Information based on query as of Tuesday, April 30, 2024.
Permit Information
Permit NumberFIR19-00516
StatusIssued
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 502 W FRONT ST
Project NameHome2 Suites Hotel and Garage
Customer Number 
ePlanReviewYes
Description
Shilo shall connect to the previously installed dedicated UG feed in the hotel and install a new 6" backflow and extend new feed main to the fire pump room in the parking garage. From the fire pump room in the parking garage shilo will install 14 new systems to protect the 7 level hotel and the 6 level attached parking garage. The new systems will consist of a manual standpipe system to the two stairs in the parking garage and the one stair in the hotel. Seven wet systems originating in hotel stair A shall protect the seven levels of the hotel and six dry systems, two of which originate in the fire pump room and the other four originate in the hotel stair will protect the six levels of the parking garage. The building shall be protected per NFPA 13(2016) for light and ordinary hazards.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in8/11/20208/12/20208/12/2020PPART
DetailsJim Page
Rough to cover inspection for remaining areas on levels 2 through 5 complete, areas inspected approevd for cover.

Tony Cetani is the contact. This RTC is for the hotel corridors levels 2-5. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro8/11/20208/12/20208/12/2020PPART
DetailsJim Page
Hydrostatic test for levels 2 through 5 witnessed, no pressure loss observed at riser provided gauges.

Tony Cetani is the contact. This hydro is for the 5th floor. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro8/6/20208/11/20208/11/2020PCANC
DetailsJim Page
Tony Cetani is the contact. This hydro is for floors 2-5. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in8/6/20208/7/20208/7/2020APART
DetailsJim Page
Rough to cover inspection for elevator lobbies 2 through 7 complete, elevator lobbies 2 through 7 approved for cover.

Jon Beazer is the contact. This RTC is for the Elevator Lobbies floors 2-7. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro7/17/20207/20/20207/20/2020APART
DetailsJim Page
Hydrostatic test for level 1 wet system witnessed, no pressure loss observed at riser provided gauge.

Tony Cetani is the contact. This will be for the 1st floor Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in7/17/20207/20/20207/20/2020APART
DetailsJim Page
Rough to cover inspection for level 1 hardlids complete, as well as grid area in kitchen and offices behind reception area, areas inspected approved for cover.

completeTony Cetani is the contact. This will be for the 1st floor Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in7/15/20207/16/20207/16/2020APART
DetailsJim Page
Rough to cover inspection for linen chute piping/heads complete, approved for cover.

Tony Cetani is the contact. Thanks! (: Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in7/14/20207/15/20207/15/2020PFAIL
DetailsJim Page
Wrong permit requested.

Bryan Collins is the contact. Thanks so much! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in7/13/20207/15/20207/14/2020ACANC
DetailsJim Page
Tony Cetani is the contact. This RTC is for the Linen Shoots. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in6/25/20206/26/20206/26/2020APASS
DetailsTroy Cobbley
Piping in the 7th floor resident rooms, that is above the soffits, is ok for cover. Also one pendant in the soffit in the west side common corridor. Tony adjusted some of the hangers while I was there.

Tony Cetani is the contact and this inspection will be for the 7th floor. Thanks so much!! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in6/8/20206/9/20206/9/2020APART
DetailsJim Page
Rough to cover inspection for hardlids in rooms on level 7 compete, hardlids in rooms on level 7 approved for cover. Room drop down ceilings to be inspected after install.



Tony Cetani is the contact. This inspection is for the 7th floor Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/26/20205/27/20205/27/2020APART
DetailsJim Page
Rough to cover inspection for lowered ceilings in suites on level 6 complete, lowered ceilings in suites on level 6 approved for cover.

Tony Cetani is the contact(: Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/15/20205/18/20205/18/2020APART
DetailsJim Page
Rough to cover inspection for lowered ceilings in suites on level 5 complete, lowered ceilings in suites on level 5 approved for cover.

Tony Cetani is the contact. This RTC is for the 5th floor only. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/11/20205/12/20205/12/2020APART
DetailsJim Page
Rough to cover inbspection for pool area and pool mech room complete, area inspected approved for cover.

Tony Cetani is the contact, the inspection is for the first floor. Thanks so much! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/6/20205/8/20205/8/2020APART
DetailsJim Page
Rough to cover inspection for lowered ceilings in suites on level 4 complete, lowered ceilings in suites on level 4 approved for cover.

Tony Cetani is the contact. The inspection will be floor to floor, in the elevator shaft Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in5/6/20205/7/20205/6/2020ACANC
DetailsJim Page
Tony Cetani is the contact. The inspection will be floor to floor, in the elevator shaft Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in4/28/20204/29/20204/29/2020APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping installed in floor joist cavity on level 6 complete, piping located in floor joist cavity on level 6 approved for cover, a follow up cover inspection will be required for piping above lowered ceilings. Brackets to be added in discussed locations.

Tony Cetani is the contact. Have a great day! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro4/17/20204/17/20204/17/2020PPART
DetailsJim Page
Rough to cover inspection for level 1 lobby restrooms, level 2 and level 3 room lowered ceilings is complete, areas inspected approved for cover.

Jon Beazer is the contact. 1st floor bathroom, 2nd and 3rd floor soffits Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in4/9/20204/10/20204/10/2020APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping installed in floor joist cavity on level 5 complete, piping located in floor joist cavity on level 5 approved for cover, a follow up cover inspection will be required for piping above lowered ceilings.

Jon Beazer is the contact as well as Tony Cetani ###-####. The inspection will be for the fifth floor. Thanks (: Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in4/9/20204/9/20204/9/2020PCANC
DetailsJim Page
Rescheduled to coincide with ESI inspection times, inspection request moved to 10APR2020 AM time block, this request is cancelled.

