First Notice | | 12/1/2018 | 11/29/2018 | | DONE |
|
|
|
This permit finaled on the web by Ami Ostrow
|
FIRE-Final Inspection | 11/20/2018 | 11/21/2018 | 11/21/2018 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
Jeff Phone #: ###-####
|
Permanent Occupancy | | | 11/21/2018 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PART |
Troy Cobbley
|
|
|
A temporarty for life safety is ok with Ron's permission until the project related fire alarm permit is addressed.
Please call Jeff Fahey Phone #: ###-#### Inspection requested via web by Ami Ostrow
|
BLD-Final | 11/15/2018 | 11/16/2018 | 11/16/2018 | A | PASS |
Mike Jordan
|
|
|
Please call Jeff Fahey Phone #: ###-#### Inspection requested via web by Ami Ostrow. building issues have been resolved. Ok for temp occ. as soon as fire/life/safety sings temp. Will be ok for perm. occ. when fire/life/safety sings perm.
|
Temporary Occupancy | 11/16/2018 | 2/14/2019 | 11/16/2018 | | DONE |
Christina Prado
|
|
|
|
BLD-Final | 11/14/2018 | 11/15/2018 | 11/15/2018 | P | NR |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Needs to provide directional signage at non ADA restroom showing location of ADA restrooms. Will be ok to final after life/safety and fire alarm finals and ADa sign posted at restroom.
|
FIRE-Final Inspection | 11/14/2018 | 11/15/2018 | 11/15/2018 | A | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm permit finaled, need thumbturn removed from main exit and sticker installed at main exit, need emergency lighting repaired.
Jeff Phone #: ###-####
|
FIRE-Final Inspection | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | CANC |
Troy Cobbley
|
|
|
Need the project related fire alarm permit addressed prior to a life safety inspection.
Jeff Phone #: ###-####
|
BLD-Final | 11/12/2018 | 11/13/2018 | 11/13/2018 | P | NR |
Mike Jordan
|
|
|
Please call Jeff Fahey. Phone #: ###-#### Inspection requested via web by Ami Tracy. Needs fire/life/safety final and fire alarm.
|
BLD-Ceiling Grid Inspection | 10/8/2018 | 10/9/2018 | 10/9/2018 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Ceiling grid at new reception area.
|
BLD-Framing/Rough-in | 9/14/2018 | 9/17/2018 | 9/17/2018 | A | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Interior steel stud framed walls for new reception area ok, pending electrical rough in inspection.
|
BLD-Ceiling Grid Inspection | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 8/16/2018 | 8/17/2018 | 8/17/2018 | A | PART |
Mike Jordan
|
|
|
Seth Phone #: ###-####. Needs to fireblock at top of walls.
|
CHANGE STATUS TO (ISS) | | | 7/23/2018 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 7/18/2018 | 7/18/2018 | 7/20/2018 | | PASS |
Carl Westfall
|
|
|
Plan mod - approved
|
Plan Reviewer's activity | | | 7/20/2018 | | PASS |
|
|
|
1st Plan Mod approved
|
Permit Ready to Issue | | | 7/20/2018 | | DONE |
|
|
|
All requirements met
DO NOT RE-ISSUE, change status to ISS after all fees paid in full
|
Routing - PLAN CHECK | 7/18/2018 | | 7/19/2018 | | PASS |
Carl Westfall
|
|
|
1st plan mod approved
|
Plan Modification Accepted | | | 7/18/2018 | | DONE |
|
|
|
Minor interior demo and wall reconfiguration and finish upgrades to the main level of the building (no basement work). No change in occupancy or building use, no exterior modifications.
|
BLD-Framing/Rough-in | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. North half ok, exculding shear wall.
|
BLD-Other | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Mike Jordan
|
|
|
fire caulking- Jeff Phone #: ###-####. South of stairway ok. Ok to cover.
|
BLD-Framing/Rough-in | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. South of stairwell ok to cover all sides.
|
BLD-Framing/Rough-in | 5/7/2018 | 5/8/2018 | 5/8/2018 | A | PART |
Mike Jordan
|
|
|
. Ok to one side south of stairwell. Needs to complete fireblocking.
|
BLD-Framing/Rough-in | 5/4/2018 | 5/7/2018 | 5/7/2018 | P | NH |
Mike Jordan
|
|
|
Jeff Phone #: ###-####
|
Issue PAID IN FULL permit | | | 3/7/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/7/2018 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 12/4/2017 | 12/4/2017 | 2/5/2018 | | PASS |
Carl Westfall
|
|
|
(1st done) (Dec 22 - 15 days) (19 sheets) St Als - Medical Clinic
|
Routing - PLAN CHECK | 2/3/2018 | | 2/5/2018 | | PASS |
Carl Westfall
|
|
|
Approved with referenced code sections and red lines.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/5/2018 | | DONE |
|
|
|
ALL MET
NEED
GC
Rev Cert of val
|
Plan resubmittals received | | | 2/3/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 1/17/2018 | 1/20/2018 | 1/18/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan resubmittals requested | | | 1/17/2018 | | DONE |
|
|
|
|
1st review completed | | | 1/17/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/4/2017 | | 1/17/2018 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required
|
Telephone call | | | 12/21/2017 | | DONE |
|
|
|
Talked to the Architect. Changes have been made. Expect revised drawings and a higher project cost when they resubmit. Decided to wait until after the 1st review is completed.
|
Routing - PLUMBING | 12/4/2017 | | 12/8/2017 | | PASS |
Bill VanDegrift
|
|
|
minor fixture relocation and new fixtures
per plans and ISPC
|
Routing - FIRE | 12/4/2017 | 12/4/2017 | 12/7/2017 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PUBLIC WORKS | 12/4/2017 | | 12/6/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - Erosion and Sediment | 12/4/2017 | | 12/5/2017 | | PASS |
Michael Zawacki
|
|
|
No ESCP needed, interior work.
|
Routing - Addressing | 12/4/2017 | | 12/5/2017 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 12/4/2017 | | 12/5/2017 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 12/4/2017 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Carl W accepted pre screen
|
Plan Reviewer's activity | | | 12/2/2017 | | PASS |
|
|
|
Plan intake review approved
|
Application received | | | 11/21/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 21 2017 12:46PM
|