Information based on query as of Friday, May 3, 2024.
Permit Information
Permit NumberBLD16-02806
StatusTemporary Occupancy
Name PRIMARY CONSTRUCTION INC
Site Address 8600 W OVERLAND RD
Project NameWendy's
Customer Number 
ePlanReviewYes
Description
(WENDY’S) //PLAN MOD FOR MECHANICAL, NEW MECHANICAL ENGINEER AND DESIGN, DEFERRED SUBMITTAL NEW HOOD SHEETS 2-8-18**AJS**Plan modification to remove pressurized sewer system and add a gravity sewer system, revise interior plumbing to accommodate new sewer system. 6-30-2017 JG// Permit to construct a new 2,478 sq., ft. assembly building and related site improvements. Scope of work includes: construction of a slab on grade concrete foundation, construction of stud framed exterior envelope walls, roof construction, construction of interior non-bearing walls to create a dining area, two ADA accessible restrooms, a commercial kitchen, a walk-in cooler, a freezer, a storage area and an office, installation of new windows and accessible doors, new electrical, new mechanical, new plumbing, site work, and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. The building is not fire sprinklered. Note: Special Inspections Required see form 310. **JG** KR Sewer Comment: Connection to public sewer is contigent upon acceptance of the new sewer main constructino in Bird St. Occupancy will not be issued for the building prior to the City acceptance of the sewer main in Bird St.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Other10/17/201910/21/201910/21/2019APEND
DetailsMike Jordan
Any thing left? Can permit be finaled? Appears that parking lot improvement to happen this spring. A grading permit is ready to be picked up.
BLD-Aging Inspection6/14/20196/14/20196/14/2019 PEND
DetailsMike Jordan
BLD-Aging Inspection4/5/20194/5/20194/5/2019 PEND
DetailsMike Jordan
Telephone call  7/24/2018 DONE
called Paul-he wants the permit finaled but it has parking lot issues so he asked to talk to Jason Blais
BLD-Aging Inspection7/10/20187/10/20187/11/2018 PEND
DetailsMike Jordan
Temporary Occupancy5/22/20188/20/20185/22/2018 DONE
DetailsCandy A. Nichols
as per Jason Blais ok to extend Temp C of O for 90 days from 5/13/18
Temporary Occupancy5/22/20188/20/20185/22/2018 DONE
DetailsCandy A. Nichols
as per Jason Blais-there is a bond so he can only nextend the temp c of o to that date 7/26/18
Telephone call  5/22/2018 DONE
sent email to Jim Taggard that we changed the expiration date on the temp c of o from 7/11 to 7/26 since there is a bond that expires on 7/26/18
Telephone call  5/18/2018 DONE
called Jim Taggart about the temp c of o expiring and he will email Jason Blais and request an extension until they figure out the parking lot issues
Telephone call  5/15/2018 DONE
called - talked to Dave - let him know the temp c of o is expired-he said i need to talk to Paul and he'll give him the message
BLD-Aging Inspection4/10/20184/10/20184/10/2018 PEND
DetailsMike Jordan
called contractor, waiting on sunshade to be installed, per contractor should be in the next few days, then will be able to get zoning signed off. Also need public works, contractor noted some parking lot modifications that were done and waiting approval.
Temporary Occupancy2/12/20185/13/20182/12/2018 DONE
DetailsTisha Gallop
Permanent occupancy pending approvals from Mechanical, Structural, Public Works, Zoning.
BLD-Final2/8/20182/9/20182/9/2018PPART
DetailsMike Jordan
Plumbing final should be signed in AM. Other finals complete for temporary CO. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm. Ok for temp occ. only.
Plan assigned to (JG)2/7/20182/7/20182/8/2018 PASS
DetailsJavier Guzman
Plan Mod Wendy's ePlan
Routing - MECHANICAL2/8/2018 2/8/2018 PASS
DetailsTroy James
Plan Mod, new mechanical engineered drawings.
Routing - PLAN CHECK2/8/2018 2/8/2018 PASS
DetailsAdele J Schaffeld-Griffin
mechanical changes approved, letter on engineer change up loaded into Tidemark, deferred submittal for new hood drawing sheets.
CHANGE STATUS TO (RDY)  2/8/2018 DONE
DO NOT REISSUE, plan mod fee due. Remove parcel tag when plan mod fee changed to issue status.
