Information based on query as of Thursday, June 13, 2024.
Permit Information
Permit NumberFIR18-00862
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 1713 W JEFFERSON ST
Project NameJefferson Flats Condo
Customer Number 
ePlanReviewYes
Description
[Jefferson Flats Condo]
The fire sprinkler scope of work consists of protecting a 9912 ft² three level building, Occupancy Class R-2, S-2 Construction Type V-B to be fully sprinklered per NFPA 13, 2016, Fire protection contractor point of connection to be at property line, Hot Tap, Gate Valve and 50" of 4" C900 from existing water main to property line by others. There is wet system with floor control valves and a dry system for the garage. All piping in living areas are CPVC the garage to have steel piping.

• The underground piping is under permit FIR18-00692.

[BLD17-01583]
Permit for the construction of a 6-unit, 3 story wood framed apartment building with work to include general site work and construction of the new building per the approved plans. This building fire sprinklered with a full NFPA-13 system. **JAR**

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/12/20194/12/20194/12/2019PPASS
DetailsJim Page
Previously noted items have been corrected, final fire sprinkler inspection complete.

Please call Tanner 30 minutes prior at ###-#### Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Final Inspection4/10/20194/11/20194/11/2019PFAIL
DetailsJim Page
Replace fire sprinkler head that was painted. Add missing sidewall in level 3 apartment.

Contact Tanner Loomis - ###-#### 30 min prior to Fire Final insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in4/8/20194/9/20194/9/2019ADONE
DetailsJim Page
24 hour air test for dry system complete.

Contact Tanner Loomis ###-#### 30 min Prior to 24 HR pressure Test start please, all Fees were PAID...04/08/19 AM...

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro4/8/20194/9/20194/9/2019ADONE
DetailsJim Page
Level 1 wet system hydro witnessed, no pressure loss observed.

Contact Tanner Loomis ###-#### 30 min Prior to Hydro Insp start please, all Fees were PAID...04/08/19 AM...

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro4/8/20194/8/20194/8/2019PPART
DetailsJim Page
24 hour air test started at 12PM with 42 PSI
INSP-Sprinkler Rough-in/Hydro4/4/20194/8/20194/8/2019PCANC
DetailsJim Page
Permit fees need to be paid before inspection can be performed, permit has fees due at time of this entry, this request is cancelled.

Contact Tanner Loomis ###-#### 30 min prior to 24 Hr Pressure Test please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in4/8/20194/8/20194/8/2019PCANC
DetailsJim Page
Permit fees need to be paid before inspection can be performed, permit has fees due at time of this entry, this request is cancelled.

Contact Tanner Loomis ###-#### 30 Min Prior to Hydro Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
Fees Due Hold4/6/2019 4/8/2019 DONE
DetailsCandy A. Nichols
INSP-Sprinkler Rough-in4/4/20194/5/20194/5/2019AFAIL
DetailsJim Page
Level 1 wet system lost 11 PSI during test.

Contact Tanner Loomis ###-#### 30 min prior to RTC insp Start of the 1st Floor and Dry System please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro4/5/20194/5/20194/5/2019APART
DetailsJim Page
Hydrostatic test for dry system witnessed, no pressure loss observed.
INSP-Sprinkler Rough-in4/1/20194/4/20194/4/2019PFAIL
DetailsJim Page
Both dry system and small wet system lost pressure, 6 PSI on dry, 15 PSI on small wet system. Larger wet system had no pressure loss observed.

Contact Tanner Loomis - ###-#### 30 Min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in1/14/20191/14/20191/14/2019APASS
DetailsJim Page
Rough in inspection for dry system complete.

Contact Noemi Carrero ###-#### 30 min prior to RTC Insp on DRY SYSTEM start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Supply line flush1/11/20191/14/20191/14/2019ADONE
DetailsJim Page
Underground main line flush complete.

Contacts will be Tanner Loomis - PFP ###-#### ; Stacy Stuart - SUEZ ###-####..All Parties would like to request a 9:00AM start time if possible, if not please let them know.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Supply line flush1/9/20191/11/20191/11/2019ACANC
DetailsTroy Cobbley
Canceled and rescheduled for monday as per contact.

Contact Tanner Loomis at ###-#### 30 mins before UG Flush insp please Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in1/4/20191/7/20191/7/2019APART
DetailsJim Page
Rough to cover inspection for level 1 wet system sprinkler piping complete, level 1 wet system approved for cover.

Contact Noemi Carrero - ###-#### 30 Min prior to RTC Insp for 1st floor wet system please

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in12/31/20181/2/20191/2/2019APART
DetailsJim Page
Rough to cover inspection for overehad fire sprinkkler piping located on levels 2 and 3 complete, levels 2 and 3 approved for cover.

Contact Andrew Larson ###-#### 30 min prior to RTC Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Sprinkler Rough-in12/28/201812/31/201812/31/2018AFAIL
DetailsTroy Cobbley
No city approved plans or small documents on site. No inspection was performed.


Tanner Phone #: ###-####
Sprinkler Plan Check12/12/2018 12/13/2018 PASS
DetailsMark Stumbaugh
PLANS/APPL TAKEN TO FRONT DESK  12/13/2018 DONE
DetailsMark Stumbaugh
Permit Ready to Issue  12/13/2018 DONE
met
Issue and Print Permit  12/13/2018 DONE
Plan resubmittals received  12/12/2018 DONE
DetailsMark Stumbaugh
Plan assigned to (Stumbaugh)12/12/2018 12/12/2018 DONE
DetailsMark Stumbaugh
Intake Approval  11/29/2018 PASS
DetailsTim Frost
Plan resubmittals received  11/29/2018 DONE
DetailsTim Frost
Plan assigned to (Tim)11/29/2018 11/29/2018 DONE
DetailsTim Frost
Sprinkler Plan Check11/29/2018 11/29/2018 FAIL
DetailsTim Frost
Miscellaneous action  11/29/2018 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Sprinkler Plan Check11/20/2018 11/20/2018 FAIL
DetailsTim Frost
1st review completed  11/20/2018 FAIL
DetailsTim Frost
Miscellaneous action  11/20/2018 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Intake Approval  11/16/2018 PASS
DetailsTim Frost
Plan assigned to (Tim)11/16/2018 11/16/2018 DONE
DetailsTim Frost
Application received  11/7/2018 DONE
Application submitted via PDS Online on Nov 7 2018 11:32AM