EXTEND THE EXISTING DRY SYSTEM UNDER THE NEW MECHANICAL PLATFORM ON THE ROOF.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/22/201910/23/201910/23/2019APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

contact Lonnie to cordinate final inpsection Phone #: ###-#### Inspection requested via web by Christophe Wilson
INSP-Sprinkler Rough-in10/15/201910/15/201910/15/2019APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping above hardlid and suspeneded ceiling, west coridor complete, area inspected approved for cover.

Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Sprinkler Rough-in8/22/20198/23/20198/23/2019APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.

Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Sprinkler Rough-in8/19/20198/20/20198/20/2019PPART
DetailsJim Page
Rough in inspection for dry system addition on top level of parking structure complete.

Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Sprinkler Rough-in8/8/20198/9/20198/9/2019APART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping in area of work complete, notated the city approved drawings with red ink areas approved for cover.

Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Sprinkler Rough-in7/26/20197/26/20197/26/2019APART
DetailsJim Page
Partial rough to cover inspectionfor overhead fire sprinkler piping in area of work complete, notated the city approved drawings with red ink areas approved for cover.

Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
INSP-Sprinkler Rough-in6/11/20196/12/20196/12/2019APART
DetailsJim Page
Rough to cover inspection for sprinkler piping above hardlids in locker rooms complete, approved for cover.