CHANGE STATUS TO (ISS)  2/8/2018 DONE
Plan Modification Accepted  2/7/2018 DONE
DetailsChristina Prado
Plan Mod to update HVAC drawings
Case Summary (BLD)  1/31/2018 DONE
DetailsAdele J Schaffeld-Griffin
Case Summary (BLD)  1/31/2018 DONE
DetailsAdele J Schaffeld-Griffin
FIRE-Final Inspection1/28/20181/29/20181/29/2018PPASS
DetailsTroy Cobbley
Life safety passed


Final reinspect. Items corrected per notes. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Final1/28/20181/29/20181/29/2018PCANC
DetailsMike Jordan
This inspection can not be completed until the issue with approved drawings/ design professional of record resolved. 1-29-18 Adele Griffin **Final inspection for temp CO. Outstanding items for plumbing are in process for resolution. Fire final 1/29 PM as well. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm
PubWorks Temp Occupancy Appr1/29/20181/29/20181/29/2018 DONE
DetailsTiffany Lowery
BLD-Final1/25/20181/26/20181/26/2018PCANC
DetailsMike Jordan
Trade finals in AM, temporary occupancy signoff Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
FIRE-Final Inspection1/25/20181/26/20181/26/2018AFAIL
DetailsTroy Cobbley
Provide address, provide permanant exit discharge lighting, mount the occupant load sign, provide testing of the duct smoke detectors.

Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
Zoning Approval Temp1/26/20181/26/20181/26/2018 PASS
DetailsKatelyn Menuge
Temporary Occupancy-Bond for Landscape and Sunshade BND18-00017
BLD-Ceiling Grid Inspection1/23/20181/24/20181/24/2018PPASS
DetailsMike Jordan
Ceiling grid inspection for cover. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Conference1/18/20181/19/20181/19/2018ACANC
DetailsMike Jordan
Need to meet and walk through some questions on site in preparation for building final next week. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD-Framing/Rough-in12/26/201712/26/201712/26/2017PPART
DetailsDave Hannah
Final shear for cover Phone #: ###-#### Inspection requested via web by Ryan Wilhelm shear ok
BLD-Wall cover12/12/201712/13/201712/13/2017APASS
DetailsMike Jordan
Interior framing for cover Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Energy code compliance12/12/201712/13/201712/13/2017APASS
DetailsMike Jordan
Insulation ; building envelope for cover Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Framing/Rough-in12/13/201712/13/201712/13/2017APASS
DetailsMike Jordan
Interior framing for cover Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Framing/Rough-in12/12/201712/13/201712/13/2017ACANC
DetailsMike Jordan
Finish shear for cover interior Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD-Framing/Rough-in12/6/201712/6/201712/6/2017PPASS
DetailsMike Jordan
Shear wall inspection Phone #: ###-#### Inspection requested via web by Ryan Wilhelm. Exterior shear only ok.
BLD-Other12/5/201712/5/201712/5/2017PPASS
DetailsMike Jordan
Roof cover inspection Phone #: ###-#### Inspection requested via web by Ryan Wilhelm. Ok to cover roof.
BLD-Conference12/4/201712/4/201712/4/2017APART
DetailsMike Jordan
Courtesy pre-inspection meeting for framing/structural. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm. Needs to complete the exterior and interior shear walls. Needs more screws and button punch metal deck. Complete install of all straps. Reinspection required prior to exterior cover.
BLD-Concrete11/3/201711/3/201711/3/2017PPASS
DetailsMike Jordan
Inspect for slab pour. Later preferred if possible. Phone #: ###-#### Inspection requested via web by Ryan Wilhelm
BLD-Concrete11/1/201711/1/201711/1/2017PCANC
DetailsMike Jordan
Slab vapor barrier/bar inspection Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD-Foundation10/25/201710/25/201710/25/2017APASS
DetailsBrandon Shaw
Stem wall
BLD-Foundation10/23/201710/23/201710/23/2017PCANC
DetailsMike Jordan
Stem wall & bar inspect for late PM pour. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD-Foundation10/20/201710/20/201710/20/2017PCANC
DetailsMike Jordan
Stem wall & bar inspection. Pour tentatively scheduled for 3pm, weather dependent. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
BLD-Footing10/17/201710/17/201710/17/2017PPASS
DetailsMike Jordan
perimeter footings ok.
BLD-Footing10/16/201710/17/201710/17/2017ANR
DetailsMike Jordan
Footing ; rebar inspection, concrete pour scheduled for 3pm Phone #: ###-#### Inspection requested via web by Ryan Wilhelm. rescheduled for pm inspection.
