Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD18-00803
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameB36 Cafeteria Expansion
Customer NumberC30616
ePlanReviewYes
Description
(MICRON CAFETERIA B36) **(Project Management-Ron Hill)** Tenant Improvement permit for the addition of 8,846 sq. ft. to an exisitng 33,549 sq. ft. building with work to include enclosure of the structure (structural frame and foundation under BLD18-00884), related HVAC, plumbing, electrical and interior finishes per the approved plans. This building is fully fire sprinklered for area increase. Any alterations to the sprinkler system will require a separate permit and shall comply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Occupancy Form  5/14/2019 DONE
Permanent Occupancy  5/14/2019 DONE
BLD-Final5/6/20195/7/20195/7/2019APASS
DetailsJim Storey
Kevin Phone #: ###-####
FIRE-Final Inspection5/2/20195/2/20195/2/2019PPASS
DetailsTroy Cobbley
Life safety passed.

Kevin Phone #: ###-#### Inspection requested via web by Kevin Antonucci
BLD-Final5/2/20195/2/20195/2/2019PNR
DetailsJim Storey
Kevin Phone #: ###-#### Inspection requested via web by Kevin Antonucci Number FIR18-00930
Status Fee Preparation
Name VIKING AUTOMATIC SPRINKLER CO
FIRE-Final Inspection4/26/20194/29/20194/29/2019AFAIL
DetailsTroy Cobbley
Need plans and small documents and the sprinkler permit finaled. Kevin Phone #: ###-####
BLD-Final4/26/20194/29/20194/29/2019ACANC
DetailsMike Jordan
Kevin Phone #: ###-####
BLD-Conference2/26/20192/26/20192/26/2019PPASS
DetailsJim Storey
insp record recored in wrong bld for tennent build out. all activities are ok for temp occ for bld18-01819. fire and bld. 301
BLD-Final2/23/20192/25/20192/25/2019PPART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Antonucci Phase 4 and Phase 5 complete. exit signage at double doors esat center/ check diangle 2/3 south pod exit sepyration.
FIRE-Final Inspection2/23/20192/25/20192/25/2019APART
DetailsJim Page
Life fire safety inspection for Phase 4 and Phase 5 complete for TCO

Phone #: ###-#### Inspection requested via web by Kevin Antonucci
BLD-Final1/17/20191/18/20191/18/2019PPART
DetailsJim Storey
Call Kevin when you arrive. Phone #: ###-#### Inspection requested via web by Kevin Antonucci survery area ok to occupy.
FIRE-Final Inspection1/17/20191/18/20191/18/2019PPART
DetailsTroy Cobbley
life safety for Servery Area, Phase 3 is passed. Kevin is going to finish mounting the two fire extinguishers. Exit signs and emergency lights tested.

Call Kevin when you arrive. Phone #: ###-#### Inspection requested via web by Kevin Antonucci
BLD-Ceiling Grid Inspection1/11/20191/11/20191/11/2019PPASS
DetailsJim Storey
ceilling ok to flood/ tile change will need smoke and flame spread upon reinstal.
BLD-Wall cover12/28/201812/28/201812/28/2018APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Antonucci phase 3 ok
BLD-Framing/Rough-in12/18/201812/18/201812/18/2018PPASS
DetailsMike Jordan
Interior steel stud framed walls ok.
FIRE-Final Inspection11/21/201811/21/201811/21/2018PPART
DetailsJim Page
Temporary audio visual notification for phase 2 on fire alarms is adequate for TCO, each phase will require fire alarm testing in the future. Fire sprinklers complete for phase 2, fire alarms are operation in phase 2 area, fire extinguishers for phase 2 are placed with current inspection tags. Final life fire safety inspection for phase 2 TCO complete.
FIRE-Final Inspection11/16/201811/19/201811/19/2018PFAIL
DetailsJim Page
No fire alarm inspection or testings has been completed for area of work, an inspection for FIR18-00740 needs to be scheduled and passed before life fire safety inspection can be completed.

