BLD-Final | 6/3/2020 | 6/4/2020 | 6/4/2020 | A | PASS |
Tell Riley
|
|
|
screened // Brandon Phone #: ###-####//see zoning for easment vacation///
|
DOC - Permit Finaled | 6/4/2020 | 6/4/2020 | 6/4/2020 | P | PASS |
Tell Riley
|
|
|
easment vacated and email recieved from zoning allowing occupancy//
|
BLD-Conference | 5/27/2020 | 6/5/2020 | 6/4/2020 | A | CANC |
Tell Riley
|
|
|
follow up on easement// Brandon ###-####//
|
BLD-Conference | 4/29/2020 | 5/27/2020 | 5/27/2020 | A | DONE |
Tell Riley
|
|
|
follow up on easement//###-####//Brandon//approved by council, waiting on signed resolution and ok from zoning//will follow up//
|
BLD-Conference | 3/25/2020 | 4/29/2020 | 4/29/2020 | A | DONE |
Tell Riley
|
|
|
status on easments//Brandon Phone #: ###-####//discussed with Brandon, no information yet on if easment has been vacated// will check back in 30 days or Brandon will contact me//
|
BLD-Blower Door Test Results | 3/25/2020 | 3/25/2020 | 3/25/2020 | P | DONE |
Tell Riley
|
|
|
2.49 ACH 50
|
BLD-Final | 3/24/2020 | 3/25/2020 | 3/25/2020 | A | PART |
Tell Riley
|
|
|
Brandon Phone #: ###-####//ok for temp until easment is vacated//check back 30 days//
|
BLD-Conference | 3/23/2020 | 3/24/2020 | 3/24/2020 | A | DONE |
Tell Riley
|
|
|
call ahead // Brandon Phone #: ###-####
|
BLD-Wall Bracing | 1/7/2020 | 1/7/2020 | 1/7/2020 | P | PASS |
Tell Riley
|
|
|
interior shear in garage, nailing verified by photos sent from contractor at joint, specifically asked about blocking and he asured that blocks were in place at time of nailing// ok to cover//
|
BLD-Wall Bracing | 1/6/2020 | 1/6/2020 | 1/6/2020 | P | FAIL |
Tell Riley
|
|
|
brandon Phone #: ###-####//area in garage that needed blocked at joints and nailed has been taped and mudded--cannot see nails to verify blocking//CN still posted//
|
BLD-Wall Bracing | 12/31/2019 | 12/31/2019 | 12/31/2019 | P | PART |
Tell Riley
|
|
|
brandon Phone #: ###-####//inside of house ok--tall wall in garage needs to be blocked at break (edges) and nailed for shear per plans//CN issued for garage area//
|
BLD-Wall Bracing | 12/27/2019 | 12/30/2019 | 12/30/2019 | P | FAIL |
Tell Riley
|
|
|
Brandon Phone #: ###-####//need to add nails for 4" pattern per plans//add blocks and nails at edges on garage//
|
BLD-Wall Bracing | 12/23/2019 | 12/24/2019 | 12/24/2019 | A | FAIL |
Tell Riley
|
|
|
brandon Phone #: ###-####//interior GB shear does not meet plans//add nails and block edges//
|
BLD-Energy code compliance | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PASS |
Tell Riley
|
|
|
Matt Phone #: ###-####
|
BLD-Framing/Rough-in | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PASS |
Tell Riley
|
|
|
Matt Phone #: ###-####//corrections made//
|
BLD-Framing/Rough-in | 12/9/2019 | 12/11/2019 | 12/11/2019 | A | PART |
Tell Riley
|
|
|
Matt Phone #: ###-####//correction notice posted//ok to insulate//
|
BLD-Wall Bracing | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
Tell Riley
|
|
|
shear // Matt Phone #: ###-####//plan mod changes reflect onsite shear per enginnering//
|
OVERRIDE | | | 12/4/2019 | | |
|
|
|
|
Plan assigned to (J_N) | 11/18/2019 | 11/18/2019 | 12/4/2019 | | DONE |
Jenny Nelson
|
|
|
Plan mod -
|
Routing - PLANNING | 11/18/2019 | | 12/4/2019 | | PASS |
Jeff Lowe
|
|
|
NO C OF O UNTIL EASEMENT IS VACATED. HAVE BEEN IN CONTACT WITH APPLICANT ABOUT PROCESS.