Jon Beazer is the contact as well as Tony Cetani ###-####. The inspection will be for the fifth floor. Thanks (: Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in3/30/20203/31/20204/1/2020PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping installed in floor joist cavity on level 4 complete, piping located in floor joist cavity on level 4 approved for cover, a follow up cover inspection will be required for piping above lowered ceilings.



Tony Cetani is the contact. This rough-in is for the 4th floor hotel. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in3/16/20203/17/20203/17/2020PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping installed in floor joist cavity on levels 2 and 3 complete, piping located in floor joist cavity on levels 2 and 3 approved for cover, a follow up cover inspection will be required for piping above lowered ceilings.

Tony Cetani is the contact. The inspections are for the 2nd and 3rd floor. The inspector asks that it''ll be in the PM. Thanks! (: Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection3/13/20203/16/20203/16/2020PPART
DetailsJim Page
Final fire sprinkler inspection for TCO phase 1 complete.

Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro3/13/20203/16/20203/16/2020ADONE
DetailsJim Page
24 hour air test for newly installed dry pipe valves, trim and new piping to split the systems has been witnessed, no ressure loss observed.

Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in3/13/20203/13/20203/13/2020PPART
DetailsJim Page
24 hour air test started at 0930 with 41 PSI all systems.

Tony Cetani is the contact. This is to be a 24 hour air test. Thank you for the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection3/5/20203/6/20203/6/2020AFAIL
DetailsJim Page
Trip test time for level 1dry system with 2 open orifices was 1 minute and 2 seconds, level 6 dry system trip time was 1 minute and 12 seconds, per NFPA13, section 7.2.3.6.1, ordinary hazard with 2 open orifices trip time is required to be 50 seconds or less.

Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in3/5/20203/5/20203/5/2020APART
DetailsJim Page
Rough in inspection for TCO phase 1 fire sprinkler piping is complete.
INSP-Sprinkler Rough-in/Hydro3/5/20203/5/20203/5/2020PDONE
DetailsJim Page
24 hour air test is complete.
INSP-Final Inspection3/5/20203/5/20203/5/2020PFAIL
DetailsJim Page
Temp heat in riser stairwell was not operational, gas was shut off, plastic sheeting does not cover entire opening, 40 degrees was not maintained as discussed, provide adequate freeze protection as discussed.

Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in3/2/20203/4/20203/4/2020PDONE
DetailsJim Page
Fire pump commissioning complete.

Tony Cetani is the contact for this inspection. He is requesting a fire pump start up. He would like it at the end of day if possible. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro3/4/20203/4/20203/4/2020PPART
DetailsJim Page
24 hour air test started at 12PM with 41 PSI on all dry systems.
INSP-Conference3/4/20203/4/20203/4/2020PCANC
DetailsJim Page
Tony Cetani is the contact, this inspection is for a 24hr air test. Thanks for all the hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro3/3/20203/3/20203/3/2020PDONE
DetailsJim Page
Hydrostatic test for dry systems 2 thru 6 witnessed, no pressure loss observed. Hydrostatic test for parking garage dry systems complete.

Tony Cetani requesting a Hydro.
###-####

Thank you Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro2/26/20202/27/20202/27/2020PPART
DetailsJim Page
Hydrostatic tests for 1st floor garage, Precast stair tower standpipe and the Northeast stair tower standpipe have been witnessed, no pressure loss observed.

Tony Cetani will be the contact. he is needing a hydro first floor garage and Precast Stairs. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in2/19/20202/21/20202/20/2020ACANC
DetailsJim Page
Tony is the contact. He is wanting a Fire Pump Start Up done. Thanks for all you do! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Conference2/18/20202/18/20202/18/2020PDONE
DetailsJim Page
Fire conference is complete.

Tony Cetani is the contact for this consultation. He is requesting an AM appointment today if possible. Thank you for your help.
Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in1/27/20201/27/20201/27/2020PPART
DetailsJim Page
Rough to cover inspection for overehad fire sprinkler piping located above level 1 parking garage hardlids complete, parking garage level 1 hardlids approved for cover. Rough to cover inspection for level 1 overhead fire sprinkler piping above hardlids on exterior canopy complete, exterior canopy with fire sprinkler piping approved for cover.

Tony Cetani is requesting a Rough to Cover on 1st Floor Dry Pendant Area in Garage.
Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Conference1/6/20201/6/20201/6/2020PDONE
DetailsJim Page
Fire conference complete, discussed small changes to fire sprinkler main in parking garage routing by exit doors, main was shown directly in front of exit doors, minor changes to be made to get main farther way from doorway entry. Changes will be notated on the as-builts for items discussed today.

Tony Phone #: ###-####
INSP-Sprinkler Rough-in1/6/20201/6/20201/6/2020PCANC
DetailsJim Page
Request was for a conference, this request is cancelled.

Tony Phone #: ###-####
INSP-Sprinkler Rough-in11/5/201911/6/201911/6/2019APART
DetailsJim Page
Rough to cover inspection for mock up room 223 complete. Fire sprinkler plans have to be re-submitted due to required changes, will verify pipe sizing for room 223 after redesign is approved, room 223 approved for cover at contractors discretion, if pipe sizing does not match city approved drawings then corrections to piping in room 223 will be required.

Tony Cetani is the field contact. RTC is for the second floor. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in9/26/20199/27/20199/27/2019APASS
DetailsJim Page
Rough to cover inspection for undergound supply and remote FDC piping complete, approved for cover.

Jeff Chaney is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus