Print Occupancy Form | | | 5/14/2019 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/14/2019 | | DONE |
|
|
|
|
BLD-Final | 5/6/2019 | 5/7/2019 | 5/7/2019 | A | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-####
|
FIRE-Final Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Kevin Phone #: ###-#### Inspection requested via web by Kevin Antonucci
|
BLD-Final | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | NR |
Jim Storey
|
|
|
Kevin Phone #: ###-#### Inspection requested via web by Kevin Antonucci Number FIR18-00930 Status Fee Preparation Name VIKING AUTOMATIC SPRINKLER CO
|
FIRE-Final Inspection | 4/26/2019 | 4/29/2019 | 4/29/2019 | A | FAIL |
Troy Cobbley
|
|
|
Need plans and small documents and the sprinkler permit finaled. Kevin Phone #: ###-####
|
BLD-Final | 4/26/2019 | 4/29/2019 | 4/29/2019 | A | CANC |
Mike Jordan
|
|
|
Kevin Phone #: ###-####
|
BLD-Conference | 2/26/2019 | 2/26/2019 | 2/26/2019 | P | PASS |
Jim Storey
|
|
|
insp record recored in wrong bld for tennent build out. all activities are ok for temp occ for bld18-01819. fire and bld. 301
|
BLD-Final | 2/23/2019 | 2/25/2019 | 2/25/2019 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Antonucci Phase 4 and Phase 5 complete. exit signage at double doors esat center/ check diangle 2/3 south pod exit sepyration.
|
FIRE-Final Inspection | 2/23/2019 | 2/25/2019 | 2/25/2019 | A | PART |
Jim Page
|
|
|
Life fire safety inspection for Phase 4 and Phase 5 complete for TCO
Phone #: ###-#### Inspection requested via web by Kevin Antonucci
|
BLD-Final | 1/17/2019 | 1/18/2019 | 1/18/2019 | P | PART |
Jim Storey
|
|
|
Call Kevin when you arrive. Phone #: ###-#### Inspection requested via web by Kevin Antonucci survery area ok to occupy.
|
FIRE-Final Inspection | 1/17/2019 | 1/18/2019 | 1/18/2019 | P | PART |
Troy Cobbley
|
|
|
life safety for Servery Area, Phase 3 is passed. Kevin is going to finish mounting the two fire extinguishers. Exit signs and emergency lights tested.
Call Kevin when you arrive. Phone #: ###-#### Inspection requested via web by Kevin Antonucci
|
BLD-Ceiling Grid Inspection | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Jim Storey
|
|
|
ceilling ok to flood/ tile change will need smoke and flame spread upon reinstal.
|
BLD-Wall cover | 12/28/2018 | 12/28/2018 | 12/28/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Antonucci phase 3 ok
|
BLD-Framing/Rough-in | 12/18/2018 | 12/18/2018 | 12/18/2018 | P | PASS |
Mike Jordan
|
|
|
Interior steel stud framed walls ok.
|
FIRE-Final Inspection | 11/21/2018 | 11/21/2018 | 11/21/2018 | P | PART |
Jim Page
|
|
|
Temporary audio visual notification for phase 2 on fire alarms is adequate for TCO, each phase will require fire alarm testing in the future. Fire sprinklers complete for phase 2, fire alarms are operation in phase 2 area, fire extinguishers for phase 2 are placed with current inspection tags. Final life fire safety inspection for phase 2 TCO complete.
|
FIRE-Final Inspection | 11/16/2018 | 11/19/2018 | 11/19/2018 | P | FAIL |
Jim Page
|
|
|
No fire alarm inspection or testings has been completed for area of work, an inspection for FIR18-00740 needs to be scheduled and passed before life fire safety inspection can be completed.
