Final | 1/27/2020 | 1/28/2020 | 1/28/2020 | A | PASS |
Jack Reynolds
|
|
|
Final for Area B - Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy - condensates will be fixed at units through TML permit - final ok - will sign occ card when all other mech permits are finished
|
Final | 1/27/2020 | 1/27/2020 | 1/27/2020 | P | FAIL |
Jack Reynolds
|
|
|
Final for Area B. Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy - fireplace gas valves on unit 202,206 and 1st floor need to be accessible - several condensates on hvac units are broken and need fixed
|
Final | 1/16/2020 | 1/17/2020 | 1/17/2020 | A | PART |
Jack Reynolds
|
|
|
Final - Area A. Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy Temp final ok on area A units 103,104,105,106, lobby 203, 204, 205, 302 and parking garage
|
Final | 1/15/2020 | 1/16/2020 | 1/16/2020 | A | NR |
Jack Reynolds
|
|
|
Final Area A - Contact: ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy - condensate for mini split in parking garage not finished - documents for hydronics bypass ok
|
Conference | 1/13/2020 | 1/13/2020 | 1/13/2020 | A | DONE |
Jack Reynolds
|
|
|
Called and talked with Gustavo about items needed for TCO -will need documents stating bypasses on hydronics are ok not being installed in system - condensate for mini split system in parking garage needs installed
|
Pressure Test | 10/18/2019 | 10/18/2019 | 10/18/2019 | P | PART |
Jack Reynolds
|
|
|
Contact: Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy - 60lb gas pressure test on 1st floor main area A&B
|
Pressure Test | 10/7/2019 | 10/7/2019 | 10/7/2019 | P | PASS |
Jack Reynolds
|
|
|
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy - 100lb main hydronic 1st and 2nd floor area A/B ok
|
Pressure Test | 9/18/2019 | 9/18/2019 | 9/18/2019 | P | PASS |
Jack Reynolds
|
|
|
Contact: Robert Church ###-####.
Pressure test for 2nd and 3rd floor area B. Phone #: ###-#### Inspection requested via web by Brent Lacy - 60lb gas pressure test on mains 2rd and 3th floor area A&B ok
|
Pressure Test | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | PASS |
Jack Reynolds
|
|
|
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy - 20lb gas pressure test on 206,202 ,101,102,107 units ok
|
Pressure Test | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | PASS |
Jack Reynolds
|
|
|
3rd floor hydronics // Robert Phone #: ###-#### - 3rd floor 100lb hydronics main ok
|
Rough-in | 8/7/2019 | 8/8/2019 | 8/8/2019 | A | FAIL |
Jack Reynolds
|
|
|
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy - main supply line of hydronics on 3rd floor has a leak. crew is working on this reschedule
|
Pressure Test | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | FAIL |
Jack Reynolds
|
|
|
Contact: Craig Lacy ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy -105, 204 area A hydronics pressure test fail - 201,206,207,208 20lb gas pressure test ok area B
|
Pressure Test | 7/11/2019 | 7/11/2019 | 7/11/2019 | P | FAIL |
Jack Reynolds
|
|
|
hydronics and gas test - hydronics and gas test not ready still. Reschedule when when 100lb hydronics and 20lb gas tests are ready
|
Pressure Test | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | NR |
Jack Reynolds
|
|
|
hydronics and gas test
|
Pressure Test | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | NR |
Jack Reynolds
|
|
|
Contact: Craig Lacy ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy - not ready talked with Gustavo and rescheduled with him tomorrow morning
|
Pressure Test | 6/28/2019 | 6/28/2019 | 6/28/2019 | P | PASS |
Jack Reynolds
|
|
|
Contact: ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy - Area B 3rd floor southside 3 units only 20lb gas pressure test ok
|
Pressure Test | 5/31/2019 | 5/31/2019 | 5/31/2019 | P | PART |
Jack Reynolds
|
|
|
Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy - Area A mec rooms 103,104,106,203,204,205 60lb gas pressure test ok
|
Pressure Test | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Jack Reynolds
|
|
|
one unit on the 1st floor NW middle pressure test and protective tape at penetration one unit on 2nd floor NE corner pressure test - 20lb gas pressure test on 1st and 2nd floor northbuilding 4 units on the 1st and 3 units on the 2nd
|
Pressure Test | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | NR |
Jack Reynolds
|
|
|
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy - 4 units on the 1st floor north side had one unit that needed some work finished - 3 units on 2nd floor north side had one unit that needed some work finished. rescheduled for this afternoon
|
Pressure Test | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PART |
Jack Reynolds
|
|
|
Contact: Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy - 3rd floor 20lb gas pressure test for gas line to bbq and kitchen on front building ok
|