Information based on query as of Thursday, May 2, 2024.
Permit Information
Permit NumberFIR19-00769
StatusFinaled
Name ALTA FIRE PROTECTION COMPANY
Site Address 1175 W LAKE HAZEL LN
Project NameOld Dominion Freight Line
Customer Number 
ePlanReviewYes
Description
Addition to existing dry pipe fire sprinkler system
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/7/20205/8/20205/8/2020APASS
DetailsTroy Cobbley
Permit finaled.

Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in5/4/20205/5/20205/5/2020PPASS
DetailsTroy Cobbley
The 24 hour air test was witnessed for both dry systems.

This Inspection will be to finish the 24-hour air test started on Monday afternoon. Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in5/1/20205/4/20205/4/2020PPART
DetailsTroy Cobbley
The overhead hydro 24 hour air test was started for both dry systems at 11:00am with 45psi on both guages.

This inspection will be to start the mandatory 24-Hour air test. Test to be completed Tuesday afternoon. Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in/Hydro5/1/20205/4/20205/4/2020APASS
DetailsTroy Cobbley
New overhead hydro test witnessed for both new dry pipe systems and header. Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in/Hydro4/22/20204/23/20204/23/2020PPASS
DetailsTroy Cobbley
The rough-in passed for the piping mods. 200lb hydro test passed for the pipe mods.

Please give Jim Lewis a call to schedule the inspection time. ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Final Inspection4/14/20204/16/20204/16/2020ACANC
DetailsTroy Cobbley
Not ready per contact. please contact Jim Lewis with any questions about this inspection he is on site ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Final Inspection4/14/20204/16/20204/16/2020ACANC
DetailsTroy Cobbley
Not ready per contact. please contact Jim Lewis with any questions about this inspection he is on site ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Final Inspection4/2/20204/9/20204/9/2020PFAIL
DetailsTroy Cobbley
Total trip time was 1:55, it can not exceed 60 seconds. Also need ceiling and pendant installed in the Data Room.

Please call Jim Lewis if you have any questions he is on site ###-#### Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in4/8/20204/9/20204/9/2020APASS
DetailsTroy Cobbley
24 hour air test witnessed with no pressure loss.
Please give a Jim Lewis a call for inspection time. Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in/Hydro4/2/20204/8/20204/8/2020APART
DetailsJim Page
Hydrostatic test has been witnessed, no pressure loss was observed. 24 hour air test started at 11AM @ 45PSI.

Please call Jim Lewis if any questions on this inspection he is on site Phone #: ###-#### Inspection requested via web by Joshua Hansen
INSP-Sprinkler Rough-in4/8/20204/8/20204/8/2020APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in area of work is complete, approved for cover, except for data room. City approved drawings show a ceiling in the data room, as of this entry there is no ceiling and according to the point of contact a ceiling is not going to be installed. If no ceiling is installed then data room must comply with the 2016 NFPA13, section 8.15.23 or install ceiling as shown on city approved drawings with pendant protection.