BLD-Footing10/15/201710/16/201710/16/2017PCANC
DetailsMike Jordan
Footing & bar inspection. Pour scheduled ~3:00pm. Phone #: ###-#### >> Inspection requested via web by Ryan Wilhelm Inspection cancelled from web by: Ryan Wilhelm
Telephone call  10/12/2017 DONE
talked to Todd with Aziva Enterprises-after talking to Tisha-parcel owner will need to send email or letter stating that Primary Const. will no longer be the GC and that Todd's company will be. He also has to sign it with his name and or something showing he is part of the LLC for Wendy's-the new GC will have to fill out both forms 302 & 306 and there will be a fee of $46.31
Issue PAID IN FULL permit  9/21/2017 DONE
Print Occupancy Form  9/21/2017 DONE
Extend Review Timeline  8/4/2017 DONE
Final Approved 180 day extension per Adele. See documents
Expiration Notice7/20/20178/10/20177/20/2017 DONE
DetailsBrittany Hill
OVERRIDE  7/19/2017  
Plan assigned to (JG)6/29/20176/29/20177/19/2017 PASS
DetailsJavier Guzman
1st rev comp, Plan mod Wendy's
Routing PW Drainage6/30/2017 7/19/2017 PASS
DetailsBrian Murphy
Permit Ready to Issue  7/19/2017 DONE
ALL MET need RP & rev cert of val for plan mod (resubmittal)
Routing PW Sewer Design6/30/2017 7/7/2017 PASS
DetailsKyle S. Rosenmeyer
Connection to public sewer is contigent upon acceptance of the new sewer main constructino in Bird St. Occupancy will not be issued for the building prior to the City acceptance of the sewer main in Bird St.
Routing - PLUMBING6/29/2017 7/3/2017 PASS
DetailsBill VanDegrift
1) vent all traps
2) vent required downstream of the grease interceptor
3) move ET-1 between check and WH-1
Routing - PLAN CHECK6/29/2017 7/1/2017 PASS
DetailsJavier Guzman
Routing - PUBLIC WORKS6/29/2017 6/30/2017 PASS
DetailsRachael Beierle
Plan Modification Accepted  6/29/2017 DONE
DetailsChristina Prado
Plan Mod requested to removed pressurized sewer system and add gravity sewer, revise interior plumbing to accomodate new sewer exiting
Extend Review Timeline  2/1/2017 DONE
1st Approved Extension per Adele. See documents
Telephone call  1/19/2017 DONE
Spoke with Russ informing him this permit is going to expire in 10 days and that the extension would give them another 180 days
Telephone call  1/17/2017 DONE
Returned call to Russ informing him how he can request an extension if the customer decided if they are not ready to pick the permit up
Expiration Notice1/10/20172/1/20171/10/2017 DONE
DetailsBrittany Hill
OVERRIDE  10/7/2016  
Plan assigned to (JG)8/5/20168/5/201610/7/2016 PASS
DetailsJavier Guzman
1st review completed, 9/01 L3 New Wendy's ePlan
Routing - MECHANICAL10/5/2016 10/7/2016 PASS
DetailsTroy James
PLANS/APPL TAKEN TO FRONT DESK  10/7/2016 DONE
Permit Ready to Issue  10/7/2016 DONE
****received ACHD, GC & rev cert of val ***NEED RP and rev cert of val for the plan mod
Routing - PLAN CHECK10/5/2016 10/5/2016 PASS
DetailsJavier Guzman
Routing - PLAN CHECK10/3/2016 10/4/2016 PASS
DetailsJavier Guzman
Routing - MECHANICAL10/3/2016 10/4/2016 FAIL
DetailsTroy James
Routing Off Site - STRUCTURAL10/3/2016 10/4/2016 PASS
DetailsJavier Guzman
signed off in ePlan by Jordan Terry of KPFF engineering
Routing Off Site - STRUCTURAL9/21/2016 9/29/2016 FAIL
DetailsJavier Guzman
Failed in ePlan by Jordan Terry of KPFF engineering
Routing PW Solid Waste9/22/2016 9/27/2016 PASS
DetailsPeter J. McCullough
signed off in ePlan by PW Solid Waste Peter McCullough
Routing PW Street Lights9/22/2016 9/27/2016 PASS
DetailsTom Marshall
signed off in ePlan by PW Street Lights Tom Marshall stating "no review required"
Routing - PLAN CHECK9/21/2016 9/27/2016 FAIL
DetailsJavier Guzman
Routing PW Sewer Rating9/26/2016 9/26/2016 PASS
DetailsRachael Beierle
Routing - FIRE9/21/20169/21/20169/23/2016 PASS
DetailsKatie Marron
Revised report attached to case.
