Information based on query as of Sunday, April 28, 2024.
Permit Information
Permit NumberBLD18-04519
StatusIssued
Name WRIGHT BROTHERS THE BLDG CO EAGLE
Site Address 974 N MAPLE GROVE RD
Project NameRosewood Apartments Bldg 10
Customer Number 
ePlanReviewYes
Description
(ROSEWOOD APARTMENTS) (BUILDING #10) //08/01/19 PLAN MOD TO UTILITY LINE LOCATIONS AND LANDSCAPE PLANS. JAR// Permit for the construction of a new 15,774 sq ft, 3-story, 12 unit apartment building (identified as Type VI on plans). Work to include general site work and the construction of the new building per the approved plans. Special inspections required per attached Form 310. Carports to be constructed under separate building permit. All buildings are to be fully fire sprinklered with an NFPA 13-R system as required for residential occupancy and story increase. Exterior decks and breezeways to be protected. **JAR**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Framing/Rough-in4/29/20204/30/20204/30/2020APASS
DetailsMike Jordan
Ceiling drops for cover, Building 10 (12 units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Framing/Rough-in4/29/20204/29/20204/29/2020ANR
DetailsMike Jordan
Ceiling drops for cover in Building 10 (12 units), late as possible this morning. Phone #: ###-#### Inspection requested via web by Bob Goodwin. Stiil needs mech. rough in inspection. electrical rough in inspection has failed for all units.
BLD-Framing/Rough-in4/27/20204/28/20204/28/2020PNR
DetailsMike Jordan
Ceiling drops framing inspection for cover, Building 10 (12 Units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Energy code compliance4/13/20204/15/20204/15/2020APASS
DetailsTell Riley
Building 10 Insulation, Vapor Barrier ; RC Channel for cover Phone #: ###-#### Inspection requested via web by Bob Goodwin
BLD-Energy code compliance4/13/20204/14/20204/13/2020ACANC
DetailsMike Jordan
Building 10 Insulation, Vapor Barrier & RC Channel for cover Phone #: ###-#### >> Inspection requested via web by Bob Goodwin Inspection cancelled from web by: Bob Goodwin
BLD-Framing/Rough-in4/10/20204/13/20204/13/2020APASS
DetailsMike Jordan
Building 10 Framing Inspection, C3 truss bearing point truss-manufacturer "No Repair Needed", drawing confirmation. Phone #: ###-#### Inspection requested via web by Bob Goodwin. Per the truss engineer, no repair is required for the missed C3 truss bearing location.
BLD-Framing/Rough-in4/8/20204/9/20204/9/2020PFAIL
DetailsMike Jordan
Building 10 Energy Seal, Fire Caulking ; Framing for Cover Phone #: ###-#### Inspection requested via web by Bob Goodwin. Complete fire caulking, fireblock fur out walls. Provide approved fix for missed bearing points on C3 trusses.
BLD-Framing/Rough-in2/26/20202/27/20202/27/2020ACANC
DetailsMike Jordan
Re-inspect shear Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Wall Bracing2/27/20202/27/20202/27/2020APASS
DetailsMike Jordan
Re-inspect shear Phone #: ###-#### Inspection requested via web by Kris Linnell. Exterior shear only.
BLD-Framing/Rough-in2/26/20202/26/20202/26/2020PNR
DetailsMike Jordan
Shear re-inspection Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Framing/Rough-in2/25/20202/25/20202/25/2020PFAIL
DetailsMike Jordan
Inspection on Exterior shear Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Framing/Rough-in2/20/20202/21/20202/21/2020APART
DetailsMike Jordan
Exterior Shear and Wall Framing on East Exterior Walls for Plumbing wall pre-rock. Phone #: ###-#### Inspection requested via web by Kris Linnell. Ok to pre rock at tubs only.
BLD-Concrete10/9/201910/10/201910/13/2019PPASS
DetailsDave Hannah
Building 10 Thickend footing and slab reinforcement inspeciton Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Energy code compliance9/20/20199/23/20199/23/2019PPASS
DetailsMike Jordan
Stem Wall insulation Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Foundation9/17/20199/18/20199/18/2019APASS
DetailsMike Jordan
Stem Walls for Building 10. Pour scheduled for 2P.M. Phone #: ###-#### Inspection requested via web by Kris Linnell
BLD-Footing9/6/20199/9/20199/9/2019APART
DetailsMike Jordan
Rebar inspection for footings. Pour is scheduled for 1130 Phone #: ###-#### Inspection requested via web by Kris Linnell. Work in progress on installing the remaing verts. Ok to place concrete pending special inspection.
BLD-Footing9/5/20199/6/20199/6/2019PCANC
DetailsMike Jordan
Chris Phone #: ###-#### Inspection cancelled from web by: Kris Linnell