Permit Information
Permit NumberBLD18-02281
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 8853 W FAIRVIEW AVE
Project NameLithia Ford of Boise
Customer Number 
ePlanReviewYes
Description
(LITHIA FORD OF BOISE) Permit for the construction of a 1,536 sq. ft. addition to an existing 83,449 sq. ft. building with work to include general site work and the construction of the new building housing three vehicle service bays. Minor work will also occur in the existing building including a new high/low drinking fountain along with misc. wall door and related interior finishes per the approved plans. This building is fully fire sprinklered for area increase. Any alterations to the sprinkler system will requrire a separate permit and shall commply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  11/21/2019 DONE
First Notice 9/28/201910/29/2019 DONE
mailed 11-1
Permanent Occupancy  9/18/2019 DONE
BLD-Final9/16/20199/17/20199/17/2019PPASS
DetailsMike Jordan
Call ahead // David Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection9/16/20199/17/20199/17/2019APASS
DetailsMike Jordan
Call ahead // David Phone #: ###-####. All issues have been reolved.
Telephone call  9/17/2019 DONE
received a call-they left a message so i called them back-they just said they had questions about the C of O-so i called them back and left a message-told them if they want the C of O they need to come in or email permits@cityofboise.org
Telephone call  9/12/2019 DONE
called Paola to let know the temp c of o is epired. She will email Jason Blais to requet an extension
FIRE-Final Inspection7/22/20197/23/20197/24/2019AFAIL
DetailsTroy Cobbley
Provide single action hardware on the two store front doors as discussed. Fire alarm has been addressed.

Mark Phone #: ###-####
BLD-Final7/22/20197/23/20197/23/2019PNR
DetailsMike Jordan
Mark Phone #: ###-####. Issues with door hardware. Waiting for plan review. Will need to reschedule.
Temporary Occupancy7/12/201910/10/20197/12/2019 DONE
DetailsCandy A. Nichols
Jason Blais ok'd extension for 60 days on the temp c of o
Telephone call  7/10/2019 DONE
called Paiula to let know temp c of o is expired-gave her Jason's email to request an extension
FIRE-Final Inspection6/17/20196/17/20196/17/2019PFAIL
DetailsTroy Cobbley
Provide fire alarm modifications for the required manual pull station at the new door, provide single action hardware on the two new store front doors as discussed.

Mark Phone #: ###-####
BLD-Final6/17/20196/18/20196/17/2019ACANC
DetailsMike Jordan
Mark Phone #: ###-####
CHANGE STATUS TO (ISS)  6/7/2019  
plan mod
OVERRIDE  5/24/2019  
OVERRIDE  5/24/2019  
Plan assigned to (CDM)5/9/20195/9/20195/24/2019 PASS
DetailsCarl D Madsen
PLAN MOD
Permit Ready to Issue  5/24/2019 DONE
met- plan mod
Routing - MECHANICAL5/20/2019 5/23/2019 PASS
DetailsTroy James
Routing - FIRE5/20/20195/20/20195/22/2019 PASS
DetailsErika Akin
Hydrant placement altered b/c utility easement. New location shown on revised plan sheet C5.0.
Routing - PLAN CHECK5/20/2019 5/22/2019 PASS
DetailsCarl D Madsen
Routing - PUBLIC WORKS5/20/2019 5/20/2019 PASS
DetailsMorgan Webb
Temporary Occupancy5/10/20198/8/20195/10/2019 DONE
DetailsCandy A. Nichols
as per Jason Blais-temp c of o extension good for 60 days from 5/9/19
Plan Modification Accepted  5/9/2019  
DetailsCarl D Madsen
Plan mod- changes fire hydrant per fire inspector- sheet numbers C50, A1.3 A2.1 A6.1, A10.1, A10.2, E2.1 , P2.2 & M2.1
Telephone call  5/7/2019 DONE
called Paoula to let know temp c of o will expire on the 9th of May. She will find out if they need a final or an extension
Temporary Occupancy2/8/20195/9/20192/8/2019 DONE
DetailsBrittany Hill
Print Occupancy Form  2/8/2019 DONE
BLD-Final2/7/20192/7/20192/7/2019PPART
DetailsMike Jordan
Julian Phone #: ###-####. Ok for temp occ. to use the new sevice/lube addition. Still some storefront work and plan mod for the deletion of the storage room.
FIRE-Final Inspection2/6/20192/7/20192/7/2019APART
DetailsTroy Cobbley
Life safety passed for new oil change building. Relocated fire hydrant is approved but requires a plan mod prior to a final life safety sign off on the scope of work.

julian Phone #: ###-####
BLD-Conference2/1/20192/4/20192/5/2019ADONE
DetailsMike Jordan
Julian Phone #: ###-####
PubWorks Occupancy Approval1/31/20191/31/20191/31/2019 DONE
DetailsTiffany Lowery
FIRE-Final Inspection1/24/20191/28/20191/28/2019AFAIL
DetailsTroy Cobbley
Inspection was just for the shop area since other work is not complete. To allow use of the shop area the relocated fire hydrant needs tto be approved by plan review, the existing overhead door needs to be removed as per plan for our exit path and the walls the dealer wants to keep shown on a revised building plan, also on the path of egress the thumbturn deadbolt needs to be removed at the exterior exit door and the exit sign over this same door repaired. In the other areas shown to be modified the Storage Room was not built which will need to be addressed on modified approved plans.