Routing PW Environmental9/22/2016 9/23/2016 PASS
DetailsRick Christenson
Routing PW Sewer Design9/22/2016 9/23/2016 PASS
DetailsKyle S. Rosenmeyer
All comments addressed.
Routing PW Drainage9/22/2016 9/23/2016 PASS
DetailsBrian Murphy
signed off in ePlan by Brian Murphy of Public Works
Routing - PUBLIC WORKS9/21/2016 9/22/2016 PASS
DetailsRachael Beierle
Routing - MECHANICAL9/21/2016 9/22/2016 FAIL
DetailsTroy James
Route to Impact Fee Review8/31/20169/3/20169/1/2016 PASS
DetailsCindy M. Gould
1st review completed  8/31/2016 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK8/5/2016 8/31/2016 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL8/5/2016 8/30/2016 FAIL
DetailsJavier Guzman
Failed in ePlan by Jordan Terry of KPFF engineering
Routing - PLANNING Land Div8/5/2016 8/18/2016 PASS
DetailsTodd Tucker
Routing PW Environmental8/5/2016 8/18/2016 PASS
DetailsRick Christenson
1500 Gallon Exterior Interceptor.
Routing PW Drainage8/5/2016 8/11/2016 PASS
DetailsBrian Murphy
Routing - MECHANICAL8/5/2016 8/11/2016 FAIL
DetailsTroy James
talked to mechanical engineer about correction
Routing PW Street Lights8/5/2016 8/10/2016 PASS
DetailsTom Marshall
Routing PW Sewer Design8/5/2016 8/10/2016 FAIL
DetailsKyle S. Rosenmeyer
Label existing manhole: SW2105J.
Core drill manhole SW2105J and install 3" sewer service with kor-n-seal boot to ensure watertight connection. Pressure sewer discharge manholes must be coated in anti-corrosive liner approved by the City of Boise, multiple products are available. Re-channel manhole to accomodate service. Match crown of 3" sewer service to crown of 8" pipe out. Add note for Contractor: "Contractor shall contact Boise Public Works 48 hours prior to connecting sewer service to a public manhole; obtain tap permit and schedule inspection."
Routing - FIRE8/5/20168/5/20168/9/2016 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Routing PW Sewer Rating8/9/2016 8/9/2016 FAIL
DetailsRachael Beierle
NO SEWER SERVICE AVAILABLE AT THIS TIME. SEWER DESIGN WILL CONFIRM FUTURE SERVICE PROJECT LOCATION OR DETERMINE EASEMENTS REQUIRED.
Routing - PUBLIC WORKS8/5/2016 8/9/2016 FAIL
DetailsRachael Beierle
NO SEWER SERVICE AVAILABLE AT THIS TIME. SEWER DESIGN WILL CONFIRM FUTURE SERVICE PROJECT LOCATION OR DETERMINE EASEMENTS REQUIRED.
Routing - Erosion and Sediment8/5/2016 8/8/2016 PASS
DetailsAndy J. Long
ESC plan approved. Valid Plan Designer. Radix construction needs to designate a certified Responsible Person for the project.
Routing - PLUMBING8/5/2016 8/8/2016 PASS
DetailsDaryl Spivey
Install vents as required on grease floor drains and G/I per ISPC.
Routing - Design Review8/5/2016 8/8/2016 PASS
DetailsAndrea Tuning
Plan resubmittals received  8/8/2016 DONE
received copy of O&M agreement
Intake Approval  8/5/2016 PASS
DetailsTim L. Woodard
Routing - PLANNING8/5/2016 8/5/2016 PASS
DetailsTed Vanegas
Routing - Addressing8/5/2016 8/5/2016 PASS
DetailsLaura Hunter
Routing PW Solid Waste8/5/2016 8/5/2016 PASS
DetailsPeter J. McCullough
Intake Approval  8/4/2016 FAIL
Ross,

Please upload all of the Plan Sheets individually. Name them in accordance with their Plan Sheet number and title. Also, reupload the special inspections form as the last one has a blank page for it's cover sheet. We need the engineered stamped cover sheet (#510).

Best regards,

Tim
Application received  8/1/2016 DONE
Application submitted via PDS Online on Aug 1 2016 2:40PM
BLD-Aging Inspection8/7/20208/7/2020   
DetailsMike Jordan