|
Permit Ready to Issue | | | 12/4/2019 | | DONE |
|
|
|
plan mod approved
|
CHANGE STATUS TO (ISS) | | | 12/4/2019 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/18/2019 | | 11/22/2019 | | PASS |
Jenny Nelson
|
|
|
No floor plan changes, updated engineering for shear wall
|
Plan Modification Accepted | | | 11/18/2019 | | DONE |
|
|
|
Jeff Adalte from Mendiola Custom Homes called to start a plan mod workflow for new engineering for wall bracing. Sheets A1.1 and A1.2
|
BLD-Wall Bracing | 11/8/2019 | 11/12/2019 | 11/12/2019 | A | FAIL |
Tell Riley
|
|
|
shear // Matt Phone #: ###-####//need plan mod for changes in shear locations--provide updated engineering as all shear walls are engineered//add hold downs at garage PFH per plans//
|
Routing - MECHANICAL | 11/6/2019 | | 11/6/2019 | | PASS |
Troy James
|
|
|
New manual j report
|
BLD-Footing | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | PASS |
Tell Riley
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 8/23/2019 | 8/23/2019 | 8/23/2019 | P | PART |
Tell Riley
|
|
|
Ryan Phone #: ###-####//WIP//
|
Issue PAID IN FULL permit | | | 8/12/2019 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/12/2019 | | DONE |
|
|
|
|
OVERRIDE | | | 8/1/2019 | | |
|
|
|
|
Plan assigned to (RDP) | 7/19/2019 | 7/19/2019 | 8/1/2019 | | DONE |
Rob Patrick
|
|
|
08/01 sfd L1 ePlan
|
Routing - PLAN CHECK | 7/19/2019 | | 8/1/2019 | | PASS |
Rob Patrick
|
|
|
|
1st review completed | | | 8/1/2019 | | DONE |
Rob Patrick
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/1/2019 | | DONE |
Rob Patrick
|
|
|
|
Permit Ready to Issue | | | 8/1/2019 | | DONE |
|
|
|
email permits to mendiolacustomhomes@gmail.com and/or jeff@precisionframinginc.com
|
Routing - MECHANICAL | 7/29/2019 | | 7/29/2019 | | PASS |
Chad Schwendiman
|
|
|
|
Routing - MECHANICAL | 7/19/2019 | | 7/23/2019 | | FAIL |
Chad Schwendiman
|
|
|
Submitted plans show R-49 blow in ceilings. Need to Verify floor insulation, According to the application there should be rescheck form but I couldn't find it.
|
Route to Impact Fee Review | 7/19/2019 | 7/22/2019 | 7/22/2019 | | PASS |
Eric Bilimoria
|
|
|
Initial residential review of new SFD permits requested for now.
|
Routing - PLANNING | 7/19/2019 | | 7/22/2019 | | PASS |
Jeff Lowe
|
|
|
|
Routing - PUBLIC WORKS | 7/19/2019 | | 7/22/2019 | | PASS |
Angela Hardy
|
|
|
|
Application received | | | 7/19/2019 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 19 2019 10:09AM
|
Plans ACCEPTED BY PLAN TECH | | | 7/19/2019 | | DONE |
|
|
|
|
Intake Approval | | | 7/19/2019 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/19/2019 | | DONE |
|
|
|
|
Routing - Addressing | 7/19/2019 | | 7/19/2019 | | PASS |
Doug Chausow
|
|
|
|