Permit Information
Permit NumberBLD18-00887
StatusFinaled
Name SCOTT HEDRICK CONSTRUCTION
Site Address 707 W FORT ST
Project NameImmanuel Lutheran Church
Customer Number 
ePlanReviewYes
Description
(IMMANUEL LUTHERAN CHURCH) //09/26/18 PLAN MODIFICATION TO USE SPACE BETWEEN BASEMENT CORRIDOR CEILING AND FLOOR ABOVE AS RETURN AIR PLENUM. JAR// Permit for a tenant improvement to an existing church. Work to include: upgrades to the east wall of the church to a 2-hour fire barrier per approved code alternate; interior upgrade with HVAC system and related structural work; new doors and hardware for code compliance; accessible restrooms in the basement; interior non-bearing partitions; kitchen cabinets and equipment; sanctuary ceiling; lighting; new finishes in compliance with Ch. 8 of the 2015 IBC. A code alternate has been approved to address fire separation issues on the east side of the building. This building will be fully sprinklered with an NFPA 13 system installed throughout the building for area increase as Type VB construction. The Fire Sprinkler and Fire Alarm systems WILL REQUIRE SEPARATE PERMITS and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JAR**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  4/19/2019 DONE
First Notice 3/17/20194/15/2019 DONE
mailed 4-16-19
BLD-Final3/7/20193/7/20193/7/2019PPASS
DetailsTony Young
Permanent Occupancy  3/7/2019 DONE
BLD-Final3/1/20193/5/20193/5/2019APEND
DetailsTony Young
Request for bldg final for CO...
(pending final zoning sign off for old house on the property awaiting paint weather),
after fire final as scheduled as well.
Best access usually in alley. Thank you. Phone #: ###-#### Inspection requested via web by Gary Band//415 scheduled
BLD-Final2/28/20193/1/20193/1/2019APART
DetailsTony Young
Request for bldg final for TCO...
(pending final zoning sign off for old house on the property awaiting paint weather),
after fire final as scheduled as well.
Best access usually in alley. Thank you. Phone #: ###-#### Inspection requested via web by Gary Band,, ok for full occupancy pending others,, zoning
FIRE-Final Inspection2/28/20193/1/20193/1/2019APASS
DetailsJim Page
Final life fire safety inspection complete.

Request for Fire, life, Safety in conjunction with final sprinkler, alarm test, as scheduled by Larson Fire, Webster Alarm .
Best access usually in alley. Thank you. Phone #: ###-#### Inspection requested via web by Gary Band
BLD-Final2/12/20192/12/20192/12/2019ANR
DetailsTony Young
Missing exit lights installed per plan / request. F/L/S, re-inspection request, for final. TCO
best access off alley. Thank you Phone #: ###-#### Inspection requested via web by Gary Band// needs fire 1st,, no inspection
FIRE-Final Inspection2/12/20192/12/20192/12/2019AFAIL
DetailsJim Page
No follow up inspection has been requested by the fire sprinkler contractor in regards to backflow/flow switch issue on the fire sprinkler system, FIR permits for the fire sprinkler system needs to be inspected and passed before life fire safety inspection. Life fire safety inspection will not be completed until FIR permits associated with this project are inspected, passed and the permits are finaled.

Missing exit lights installed per plan / request. F/L/S, re-inspection request, for final.
best access off alley. Thank you Phone #: ###-#### Inspection requested via web by Gary Band
BLD-Final2/1/20192/4/20192/4/2019PCANC
DetailsTony Young
Mechanical set for re-inspection 2-4-19 a.m.
Request for p.m. TCO Phone #: ###-#### >> Inspection requested via web by Gary Band Inspection cancelled from web by: Gary Band
FIRE-Final Inspection1/31/20192/1/20192/1/2019AFAIL
DetailsJim Page
Exit signs have not been installed as discussed, provide exit signage as shown on city approved drawings.

request for final / TCO on Immanuel Lutheran Church.
Best access is usually off the alley.
Thank you. Phone #: ###-#### Inspection requested via web by Gary Band
BLD-Final1/31/20192/1/20192/1/2019ACANC
DetailsJim Storey
Request for final / TCO on Immanuel Lutheran Church.
Best access is usually off the alley.
Thank you. Phone #: ###-#### Inspection requested via web by Gary Band need mech aproval. need bo aprovals to concure with fd
BLD-Final1/22/20191/23/20191/23/2019PCANC
DetailsJim Sly
please perform F,L,S / final for temp occ Phone #: ###-#### Inspection requested via web by Gary Band
Need to final.....815 N 7th....1st
BLD-Final1/22/20191/22/20191/22/2019PFAIL
DetailsDave Hannah
Requesting Final inspection for occupancy.
Best access usually off the alley. Thank you.
Gary 208- 996- 9276 Phone #: ###-#### Inspection requested via web by Gary Band needs to add exit signs change door hardwear fix ada restrooms
FIRE-Final Inspection1/22/20191/22/20191/22/2019AFAIL
DetailsJim Page
Fire alarm inspection failed, FIR permits for fire sprinkler and fire alarm needs to be finaled before life fire safety can be completed. Provide exit discharge emergency lighting as discussed.