Kevin Phone #: ###-####
BLD-Ceiling Grid Inspection11/15/201811/16/201811/16/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-####
BLD-Framing/Rough-in10/29/201810/29/201810/29/2018PPASS
DetailsJim Storey
Kevin Phone #: ###-####
BLD-Footing9/20/20189/21/20189/21/2018APASS
DetailsJim Storey
Kevin Phone #: ###-#### 2 of three ok pending si for all ft/ compaction
BLD-Framing/Rough-in9/12/20189/13/20189/13/2018APASS
DetailsDave Hannah
Kevin Phone #: ###-#### cooler walls and office walls in kitchen ok
BLD-Framing/Rough-in9/12/20189/12/20189/12/2018PDEFR
DetailsJim Storey
entry by mistake on computer made ok for thursday.
BLD-Framing/Rough-in9/12/20189/13/20189/12/2018APASS
DetailsJim Storey
Kevin Phone #: ###-####
Print Occupancy Form  7/11/2018 DONE
BLD-Framing/Rough-in7/9/20187/9/20187/9/2018APASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt n and south calf walls ok
Fees Due Hold5/26/2018 6/18/2018 DONE
DetailsChristina Prado
Fees Due Hold5/25/2018 5/25/2018 DONE
DetailsTisha Gallop
Issue & PRINT to be Invoiced  5/24/2018 DONE
DetailsChristina Prado
Print Occupancy Form  5/24/2018 DONE
Permit Ready to Issue  5/21/2018 DONE
Need:
Revised certificate of Value
Routing - PUBLIC WORKS3/23/2018 5/21/2018 PASS
DetailsRachael Beierle
Plan assigned to (CDM)3/23/20183/23/20185/19/2018 PASS
DetailsCarl D Madsen
Micron Cafeteria expansion New
Routing - PLAN CHECK5/17/2018 5/19/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  5/19/2018 DONE
Route to Impact Fee Review4/20/20184/23/20184/23/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  4/20/2018 DONE
Routing - PLAN CHECK3/23/2018 4/20/2018 FAIL
DetailsCarl D Madsen
Routing - FIRE3/23/20183/23/20184/16/2018 PASS
DetailsErika Akin
Attached comments to case
Routing - Erosion and Sediment3/23/2018 3/28/2018 PASS
DetailsAndy J. Long
No new ESC permit for this project. Reference active permit ESC18-00006
Routing PW Street Lights3/26/2018 3/27/2018 PASS
DetailsTom Marshall
Routing - MECHANICAL3/23/2018 3/27/2018 PASS
DetailsTroy James
Routing - PLANNING3/23/2018 3/27/2018 PASS
DetailsDavid Moser
See DRH
Routing - Design Review3/23/2018 3/26/2018 PASS
DetailsSarah Schafer
Routing PW Sewer Design3/26/2018 3/26/2018 PASS
DetailsDeAnn Brown
No sewer work in plan.
Routing PW Solid Waste3/26/2018 3/26/2018 PASS
DetailsEvan Carpenter
Routing PW Environmental3/26/2018 3/26/2018 PASS
DetailsTerry Alber
No issues. No added fixtures, just additional cafeteria seating.
Routing PW Drainage3/26/2018 3/26/2018 PASS
DetailsBrian Murphy
MASTER PLAN MICRON
Routing - Addressing3/23/2018 3/23/2018 PASS
DetailsDoug Chausow
Intake Approval  3/23/2018 PASS
Intake Approval  3/14/2018 FAIL
DetailsJavier Guzman
Please provide and upload the following:
• A site specific fire flow at hydrants letter from United Water or other public water provider, to Include static pressure if sprinklers are to be installed was not uploaded.
• Planning & Zoning letter(s) of approval were not uploaded
• Checklist stated the ESC plans were in the small documents file but none were uploaded. ESC plans must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
Application received  3/7/2018 DONE
Application submitted via PDS Online on Mar 7 2018 5:58PM