Permit Information
Permit NumberBLD18-02281
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 8853 W FAIRVIEW AVE
Project NameLithia Ford of Boise
Customer Number 
ePlanReviewYes
Description
(LITHIA FORD OF BOISE) Permit for the construction of a 1,536 sq. ft. addition to an existing 83,449 sq. ft. building with work to include general site work and the construction of the new building housing three vehicle service bays. Minor work will also occur in the existing building including a new high/low drinking fountain along with misc. wall door and related interior finishes per the approved plans. This building is fully fire sprinklered for area increase. Any alterations to the sprinkler system will requrire a separate permit and shall commply with NFPA 13 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/16/20199/17/20199/17/2019PPASS
DetailsMike Jordan
Call ahead // David Phone #: ###-####. Ok for perm occ.
FIRE-Final Inspection9/16/20199/17/20199/17/2019APASS
DetailsMike Jordan
Call ahead // David Phone #: ###-####. All issues have been reolved.
FIRE-Final Inspection7/22/20197/23/20197/24/2019AFAIL
DetailsTroy Cobbley
Provide single action hardware on the two store front doors as discussed. Fire alarm has been addressed.

Mark Phone #: ###-####
BLD-Final7/22/20197/23/20197/23/2019PNR
DetailsMike Jordan
Mark Phone #: ###-####. Issues with door hardware. Waiting for plan review. Will need to reschedule.
FIRE-Final Inspection6/17/20196/17/20196/17/2019PFAIL
DetailsTroy Cobbley
Provide fire alarm modifications for the required manual pull station at the new door, provide single action hardware on the two new store front doors as discussed.

Mark Phone #: ###-####
BLD-Final6/17/20196/18/20196/17/2019ACANC
DetailsMike Jordan
Mark Phone #: ###-####
BLD-Final2/7/20192/7/20192/7/2019PPART
DetailsMike Jordan
Julian Phone #: ###-####. Ok for temp occ. to use the new sevice/lube addition. Still some storefront work and plan mod for the deletion of the storage room.
FIRE-Final Inspection2/6/20192/7/20192/7/2019APART
DetailsTroy Cobbley
Life safety passed for new oil change building. Relocated fire hydrant is approved but requires a plan mod prior to a final life safety sign off on the scope of work.

julian Phone #: ###-####
BLD-Conference2/1/20192/4/20192/5/2019ADONE
DetailsMike Jordan
Julian Phone #: ###-####
FIRE-Final Inspection1/24/20191/28/20191/28/2019AFAIL
DetailsTroy Cobbley
Inspection was just for the shop area since other work is not complete. To allow use of the shop area the relocated fire hydrant needs tto be approved by plan review, the existing overhead door needs to be removed as per plan for our exit path and the walls the dealer wants to keep shown on a revised building plan, also on the path of egress the thumbturn deadbolt needs to be removed at the exterior exit door and the exit sign over this same door repaired. In the other areas shown to be modified the Storage Room was not built which will need to be addressed on modified approved plans.

Juilan Phone #: ###-####
BLD-Foundation11/16/201811/16/201811/16/2018PPART
DetailsJim Sly
cmu grout at 1 (mti) // tony Phone #: ###-####
ok pending MTI special inspection, tests and approvals.
BLD-Concrete11/12/201811/13/201811/13/2018PDEFR
DetailsMike Jordan
Requesting CMU re- bar ; grout inspection, grout is scheduled for 1;30. MTI will also being doing special inspections.
, Thank you Tony. Phone #: ###-#### Inspection requested via web by Tony Inserra
BLD-Foundation10/18/201810/19/201810/19/2018PPEND
DetailsDave Hannah
pouring at 2pm- Tony Phone #: ###-#### ok after spec. sign off
BLD-Footing10/15/201810/16/201810/16/2018PPASS
DetailsMike Jordan
concrete 130 // Tony Phone #: ###-####