INSP-Final Inspection | 5/20/2019 | 5/21/2019 | 5/21/2019 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Robert Chambers is the contact. He request that he be given a call an hour before the inspection so he can meet the inspector at the site. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 5/17/2019 | 5/21/2019 | 5/20/2019 | P | CANC |
Troy Cobbley
|
|
|
Colton Cox is the contact. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
Staff review | 5/16/2019 | 5/16/2019 | 5/17/2019 | | PASS |
Mark Stumbaugh
|
|
|
plan mod
|
Plan assigned to (Stumbaugh) | 5/16/2019 | | 5/17/2019 | | DONE |
Mark Stumbaugh
|
|
|
plan mod
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2019 | | DONE |
Mark Stumbaugh
|
|
|
Plan Mod Fee $150.00
|
Permit Ready to Issue | | | 5/17/2019 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 5/17/2019 | | DONE |
|
|
|
plan mod
|
INSP-Final Inspection | 5/15/2019 | 5/16/2019 | 5/16/2019 | P | FAIL |
Troy Cobbley
|
|
|
The wrong size of underground supply is still an issue. Need to flow water flow switch and test outside alarm bell.
Marcus Smith is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
Plan Modification Accepted | | | 5/16/2019 | | DONE |
|
|
|
per customer-plan mod started in e plan-assigned to MAS
|
INSP-Final Inspection | 5/15/2019 | 5/16/2019 | 5/15/2019 | A | CANC |
Troy Cobbley
|
|
|
Marcus Smith is the contact. Thank you for the hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Sprinkler Rough-in | 12/13/2018 | 12/17/2018 | 12/17/2018 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping is ok for cover. Supply piping size to the backflow preventor does not match plans and will need addressed prior to a final sign off.
Marcus Smith is the contact for this RTC inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
CHANGE STATUS TO (ISS) | | | 11/28/2018 | | DONE |
|
|
|
plan mod fees paid
|
(F) Reprint permit | | | 11/28/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/21/2018 | | DONE |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 11/21/2018 | | 11/21/2018 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/21/2018 | | DONE |
|
|
|
plan mod approved
|
INSP-Sprinkler Rough-in | 11/7/2018 | 11/13/2018 | 11/13/2018 | P | CANC |
Troy Cobbley
|
|
|
Per the fitter the revised plans have not been approved yet. No inspection was performed.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
Issue and Print Permit | | | 10/22/2018 | | DONE |
|
|
|
|
Intake Approval | | | 10/19/2018 | | PASS |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 10/19/2018 | | 10/19/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/19/2018 | | 10/19/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/19/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/19/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/19/2018 | | DONE |
|
|
|
|
Application received | | | 10/12/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 12 2018 2:55PM
|