Permit Information
Permit NumberBLD19-03898
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 9300 W OVERLAND RD Unit: SUITE 200
Project NameUnitek College - 2nd story
Customer Number 
ePlanReviewYes
Description
(UNITEK COLLEGE – PRIVATE NURSING SCHOOL – ENTIRE 2ND STORY) The fire sprinkler system is used for building area increase, for fire area, for fire flow, and to substitute for 1-hr rated corridors. Unless already provided, quick-response fire sprinkler heads are required to be installed throughout the entire 2nd story. To remodel the entire 25,039 square foot 2nd story of an existing two-story building for a new nursing school that will occupy the entire 2nd story (24,158 square feet without shafts and stairways included). Work is to include interior nonbearing walls, interior glass windows, interior one-way glass windows, interior doors, suspended acoustical ceilings, gypsum board soffits, millwork, and finishes. The existing toilet rooms are required to be maintained accessible to the disabled in compliance with the codes in effect when they were created. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 (including quick-response sprinkler heads unless already installed) and the fire alarm system (horns and strobes) is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/12/20207/9/2020 DONE
mailed 7-9-2020
Second Notice 4/13/20205/7/2020 DONE
mailed 5-8-2020
First Notice 4/2/20204/3/2020 DONE
mailed 4-6-2020
Permanent Occupancy  3/23/2020 DONE
BLD-Final3/19/20203/20/20203/20/2020APASS
DetailsMike Jordan
nate Phone #: ###-####. Occupant load sign posted and seating installed. Ok for perm occ.
CHANGE STATUS TO (TMP)  3/19/2020 DONE
Permit not supposed to be finaled needs a pass not part on bld final
FIRE-Final Inspection3/13/20203/13/20203/13/2020PPASS
DetailsTroy Cobbley
Life safety passed.

Phone #: ###-#### Inspection requested via web by Nate Carriveau
Temporary Occupancy2/27/20205/27/20202/27/2020 DONE
DetailsBrittany Hill
BLD-Final2/25/20202/26/20202/26/2020APART
DetailsMike Jordan
Temp Occupancy Phone #: ###-#### Inspection requested via web by Nate Carriveau. Ok for temp occ. Needs to post max of 40 occupant load sign in room 138 and have fixed seating installed.
FIRE-Final Inspection2/25/20202/25/20202/25/2020PPART
DetailsTroy Cobbley
A temporary for life safety is being given for 90 days. A final life safety can be given when the project related fire alarm permit is finaled.

Phone #: ###-#### Inspection requested via web by Nate Carriveau
FIRE-Final Inspection2/24/20202/24/20202/24/2020PFAIL
DetailsTroy Cobbley
Life safety will be ok to pass when the project related fire alarm permit is finaled.

Phone #: ###-#### Inspection requested via web by Nate Carriveau
FIRE-Final Inspection2/21/20202/21/20202/21/2020PFAIL
DetailsTroy Cobbley
Need the project related fire alarm permit finaled. Need the two exit signs modified as discussed. Need suite number posted. All other items appear ok. Phone #: ###-#### Inspection requested via web by Nate Carriveau
BLD-Ceiling Grid Inspection1/30/20201/31/20201/31/2020PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Nate Carriveau
BLD-Ceiling Grid Inspection1/29/20201/30/20201/30/2020APART
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Nate Carriveau need mains supported max 8 inches both ends of mains/ ok to flood sm rooms and primtors ajsent to mains.
BLD-Ceiling Grid Inspection1/23/20201/24/20201/24/2020APASS
DetailsMike Jordan
West half of building Phone #: ###-#### Inspection requested via web by Nate Carriveau
BLD-Framing/Rough-in12/17/201912/18/201912/18/2019AFAIL
DetailsMike Jordan
Soffit inspection to cover Phone #: ###-#### Inspection requested via web by Nate Carriveau. Soffits to be supported from rtop chord or pan decking, or provide engineering showing bottom chords of joist can support additional loads.
BLD-Framing/Rough-in12/12/201912/13/201912/13/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Nate Carriveau. Remainder of interior steel stud framed walls ok.
BLD-Framing/Rough-in12/5/201912/6/201912/6/2019PPASS
DetailsMike Jordan
Partial inspection for West side of building. Phone #: ###-#### Inspection requested via web by Nate Carriveau. Interior steel stud framed walls, west half only. No grid, hardlids or soffits at this time.
Print Occupancy Form  12/3/2019 DONE
Issue PAID IN FULL permit  12/2/2019 DONE
Print Occupancy Form  12/2/2019 DONE
Telephone call  12/2/2019 DONE
Emailed Mitch to ask if ACHD fees are due and if an inspection is needed.
Plan assigned to (CJW)10/7/201910/29/201911/27/2019 PASS
DetailsCarl Westfall
(1st done) 10/22/19 (L-3 - 15 days) (eplan - 22 sheets) Unitek College (route to staff)
Routing - PLANNING1/27/2019 11/27/2019 PASS
DetailsJeff Lowe
route to Jeff
Plan resubmittals received  11/27/2019 DONE
Routing - PLAN CHECK11/27/2019 11/27/2019 PASS
DetailsCarl Westfall
PLANS/APPL TAKEN TO FRONT DESK  11/27/2019 DONE
Permit Ready to Issue  11/27/2019 DONE
MET jnorton@jwci.com
Need GC
Need Revised Value
Plan resubmittals requested  11/19/2019 DONE
Routing - MECHANICAL11/15/2019 11/15/2019 PASS
DetailsTroy James
Routing - PLAN CHECK11/13/2019 11/15/2019 PASS
DetailsCarl Westfall
Routing PW Sewer Rating11/15/2019 11/15/2019 PASS
DetailsMorgan Webb
Proposed mop sink removed
Routing - PLANNING11/15/2019 11/15/2019 FAIL
DetailsDavid Moser
Appeal period not over yet for CUP19-00081
Plan resubmittals received  11/13/2019 DONE
Route to Impact Fee Review10/31/201911/3/201911/1/2019 PASS
DetailsEric Bilimoria
Review requested for Commercial Permit
Routing - FIRE10/7/201910/7/201910/31/2019 PASS
DetailsErika Akin
Attached comments to case
1st review completed  10/31/2019 DONE
Plan resubmittals requested  10/31/2019 DONE
Routing - PLAN CHECK10/7/2019 10/31/2019 FAIL
DetailsCarl Westfall
Revised drawings required
Routing - MECHANICAL10/7/2019 10/14/2019 FAIL
DetailsTroy James
Need Idaho stamped plans for mechanical, plumbing and electrical.
Routing - PLANNING10/7/2019 10/9/2019 FAIL
DetailsDavid Moser
CUP15-00030 requires the future expansion to the CWI Facility obtain planning approval prior to issuance of buildings and or Certificates of Occupancy. This BLDG permit will expand nursing classrooms into the rest of the office bldg. As such, a CUP modification is required.
Routing PW Environmental10/8/2019 10/9/2019 PASS
DetailsRick Christenson
Routing - Addressing10/7/2019 10/8/2019 PASS
DetailsDoug Chausow
Routing - PUBLIC WORKS10/7/2019 10/8/2019 PASS
DetailsMorgan Webb
Routing - PLUMBING10/7/2019 10/8/2019 PASS
DetailsDan Ediger
Per Plans and ISPC
Plan Reviewer's activity  10/2/2019 PASS
Plan intake review approved
Intake Approval  10/2/2019 PASS
Application received  9/30/2019 DONE
Application submitted via PDS Online on Sep 30 2019 4:47PM