INSP-Final Inspection | 9/27/2019 | 9/27/2019 | 9/27/2019 | A | PASS |
Jim Page
|
|
|
Plan mods have been approved and verified, final fire alarm inspection is complete
|
INSP-Sprinkler Rough-in/Hydro | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | CANC |
Jim Page
|
|
|
Wrong inspection type for inspection request, this request is cancelled.
.
David Phone #: ###-####
|
Permit Ready to Issue | | | 9/24/2019 | | DONE |
|
|
|
plan mod approved
DO NOT REISSUE
|
CHANGE STATUS TO (ISS) | | | 9/24/2019 | | DONE |
|
|
|
plan mod
|
Fees Due Hold | 9/13/2019 | | 9/24/2019 | | DONE |
Tiffany Carson-Herker
|
|
|
Plan Mod fees added along with reinspection fee
|
1st review completed | | | 9/23/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 9/23/2019 | | 9/23/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/23/2019 | | DONE |
|
|
|
Plan mod approved. No additional comments.
|
Plan Modification Accepted | | | 9/18/2019 | | DONE |
|
|
|
|
INSP-Final Inspection | 9/12/2019 | 9/13/2019 | 9/13/2019 | P | PART |
Jim Page
|
|
|
Initiating devices in common areas tested. Audio visual notification has been tested. Fire sprinkler initiating devices has been tested. Notification to be added in trash rooms on each floor, will verify before final C of O. Monitoring has been verified.
David Phone #: ###-####
|
INSP-Final Inspection | 9/11/2019 | 9/12/2019 | 9/12/2019 | P | FAIL |
Jim Page
|
|
|
Panel shows ground fault trouble, needs to be corrected. FDC bell only rings with level 1 stair 2 riser, no other flow switches are hooked to bell, FDC bell needs to ring during all water flow events.
Trey Phone #: ###-####
|
INSP-Final Inspection | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | FAIL |
Jim Page
|
|
|
Audio intelligibility not met in numerous areas. Smoke detector in ADA room on level 1 overspaced, detector is more than 21 foot from corner of room. A/V device in level 1 elevator lobby is overspaced. Notated city approved draiwngs other areas requiring correction. Inspection was stopped on level 2 due to deficiencies noted, all fire sprinkler and initiating devices still and audio visual coverage still need inspected. Monitoring account has been verified, have not checked signals with monitoring as of this entry.
David Phone #: ###-####
|
INSP-Final Inspection | 9/5/2019 | 9/6/2019 | 9/6/2019 | P | FAIL |
Jim Page
|
|
|
Walkthrough on level 1 performed, notated city approved drawings with red ink areas requiring correction, inspection stopped on level 1 due to amount of items marked. No sprinkler monitoring devices or initiating devices tested.
David Phone #: ###-####
|
INSP-Final Inspection | 8/30/2019 | 8/30/2019 | 8/30/2019 | P | CANC |
Jim Page
|
|
|
Cancelled per conversation with point of contact, will be rescheduled for a later date.
Tre Phone #: ###-####
|
Plan assigned to (Lee) | 8/14/2019 | | 8/15/2019 | | DONE |
Lee G Meredith
|
|
|
as built
|
1st review completed | | | 8/15/2019 | | PASS |
|
|
|
|
Alarm Plan Check | 8/15/2019 | | 8/15/2019 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/15/2019 | | DONE |
|
|
|
As built - No fee.
|
Permit Ready to Issue | | | 8/15/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/15/2019 | | DONE |
|
|
|
per Lee M no fee's for as built
|
Plan resubmittals received | | | 8/14/2019 | | DONE |
|
|
|
Start as built workflow per Emily at Wiretech
|
Issue and Print Permit | | | 9/26/2018 | | DONE |
|
|
|
|
Alarm Plan Check | 9/24/2018 | | 9/25/2018 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/25/2018 | | DONE |
|
|
|
3rd review approved with review comments.
|
Permit Ready to Issue | | | 9/25/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/24/2018 | | DONE |
|
|
|
|
Telephone call | | | 9/19/2018 | | DONE |
|
|
|
Conference call with Emily, the designer and Tom & Josh of DC Engineering to discuss failed review comments. All Items discussed. Some items just clarified while others will required design changes, as noted in the review comments.
|
Plan resubmittals received | | | 9/11/2018 | | DONE |
|
|
|
|
Alarm Plan Check | 9/11/2018 | | 9/11/2018 | | FAIL |
Lee G Meredith
|
|
|
See 2nd review comments.
|
Plan assigned to (Lee) | 5/10/2018 | | 5/10/2018 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 5/10/2018 | | FAIL |
|
|
|
See 1st review comments.
|
Miscellaneous action | | | 5/10/2018 | | DONE |
|
|
|
Emailed review comments to applicant.
|
Miscellaneous action | | | 5/8/2018 | | DONE |
|
|
|
Emailed Emily to let her know that we have not received drawings, product data or calculations yet and that these will be required prior to permit review and issuance. She responded to say she had been delayed on the upload but plans on completing it tomorrow.
|
Application received | | | 5/2/2018 | | DONE |
|
|
|
Application submitted via PDS Online on May 2 2018 9:11AM
|