Print Statement | | | 11/21/2019 | | DONE |
|
|
|
|
First Notice | | 9/28/2019 | 10/29/2019 | | DONE |
|
|
|
mailed 11-1
|
Permanent Occupancy | | | 9/18/2019 | | DONE |
|
|
|
|
BLD-Final | 9/16/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Mike Jordan
|
|
|
Call ahead // David Phone #: ###-####. Ok for perm occ.
|
FIRE-Final Inspection | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | PASS |
Mike Jordan
|
|
|
Call ahead // David Phone #: ###-####. All issues have been reolved.
|
Telephone call | | | 9/17/2019 | | DONE |
|
|
|
received a call-they left a message so i called them back-they just said they had questions about the C of O-so i called them back and left a message-told them if they want the C of O they need to come in or email permits@cityofboise.org
|
Telephone call | | | 9/12/2019 | | DONE |
|
|
|
called Paola to let know the temp c of o is epired. She will email Jason Blais to requet an extension
|
FIRE-Final Inspection | 7/22/2019 | 7/23/2019 | 7/24/2019 | A | FAIL |
Troy Cobbley
|
|
|
Provide single action hardware on the two store front doors as discussed. Fire alarm has been addressed.
Mark Phone #: ###-####
|
BLD-Final | 7/22/2019 | 7/23/2019 | 7/23/2019 | P | NR |
Mike Jordan
|
|
|
Mark Phone #: ###-####. Issues with door hardware. Waiting for plan review. Will need to reschedule.
|
Temporary Occupancy | 7/12/2019 | 10/10/2019 | 7/12/2019 | | DONE |
Candy A. Nichols
|
|
|
Jason Blais ok'd extension for 60 days on the temp c of o
|
Telephone call | | | 7/10/2019 | | DONE |
|
|
|
called Paiula to let know temp c of o is expired-gave her Jason's email to request an extension
|
FIRE-Final Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 | P | FAIL |
Troy Cobbley
|
|
|
Provide fire alarm modifications for the required manual pull station at the new door, provide single action hardware on the two new store front doors as discussed.
Mark Phone #: ###-####
|
BLD-Final | 6/17/2019 | 6/18/2019 | 6/17/2019 | A | CANC |
Mike Jordan
|
|
|
Mark Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 6/7/2019 | | |
|
|
|
plan mod
|
OVERRIDE | | | 5/24/2019 | | |
|
|
|
|
OVERRIDE | | | 5/24/2019 | | |
|
|
|
|
Plan assigned to (CDM) | 5/9/2019 | 5/9/2019 | 5/24/2019 | | PASS |
Carl D Madsen
|
|
|
PLAN MOD
|
Permit Ready to Issue | | | 5/24/2019 | | DONE |
|
|
|
met- plan mod
|
Routing - MECHANICAL | 5/20/2019 | | 5/23/2019 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 5/20/2019 | 5/20/2019 | 5/22/2019 | | PASS |
Erika Akin
|
|
|
Hydrant placement altered b/c utility easement. New location shown on revised plan sheet C5.0.
|
Routing - PLAN CHECK | 5/20/2019 | | 5/22/2019 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PUBLIC WORKS | 5/20/2019 | | 5/20/2019 | | PASS |
Morgan Webb
|
|
|
|
Temporary Occupancy | 5/10/2019 | 8/8/2019 | 5/10/2019 | | DONE |
Candy A. Nichols
|
|
|
as per Jason Blais-temp c of o extension good for 60 days from 5/9/19
|
Plan Modification Accepted | | | 5/9/2019 | | |
Carl D Madsen
|
|
|
Plan mod- changes fire hydrant per fire inspector- sheet numbers C50, A1.3 A2.1 A6.1, A10.1, A10.2, E2.1 , P2.2 & M2.1
|
Telephone call | | | 5/7/2019 | | DONE |
|
|
|
called Paoula to let know temp c of o will expire on the 9th of May. She will find out if they need a final or an extension
|
Temporary Occupancy | 2/8/2019 | 5/9/2019 | 2/8/2019 | | DONE |
Brittany Hill
|
|
|
|
Print Occupancy Form | | | 2/8/2019 | | DONE |
|
|
|
|
BLD-Final | 2/7/2019 | 2/7/2019 | 2/7/2019 | P | PART |
Mike Jordan
|
|
|
Julian Phone #: ###-####. Ok for temp occ. to use the new sevice/lube addition. Still some storefront work and plan mod for the deletion of the storage room.
|
FIRE-Final Inspection | 2/6/2019 | 2/7/2019 | 2/7/2019 | A | PART |
Troy Cobbley
|
|
|
Life safety passed for new oil change building. Relocated fire hydrant is approved but requires a plan mod prior to a final life safety sign off on the scope of work.
julian Phone #: ###-####
|
BLD-Conference | 2/1/2019 | 2/4/2019 | 2/5/2019 | A | DONE |
Mike Jordan
|
|
|
Julian Phone #: ###-####
|
PubWorks Occupancy Approval | 1/31/2019 | 1/31/2019 | 1/31/2019 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 1/24/2019 | 1/28/2019 | 1/28/2019 | A | FAIL |
Troy Cobbley
|
|
|
Inspection was just for the shop area since other work is not complete. To allow use of the shop area the relocated fire hydrant needs tto be approved by plan review, the existing overhead door needs to be removed as per plan for our exit path and the walls the dealer wants to keep shown on a revised building plan, also on the path of egress the thumbturn deadbolt needs to be removed at the exterior exit door and the exit sign over this same door repaired. In the other areas shown to be modified the Storage Room was not built which will need to be addressed on modified approved plans.