requesting Fire, life, Safety Inspection in conjunction with Alarm testing as scheduled separately by Webster Fire Protection, ; sprinkler inspection by Larson Fire Sprinkler. Best access usually off the alley. Thank you.
Gary 208- 996- 9276 Phone #: ###-#### Inspection requested via web by Gary Band
BLD-Final1/17/20191/18/20191/18/2019PCANC
DetailsDave Hannah
Pending F/L/S inspection scheduled for a.m.
Best access off alley. Thank you. Phone #: ###-#### Inspection requested via web by Gary Band
FIRE-Final Inspection1/17/20191/18/20191/18/2019ACANC
DetailsJim Page
FIR permits for fire sprinkler and fire alarm need to be finaled before life fire safety can be completed. Thjis request is cancelled.

If possible please call to let me know what time we could do the Fire, Life, Safety Inspection, so I can have the respective guys on site to test alarm ; duct detectors. Best access off alley. Thank you. Phone #: ###-#### Inspection requested via web by Gary Band
BLD-Ceiling Grid Inspection12/4/201812/4/201812/4/2018PPASS
DetailsTony Young
request for ceiling grid inspection @ basement Fellowship room.

Best access from alley down rear stairs to basement. Thank you. Phone #: ###-#### Inspection requested via web by Gary Band// ok pending trades
BLD-Framing/Rough-in11/8/201811/8/201811/8/2018PPASS
DetailsTony Young
Request is for framing Inspection of basement corridor ceiling, as well as re-work framing of East wall of church, ( library, Thomas Chapel, ; nursery) where windows have been removed.
Best access from alley between 7th ; 8th. Thank you. Phone #: ###-#### Inspection requested via web by Gary Band
BLD-Framing/Rough-in10/26/201810/26/201810/26/2018APASS
DetailsTony Young
Best access from alley, near elect service panels. Insp request is only for last where wood framing closes up old doorway area @ East wall.
Thank you. Phone #: ###-#### Inspection requested via web by Gary Band,, ok after fire blocking
BLD-Wall cover10/16/201810/16/201810/16/2018APASS
DetailsTony Young
request for re-inspect, to see insulation fireblock in basement.
Alley ; rear stairs to basement best access. Preferred time between 9:30 ; 11:30 if possible. Thank you Phone #: ###-#### Inspection requested via web by Gary Band
BLD-Wall cover10/15/201810/15/201810/15/2018PCANC
DetailsTony Young
request for re-inspect per inspectors desire to see insulation for fire-blocking above ceiling between conference room & rest rooms.
Preferred time would be 1:00 to 2:00 pm if possible. Thank you. Phone #: ###-#### >> Inspection requested via web by Gary Band Inspection cancelled from web by: Gary Band
BLD-Framing/Rough-in10/12/201810/12/201810/12/2018APART
DetailsTony Young
best access in alley between 7th ; 8th. Rear stairs to basement. MEP ; Fire signed off. Looking for framing Insp @ Basement ; Sanctuary above.
If possible, before 11:30 am would be helpful. Thank you. Gary Phone #: ###-#### Inspection requested via web by Gary Band,, ok pending trades,, fire block ceiling line of wood wall
BLD-Wall cover10/12/201810/12/201810/12/2018APART
DetailsTony Young
best access off alley between 7th ; 8th. Rear stairs to basement.
MEP ; Fire signed off. Looking for cover inspection. As this is an interior remodel,there are no ext walls requiring insulation, for an insulation inspection. Framing inspection has been requested, so hoping to get this performed with the framing Insp. Thank you. Phone #: ###-#### Inspection requested via web by Gary Band,, ok pending trades,, need to see fireblocking of wood wall ceiling line
BLD-Framing/Rough-in10/8/201810/8/201810/8/2018PPART
DetailsBrandon Shaw
Ok to cover exterior walls and exterior sides of ceiling "clouds", Fire sprinkler rough in needs to be inspected...
Plan assigned to (JAR)9/17/20189/17/20189/26/2018 DONE
DetailsJulie Romig
09/24 - Plan Mod Immanuel Lutheran Church
Routing - PLAN CHECK9/18/2018 9/26/2018 PASS
DetailsJulie Romig
Plan Mod
Permit Ready to Issue  9/26/2018 DONE