Kevin Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/15/2018 | 11/16/2018 | 11/16/2018 | P | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-####
|
BLD-Framing/Rough-in | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-####
|
BLD-Footing | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-#### 2 of three ok pending si for all ft/ compaction
|
BLD-Framing/Rough-in | 9/12/2018 | 9/13/2018 | 9/13/2018 | A | PASS |
Dave Hannah
|
|
|
Kevin Phone #: ###-#### cooler walls and office walls in kitchen ok
|
BLD-Framing/Rough-in | 9/12/2018 | 9/12/2018 | 9/12/2018 | P | DEFR |
Jim Storey
|
|
|
entry by mistake on computer made ok for thursday.
|
BLD-Framing/Rough-in | 9/12/2018 | 9/13/2018 | 9/12/2018 | A | PASS |
Jim Storey
|
|
|
Kevin Phone #: ###-####
|
Print Occupancy Form | | | 7/11/2018 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 7/9/2018 | 7/9/2018 | 7/9/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Honeycutt n and south calf walls ok
|
Fees Due Hold | 5/26/2018 | | 6/18/2018 | | DONE |
Christina Prado
|
|
|
|
Fees Due Hold | 5/25/2018 | | 5/25/2018 | | DONE |
Tisha Gallop
|
|
|
|
Issue & PRINT to be Invoiced | | | 5/24/2018 | | DONE |
Christina Prado
|
|
|
|
Print Occupancy Form | | | 5/24/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/21/2018 | | DONE |
|
|
|
Need:
Revised certificate of Value
|
Routing - PUBLIC WORKS | 3/23/2018 | | 5/21/2018 | | PASS |
Rachael Beierle
|
|
|
|
Plan assigned to (CDM) | 3/23/2018 | 3/23/2018 | 5/19/2018 | | PASS |
Carl D Madsen
|
|
|
Micron Cafeteria expansion New
|
Routing - PLAN CHECK | 5/17/2018 | | 5/19/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/19/2018 | | DONE |
|
|
|
|
Route to Impact Fee Review | 4/20/2018 | 4/23/2018 | 4/23/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 4/20/2018 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/23/2018 | | 4/20/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 3/23/2018 | 3/23/2018 | 4/16/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - Erosion and Sediment | 3/23/2018 | | 3/28/2018 | | PASS |
Andy J. Long
|
|
|
No new ESC permit for this project. Reference active permit ESC18-00006
|
Routing PW Street Lights | 3/26/2018 | | 3/27/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing - MECHANICAL | 3/23/2018 | | 3/27/2018 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 3/23/2018 | | 3/27/2018 | | PASS |
David Moser
|
|
|
See DRH
|
Routing - Design Review | 3/23/2018 | | 3/26/2018 | | PASS |
Sarah Schafer
|
|
|
|
Routing PW Sewer Design | 3/26/2018 | | 3/26/2018 | | PASS |
DeAnn Brown
|
|
|
No sewer work in plan.
|
Routing PW Solid Waste | 3/26/2018 | | 3/26/2018 | | PASS |
Evan Carpenter
|
|
|
|
Routing PW Environmental | 3/26/2018 | | 3/26/2018 | | PASS |
Terry Alber
|
|
|
No issues. No added fixtures, just additional cafeteria seating.
|
Routing PW Drainage | 3/26/2018 | | 3/26/2018 | | PASS |
Brian Murphy
|
|
|
MASTER PLAN MICRON
|
Routing - Addressing | 3/23/2018 | | 3/23/2018 | | PASS |
Doug Chausow
|
|
|
|
Intake Approval | | | 3/23/2018 | | PASS |
|
|
|
|
Intake Approval | | | 3/14/2018 | | FAIL |
Javier Guzman
|
|
|
Please provide and upload the following:
• A site specific fire flow at hydrants letter from United Water or other public water provider, to Include static pressure if sprinklers are to be installed was not uploaded.
• Planning & Zoning letter(s) of approval were not uploaded
• Checklist stated the ESC plans were in the small documents file but none were uploaded. ESC plans must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City.
|
Application received | | | 3/7/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Mar 7 2018 5:58PM
|