Juilan Phone #: ###-####
BLD-Foundation11/16/201811/16/201811/16/2018PPART
DetailsJim Sly
cmu grout at 1 (mti) // tony Phone #: ###-####
ok pending MTI special inspection, tests and approvals.
BLD-Concrete11/12/201811/13/201811/13/2018PDEFR
DetailsMike Jordan
Requesting CMU re- bar ; grout inspection, grout is scheduled for 1;30. MTI will also being doing special inspections.
, Thank you Tony. Phone #: ###-#### Inspection requested via web by Tony Inserra
BLD-Foundation10/18/201810/19/201810/19/2018PPEND
DetailsDave Hannah
pouring at 2pm- Tony Phone #: ###-#### ok after spec. sign off
BLD-Footing10/15/201810/16/201810/16/2018PPASS
DetailsMike Jordan
concrete 130 // Tony Phone #: ###-####
Issue PAID IN FULL permit  9/19/2018 DONE
Print Occupancy Form  9/19/2018 DONE
OVERRIDE  9/17/2018  
Permit Ready to Issue  9/17/2018 DONE
Need
RP
GC Form
Revised Cert of Value
Plan assigned to (CDM)7/2/20187/2/20189/14/2018 PASS
DetailsCarl D Madsen
Lithia Ford of Boise
Routing Off Site - STRUCTURAL9/14/2018 9/14/2018 PASS
DetailsCarl D Madsen
PLANS/APPL TAKEN TO FRONT DESK  9/14/2018 DONE
Routing Off Site - STRUCTURAL9/1/2018 9/11/2018 FAIL
DetailsCarl D Madsen
Routing - PLAN CHECK9/1/2018 9/7/2018 PASS
DetailsCarl D Madsen
Pending structural review
Route to Impact Fee Review8/11/20188/14/20188/13/2018 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - PLAN CHECK7/5/2018 8/11/2018 FAIL
DetailsCarl D Madsen
Routing - PLANNING7/5/2018 8/11/2018 PASS
DetailsCarl D Madsen
Passedper Eplan
Routing - PUBLIC WORKS7/5/2018 8/11/2018 PASS
DetailsCarl D Madsen
Passedper Eplan
Routing Off Site - STRUCTURAL7/5/2018 8/11/2018 FAIL
DetailsCarl D Madsen
1st review completed  8/11/2018 FAIL
Routing - FIRE7/5/20187/5/20188/1/2018 PASS
DetailsErika Akin
Attached comments to case
Routing PW Environmental7/5/2018 7/19/2018 PASS
DetailsTerry Alber
Must be flammable liquids interceptor (see markup Pretreatment_1 on P2.1 Plumbing Waste - New).
Routing PW Street Lights7/5/2018 7/9/2018 PASS
DetailsTom Marshall
Routing PW Drainage7/5/2018 7/9/2018 PASS
DetailsBrian Murphy
Routing - Erosion and Sediment7/5/2018 7/6/2018 PASS
DetailsAndy J. Long
ESC plan approved. Certified RP not yet determined, must have for permit to be issued.
Routing - Design Review7/5/2018 7/6/2018 PASS
DetailsKatelyn Menuge
DRH17-00463 and DRH18-00216
Pending Assignment by CDM7/5/2018 7/5/2018 DONE
DetailsCarl D Madsen
Routing - Addressing7/5/2018 7/5/2018 PASS
DetailsDoug Chausow
Routing - MECHANICAL7/5/2018 7/5/2018 PASS
DetailsChad Schwendiman
Routing - PLUMBING7/5/2018 7/5/2018 PASS
DetailsDaryl Spivey
See redline notes and install per ISPC.
Routing PW Sewer Design7/5/2018 7/5/2018 PASS
DetailsDeAnn Brown
Plans ACCEPTED BY PLAN TECH  7/2/2018 DONE
Intake Approval  7/2/2018 PASS
DetailsCarl D Madsen
Recd Pcfee & Taken To Pln CK  7/2/2018 DONE
Intake Approval  6/29/2018 FAIL
Application received  6/26/2018 DONE
Application submitted via PDS Online on Jun 26 2018 4:59PM