Permit Information
Permit NumberFIR19-00661
StatusFinaled
Name AMERICAN FIRE PROTECTION LLC
Site Address 4100 W LIBBY LN
Project NameSUITE OCCUPANCY SEPERATION
Customer Number 
ePlanReviewYes
Description
AMERICAN WILL INSTALL A NEW 12.1 GALLON ANTIFREEZE SYSTEM USING THE NEW UL LISTING LFP ANTIFREEZE. MOST PIPE AND HEADS WILL BE UNDER THE CEILING EXPOSED. THE ATTIC SPACE IS LESS THEN 2" TALL AND USE CCS HEADS.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/5/20206/11/20206/12/2020PPASS
DetailsTroy Cobbley
Permit finaled.

Phone #: ###-#### Inspection requested via web by Michelle Cooper
INSP-Final Inspection5/18/20205/21/20205/21/2020AFAIL
DetailsTroy Cobbley
Provide a one hour rated riser room, provide heat for the riser room as discussed, provide ball drip for the FDC, provide forward flush testing, provide walk through to verify final sprinkler head placement. All interconnections with the FACP tested ok. Inspection requested via web by Connie Danes
INSP-Final Inspection4/9/20204/14/20204/14/2020AFAIL
DetailsJim Page
Fire sprinkler system is required to be supervised per the 2015 IFC, section 903.4.

Josh Danes Cell Number: ###-#### Phone #: ###-#### Inspection requested via web by Connie Danes
INSP-Sprinkler Rough-in1/30/20201/30/20201/30/2020PPASS
DetailsJim Page
Previously noted items have been corrected.

Phone #: ###-#### Inspection requested via web by Connie Danes
INSP-Sprinkler Rough-in1/23/20201/24/20201/24/2020PFAIL
DetailsTroy Cobbley
Need city approved plans that match the layout of the installed piping. Need through bolts for the earthquake attachments at the roof structure.

Rough in for Cover - Jim will attend Phone #: ###-#### Inspection requested via web by Connie Danes
INSP-Sprinkler Rough-in1/22/20201/23/20201/24/2020PCANC
DetailsTroy Cobbley
Cover Inspection, Jim will attend Phone #: ###-#### Inspection requested via web by Connie Danes
INSP-Sprinkler Rough-in/Hydro1/8/20201/9/20201/9/2020APASS
DetailsTroy Cobbley
Overhead Hydro test witnessed with no pressure loss.

, Barry will attend. Phone #: ###-#### Inspection requested via web by Connie Danes
INSP-Sprinkler Rough-in12/10/201912/12/201912/12/2019PCANC
DetailsTroy Cobbley
Cancel per Barry Phone #: ###-#### Inspection requested via web by Connie Danes
INSP-Supply line flush12/9/201912/9/201912/9/2019PPASS
DetailsTroy Cobbley
Underground flush witnessed.

Barry Phone #: ###-#### Inspection requested via web by Connie Danes
INSP-Sprinkler Rough-in/Hydro12/6/201912/6/201912/6/2019PPASS
DetailsTroy Cobbley
Underground hydro test witnessed.

Phone #: ###-#### Inspection requested via web by Connie Danes
INSP-Sprinkler Rough-in11/26/201911/27/201911/27/2019APASS
DetailsTroy Cobbley
The underground tie-in piping is ok for cover.
Phone #: ###-#### Inspection requested via web by Connie Danes
INSP-Sprinkler Rough-in11/11/201911/12/201911/12/2019PPASS
DetailsTroy Cobbley
Underground supply piping is ok for cover.

Phone #: ###-#### Inspection requested via web by Connie Danes
INSP-Sprinkler Rough-in11/7/201911/8/201911/8/2019PCANC
DetailsTroy Cobbley
Phone #: ###-#### Inspection requested via web by Connie Danes