Permit Information
Permit NumberMEC19-00240
StatusFinaled
Name LACY MECHANICAL INC
Site Address 3075 W CRESCENT RIM DR
Project Name 
Customer Number18110-1-1-
ePlanReviewNo
Description
New: Installing hydronic and gas piping for Crescent Rim Condos.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final1/27/20201/28/20201/28/2020APASS
DetailsJack Reynolds
Final for Area B - Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy
- condensates will be fixed at units through TML permit
- final ok
- will sign occ card when all other mech permits are finished
Final1/27/20201/27/20201/27/2020PFAIL
DetailsJack Reynolds
Final for Area B. Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy
- fireplace gas valves on unit 202,206 and 1st floor need to be accessible
- several condensates on hvac units are broken and need fixed
Final1/16/20201/17/20201/17/2020APART
DetailsJack Reynolds
Final - Area A. Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy
Temp final ok on area A units 103,104,105,106, lobby
203, 204, 205,
302 and parking garage
Final1/15/20201/16/20201/16/2020ANR
DetailsJack Reynolds
Final Area A - Contact: ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy
- condensate for mini split in parking garage not finished
- documents for hydronics bypass ok
Conference1/13/20201/13/20201/13/2020ADONE
DetailsJack Reynolds
Called and talked with Gustavo about items needed for TCO
-will need documents stating bypasses on hydronics are ok not being installed in system
- condensate for mini split system in parking garage needs installed
Pressure Test10/18/201910/18/201910/18/2019PPART
DetailsJack Reynolds
Contact: Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy
- 60lb gas pressure test on 1st floor main area A&B
Pressure Test10/7/201910/7/201910/7/2019PPASS
DetailsJack Reynolds
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy
- 100lb main hydronic 1st and 2nd floor area A/B ok
Pressure Test9/18/20199/18/20199/18/2019PPASS
DetailsJack Reynolds
Contact: Robert Church ###-####.

Pressure test for 2nd and 3rd floor area B. Phone #: ###-#### Inspection requested via web by Brent Lacy
- 60lb gas pressure test on mains 2rd and 3th floor area A&B ok
Pressure Test8/12/20198/12/20198/12/2019PPASS
DetailsJack Reynolds
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy
- 20lb gas pressure test on 206,202 ,101,102,107 units ok
Pressure Test8/12/20198/12/20198/12/2019PPASS
DetailsJack Reynolds
3rd floor hydronics // Robert Phone #: ###-####
- 3rd floor 100lb hydronics main ok
Rough-in8/7/20198/8/20198/8/2019AFAIL
DetailsJack Reynolds
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy
- main supply line of hydronics on 3rd floor has a leak. crew is working on this reschedule
Pressure Test7/16/20197/16/20197/16/2019PFAIL
DetailsJack Reynolds
Contact: Craig Lacy ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy
-105, 204 area A hydronics pressure test fail
- 201,206,207,208 20lb gas pressure test ok area B
Pressure Test7/11/20197/11/20197/11/2019PFAIL
DetailsJack Reynolds
hydronics and gas test
- hydronics and gas test not ready still. Reschedule when when 100lb hydronics and 20lb gas tests are ready
Pressure Test7/10/20197/11/20197/11/2019ANR
DetailsJack Reynolds
hydronics and gas test
Pressure Test7/10/20197/10/20197/10/2019PNR
DetailsJack Reynolds
Contact: Craig Lacy ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy
- not ready talked with Gustavo and rescheduled with him tomorrow morning
Pressure Test6/28/20196/28/20196/28/2019PPASS
DetailsJack Reynolds
Contact: ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy
- Area B 3rd floor southside 3 units only 20lb gas pressure test ok
Pressure Test5/31/20195/31/20195/31/2019PPART
DetailsJack Reynolds
Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy
- Area A mec rooms 103,104,106,203,204,205
60lb gas pressure test ok
Pressure Test5/3/20195/3/20195/3/2019PPASS
DetailsJack Reynolds
one unit on the 1st floor NW middle pressure test and protective tape at penetration
one unit on 2nd floor NE corner pressure test
- 20lb gas pressure test on 1st and 2nd floor northbuilding 4 units on the 1st and 3 units on the 2nd
Pressure Test5/2/20195/3/20195/3/2019ANR
DetailsJack Reynolds
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy
- 4 units on the 1st floor north side had one unit that needed some work finished
- 3 units on 2nd floor north side had one unit that needed some work finished. rescheduled for this afternoon
Pressure Test4/22/20194/22/20194/22/2019PPART
DetailsJack Reynolds
Contact: Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy
- 3rd floor 20lb gas pressure test for gas line to bbq and kitchen on front building ok