Juilan Phone #: ###-####
|
BLD-Foundation | 11/16/2018 | 11/16/2018 | 11/16/2018 | P | PART |
Jim Sly
|
|
|
cmu grout at 1 (mti) // tony Phone #: ###-#### ok pending MTI special inspection, tests and approvals.
|
BLD-Concrete | 11/12/2018 | 11/13/2018 | 11/13/2018 | P | DEFR |
Mike Jordan
|
|
|
Requesting CMU re- bar ; grout inspection, grout is scheduled for 1;30. MTI will also being doing special inspections. , Thank you Tony. Phone #: ###-#### Inspection requested via web by Tony Inserra
|
BLD-Foundation | 10/18/2018 | 10/19/2018 | 10/19/2018 | P | PEND |
Dave Hannah
|
|
|
pouring at 2pm- Tony Phone #: ###-#### ok after spec. sign off
|
BLD-Footing | 10/15/2018 | 10/16/2018 | 10/16/2018 | P | PASS |
Mike Jordan
|
|
|
concrete 130 // Tony Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/19/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/19/2018 | | DONE |
|
|
|
|
OVERRIDE | | | 9/17/2018 | | |
|
|
|
|
Permit Ready to Issue | | | 9/17/2018 | | DONE |
|
|
|
Need
RP
GC Form
Revised Cert of Value
|
Plan assigned to (CDM) | 7/2/2018 | 7/2/2018 | 9/14/2018 | | PASS |
Carl D Madsen
|
|
|
Lithia Ford of Boise
|
Routing Off Site - STRUCTURAL | 9/14/2018 | | 9/14/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2018 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/1/2018 | | 9/11/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 9/1/2018 | | 9/7/2018 | | PASS |
Carl D Madsen
|
|
|
Pending structural review
|
Route to Impact Fee Review | 8/11/2018 | 8/14/2018 | 8/13/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing - PLAN CHECK | 7/5/2018 | | 8/11/2018 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 7/5/2018 | | 8/11/2018 | | PASS |
Carl D Madsen
|
|
|
Passedper Eplan
|
Routing - PUBLIC WORKS | 7/5/2018 | | 8/11/2018 | | PASS |
Carl D Madsen
|
|
|
Passedper Eplan
|
Routing Off Site - STRUCTURAL | 7/5/2018 | | 8/11/2018 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 8/11/2018 | | FAIL |
|
|
|
|
Routing - FIRE | 7/5/2018 | 7/5/2018 | 8/1/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing PW Environmental | 7/5/2018 | | 7/19/2018 | | PASS |
Terry Alber
|
|
|
Must be flammable liquids interceptor (see markup Pretreatment_1 on P2.1 Plumbing Waste - New).
|
Routing PW Street Lights | 7/5/2018 | | 7/9/2018 | | PASS |
Tom Marshall
|
|
|
|
Routing PW Drainage | 7/5/2018 | | 7/9/2018 | | PASS |
Brian Murphy
|
|
|
|
Routing - Erosion and Sediment | 7/5/2018 | | 7/6/2018 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. Certified RP not yet determined, must have for permit to be issued.
|
Routing - Design Review | 7/5/2018 | | 7/6/2018 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00463 and DRH18-00216
|
Pending Assignment by CDM | 7/5/2018 | | 7/5/2018 | | DONE |
Carl D Madsen
|
|
|
|
Routing - Addressing | 7/5/2018 | | 7/5/2018 | | PASS |
Doug Chausow
|
|
|
|
Routing - MECHANICAL | 7/5/2018 | | 7/5/2018 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - PLUMBING | 7/5/2018 | | 7/5/2018 | | PASS |
Daryl Spivey
|
|
|
See redline notes and install per ISPC.
|
Routing PW Sewer Design | 7/5/2018 | | 7/5/2018 | | PASS |
DeAnn Brown
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 7/2/2018 | | DONE |
|
|
|
|
Intake Approval | | | 7/2/2018 | | PASS |
Carl D Madsen
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/2/2018 | | DONE |
|
|
|
|
Intake Approval | | | 6/29/2018 | | FAIL |
|
|
|
|
Application received | | | 6/26/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 26 2018 4:59PM
|