Plan Mod Approved
DO NOT REISSUE (plan mod fees due)
CHANGE STATUS TO (ISS)  9/26/2018 DONE
Print Occupancy Form  9/26/2018 DONE
Routing - MECHANICAL9/18/2018 9/25/2018 PASS
DetailsTroy James
Plan Mod
Revised ceiling above hallway to be return plenum.
Plan Modification Accepted  9/17/2018 DONE
Use runner cieling as return air plenum at basement corridor
BLD-Framing/Rough-in9/4/20189/4/20189/4/2018PPART
DetailsTony Young
This request is merely for the new HVAC platform at the rear of the building on the alley, to hopefully allow us the ability to place some sheeting for deck etc. Phone #: ###-#### Inspection requested via web by Gary Band,, ok after minor fixes
BLD-Footing8/23/20188/23/20188/23/2018APASS
DetailsDave Hannah
Prefer Inspection between 8:00 am ;10:00 am, please
Pour scheduled for 10;30 am
easy entry thru rear, off alley, to basement area, via steps at rear of bldg.
Thank you! Phone #: ###-#### Inspection requested via web by Gary Band
BLD-Footing8/13/20188/14/20188/14/2018AFAIL
DetailsDave Hannah
Inspection for new footings in basement of existing Church building @ 707 W Fort St. Preferred Inspection time is 10:30 a.m. w/ pour scheduled for 12:00 noon. Phone #: ###-#### Inspection requested via web by Gary Band needs city aprov plans on site and strut. data
Print Occupancy Form  8/3/2018 DONE
Issue PAID IN FULL permit  8/3/2018 DONE
Plan assigned to (JAR)3/20/20183/20/20188/1/2018 DONE
DetailsJulie Romig
1st Rev Comp - 4th Rev Comp - L3 Immanual Lutheran Church
Routing - PLAN CHECK7/24/2018 8/1/2018 PASS
DetailsJulie Romig
5th Review to finalize Code Alternate.
Routing - Design Review8/1/2018 8/1/2018 PASS
DetailsKayCee Babb
per DRH18-00063. Infill shall match pattern of existing window layout, with trim layered over the fiber cement board to mimic detailing. Colors shall match existing.
PLANS/APPL TAKEN TO FRONT DESK  8/1/2018 DONE
Permit Ready to Issue  8/1/2018 DONE
NEED
GC FORM
REVISED VALUE
Routing - PLAN CHECK7/13/2018 7/18/2018 FAIL
DetailsJulie Romig
4th Review - Working on Code Alternate for existing code deficincies
Routing - PLAN CHECK6/22/2018 7/3/2018 FAIL
DetailsJulie Romig
3rd Review - All items passed except Upgrade Agreement/Code Alternate to address existing code deficiencies, which is in progress.
Routing - MECHANICAL6/22/2018 6/25/2018 PASS
DetailsTroy James
Routing - PLAN CHECK6/7/2018 6/18/2018 FAIL
DetailsJulie Romig
2nd Review
Routing - FIRE6/7/20186/7/20186/13/2018 PASS
DetailsErika Akin
Attached revised comments to case. Fire sprinklers added
Routing Off Site - STRUCTURAL6/7/2018 6/8/2018 PASS
DetailsJulie Romig
Routing - MECHANICAL6/7/2018 6/8/2018 FAIL
DetailsTroy James
Route to Impact Fee Review4/26/20184/29/20184/27/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
1st review completed  4/26/2018 FAIL
DetailsJulie Romig
Routing - PLAN CHECK3/20/2018 4/26/2018 FAIL
DetailsJulie Romig
1st Review - Report emailed to architect.
Routing - FIRE3/20/20183/20/20184/10/2018 PASS
DetailsScott Arellano
Attached comments to case
Routing Off Site - STRUCTURAL3/20/2018 4/3/2018 FAIL
DetailsJulie Romig
Routing - MECHANICAL3/20/2018 3/26/2018 FAIL
DetailsTroy James
Need gas pipe sizing design on plans. Talked to mechanical engineer.
Routing - PUBLIC WORKS3/20/2018 3/22/2018 PASS
DetailsRachael Beierle
Routing - PLUMBING3/20/2018 3/21/2018 PASS
DetailsBill VanDegrift
See redline remarks and install per ISPC.
Routing - PLANNING3/20/2018 3/21/2018 PASS
DetailsDavid Moser
See DRH18-00063
Routing - Addressing3/20/2018 3/20/2018 PASS
DetailsDoug Chausow
Routing - Design Review3/20/2018 3/20/2018 PASS
DetailsKayCee Babb
Routing - Erosion and Sediment3/20/2018 3/20/2018 PASS
DetailsMichael Zawacki
Interior work only. No ESC permit needed
Intake Approval  3/20/2018 PASS
Plan Reviewer's activity  3/15/2018 PASS
DetailsCarl Westfall
Plan intake review approved
Application received  3/13/2018 DONE
Application submitted via PDS Online on Mar 13 2018 4:33PM