Permit Information
Permit NumberESC18-01163
StatusFinaled
Name JUSTIN REYNOLDS
Site Address 5131 N CORRALERO LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Foothils Zone Site specific ESC permt and conditions. Set up BMPs per site map, including construction entrance, perimeter sediment controls and slope controls. Site preparation inspection is required prior to excavation.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/5/20199/5/20199/5/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled9/5/20199/5/20199/5/2019PPASS
DetailsMichael Zawacki
General Inspection8/21/20198/21/20198/21/2019 PASS
DetailsMichael Zawacki
Washout has been cleaned.
General Inspection8/2/20198/2/20198/2/2019 FAIL
DetailsAndy J. Long
Dumped concrete washout on upper lot. Either from pool or home below.
General Inspection7/18/20197/18/20197/18/2019 CANC
DetailsAndy J. Long
General Inspection7/3/20197/3/20197/3/2019 PASS
DetailsMichael Zawacki
House and pool completed, landscaping in progress.
General Inspection5/16/20195/16/20195/16/2019PPASS
DetailsAndy J. Long
Stockpile on adjacent lot has been removed. Homeowner is hiring crew to finish landscaping. Pool crew utilized a contained washout. No corrections.
BMP Violation4/12/20194/12/20194/17/2019PPEND
DetailsAndy J. Long
Trash picked up, BMPs reinstalled. Ecopan washout removed. Fines paid.

Still need to move stockpile off of upper lot this week.
Fees Due Hold4/9/2019 4/15/2019 DONE
Details
BMP Violation4/8/20194/8/20194/8/2019AFAIL
DetailsAndy J. Long
Using adjacent lot without permission. Large stockpile and trackout occuring. Workers driving through mud and parking in the back. Should be for essential access only.

Parcel hold until site is cleaned up, stockpile removed or arrangement worked out with lot owner.
Complaint Inspection3/29/20193/29/20193/29/2019PDONE
DetailsAndy J. Long
trash along Bogus Basin road?

RP to pick up trash visible for BB road in the landscaped portion of the subdivision.
Complaint Inspection3/26/20193/27/20193/27/2019APASS
DetailsMichael Zawacki
Trash has all been cleaned and bin is in neighboring home garage. Talked to inspector representing buyers, said on Monday trash bin was blown over and garbage was every where. All cleaned. Some rills coming on and leaving lot.
General Inspection1/8/20191/8/20191/8/2019PPART
DetailsMichael Zawacki
Site is clean and contained. Material being stored on lot above home.
Lots of mud from lot below.
Fees Due Hold9/18/2018 12/27/2018 DONE
DetailsTisha Gallop
General Inspection11/23/201811/23/201811/23/2018PPASS
DetailsAndy J. Long
WIP on frame. Perimeter BMPs installed, site fenced off to prevent access and trackout. No corrections requested. No discharges, uncontained trash or trackout.
Tracking Control10/31/201811/2/201811/6/2018APASS
DetailsMichael Zawacki
WIP on framing. Road and sidewalk being swept, site kept clean.
General Inspection10/23/201810/23/201810/25/2018APART
DetailsMichael Zawacki
Foundation completed and work begun on framing and floor. Lots of trackout, looks like it has been swept but still showing. Eco pan on road. No trash.
General Inspection9/24/201810/4/201810/4/2018PPART
DetailsMichael Zawacki
Large rill has formed draining onto lot below. No sediment making it onto road or sidewalk.
Site Preparation9/24/20189/24/20189/24/2018PPASS
DetailsAndy J. Long
Justin ###-#### @ 2:30

Approved for excavation. Existing driveway approach to be leveled, will install additional controls or pave during foundation work.

Gravel check bag to be installed in gutter. RP Justin is working with developer to get a designated washout on the common area at top of culdesac. Will preserve existing earthen berm around parcel as perimeter control.
Permit Ready to Issue  9/17/2018 DONE
Kristine came in to pay but the checks were over the amount that is due and take 2 weeks to be redone-Rita ok'd permits to be issued so footing/foundation inspections can be done. No other inspections can be done until the new checks have been recieved
Issue & PRINT to be Invoiced  9/17/2018 DONE
Kristine came in to pay but the checks were over the amount that is due and take 2 weeks to be redone-Rita ok'd permits to be issued so footing/foundation inspections can be done. No other inspections can be done until the new checks have been recieved
Routing - Erosion and Sediment8/30/2018 8/30/2018 PASS
DetailsAndy J. Long
ESC plan with narrative and site map approved. Certified stormwater team designated. ESC Site Preparation Inspection is REQUIRED,
Application received  8/9/2018