Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberFIR19-00769
StatusFinaled
Name ALTA FIRE PROTECTION COMPANY
Site Address 1175 W LAKE HAZEL LN
Project NameOld Dominion Freight Line
Customer Number 
ePlanReviewYes
Description
Addition to existing dry pipe fire sprinkler system
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/7/20205/8/20205/8/2020APASS
DetailsTroy Cobbley
Permit finaled.

Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in5/4/20205/5/20205/5/2020PPASS
DetailsTroy Cobbley
The 24 hour air test was witnessed for both dry systems.

This Inspection will be to finish the 24-hour air test started on Monday afternoon. Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in5/1/20205/4/20205/4/2020PPART
DetailsTroy Cobbley
The overhead hydro 24 hour air test was started for both dry systems at 11:00am with 45psi on both guages.

This inspection will be to start the mandatory 24-Hour air test. Test to be completed Tuesday afternoon. Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in/Hydro5/1/20205/4/20205/4/2020APASS
DetailsTroy Cobbley
New overhead hydro test witnessed for both new dry pipe systems and header. Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
Telephone call  4/29/2020 DONE
sent email afpco@altafireprotection.com about $35
CHANGE STATUS TO (ISS)  4/29/2020 DONE
Plan assigned to (Stumbaugh)4/24/2020 4/28/2020 DONE
DetailsMark Stumbaugh
plan mod
Sprinkler Plan Check4/28/2020 4/28/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/28/2020 DONE
DetailsMark Stumbaugh
2hr review time
No new devices
Permit Ready to Issue  4/28/2020 DONE
PLAN MOD
Plan Modification Accepted  4/24/2020 DONE
Josh from Alta Fire requested a plan mod workflow opened
INSP-Sprinkler Rough-in/Hydro4/22/20204/23/20204/23/2020PPASS
DetailsTroy Cobbley
The rough-in passed for the piping mods. 200lb hydro test passed for the pipe mods.

Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
Plan assigned to (Stumbaugh)4/17/2020 4/20/2020 DONE
DetailsMark Stumbaugh
plan mod
Sprinkler Plan Check4/20/2020 4/20/2020 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  4/20/2020 DONE
DetailsMark Stumbaugh
2 hrs review time
no new devices
Permit Ready to Issue  4/20/2020 DONE
Plan Mod Accepted
CHANGE STATUS TO (ISS)  4/20/2020 DONE
Plan Modification Accepted  4/17/2020 DONE
Josh Hansen from Alta fire requested a plan mod workflow started
INSP-Final Inspection4/14/20204/16/20204/16/2020ACANC
DetailsTroy Cobbley
Not ready per contact. please contact Jim Lewis with any questions about this inspection he is on site ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Final Inspection4/14/20204/16/20204/16/2020ACANC
DetailsTroy Cobbley
Not ready per contact. please contact Jim Lewis with any questions about this inspection he is on site ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Final Inspection4/2/20204/9/20204/9/2020PFAIL
DetailsTroy Cobbley
Total trip time was 1:55, it can not exceed 60 seconds. Also need ceiling and pendant installed in the Data Room.

Please call Jim Lewis if you have any questions he is on site ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in4/8/20204/9/20204/9/2020APASS
DetailsTroy Cobbley
24 hour air test witnessed with no pressure loss.
Please give a Jim Lewis a call for inspection time. Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in/Hydro4/2/20204/8/20204/8/2020APART
DetailsJim Page
Hydrostatic test has been witnessed, no pressure loss was observed. 24 hour air test started at 11AM @ 45PSI.

Please call Jim Lewis if any questions on this inspection he is on site Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in4/8/20204/8/20204/8/2020APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work is complete, approved for cover, except for data room. City approved drawings show a ceiling in the data room, as of this entry there is no ceiling and according to the point of contact a ceiling is not going to be installed. If no ceiling is installed then data room must comply with the 2016 NFPA13, section 8.15.23 or install ceiling as shown on city approved drawings with pendant protection.
Plan resubmittals received  11/12/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check11/12/2019 11/12/2019 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  11/12/2019 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  11/12/2019 DONE
Issue and Print Permit  11/12/2019 DONE
Sprinkler Plan Check11/4/2019 11/8/2019 FAIL
DetailsMark Stumbaugh
Plan resubmittals received  11/4/2019 DONE
DetailsMark Stumbaugh
Sprinkler Plan Check10/21/2019 10/23/2019 FAIL
DetailsMark Stumbaugh
1st review completed  10/23/2019 FAIL
DetailsMark Stumbaugh
Intake Approval  10/21/2019 PASS
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)10/21/2019 10/21/2019 DONE
DetailsMark Stumbaugh
Intake Approval  10/17/2019 FAIL
DetailsMark Stumbaugh
Intake Approval  10/14/2019 FAIL
DetailsMark Stumbaugh
Application received  10/11/2019 DONE
Application submitted via PDS Online on Oct 11 2019 2:45PM