BLD-Framing/Rough-in | 4/29/2020 | 4/30/2020 | 4/30/2020 | A | PASS |
Mike Jordan
|
|
|
Ceiling drops for cover, Building 10 (12 units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Framing/Rough-in | 4/29/2020 | 4/29/2020 | 4/29/2020 | A | NR |
Mike Jordan
|
|
|
Ceiling drops for cover in Building 10 (12 units), late as possible this morning. Phone #: ###-#### Inspection requested via web by Bob Goodwin. Stiil needs mech. rough in inspection. electrical rough in inspection has failed for all units.
|
BLD-Framing/Rough-in | 4/27/2020 | 4/28/2020 | 4/28/2020 | P | NR |
Mike Jordan
|
|
|
Ceiling drops framing inspection for cover, Building 10 (12 Units). Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Energy code compliance | 4/13/2020 | 4/15/2020 | 4/15/2020 | A | PASS |
Tell Riley
|
|
|
Building 10 Insulation, Vapor Barrier ; RC Channel for cover Phone #: ###-#### Inspection requested via web by Bob Goodwin
|
BLD-Energy code compliance | 4/13/2020 | 4/14/2020 | 4/13/2020 | A | CANC |
Mike Jordan
|
|
|
Building 10 Insulation, Vapor Barrier & RC Channel for cover Phone #: ###-#### >> Inspection requested via web by Bob Goodwin Inspection cancelled from web by: Bob Goodwin
|
BLD-Framing/Rough-in | 4/10/2020 | 4/13/2020 | 4/13/2020 | A | PASS |
Mike Jordan
|
|
|
Building 10 Framing Inspection, C3 truss bearing point truss-manufacturer "No Repair Needed", drawing confirmation. Phone #: ###-#### Inspection requested via web by Bob Goodwin. Per the truss engineer, no repair is required for the missed C3 truss bearing location.
|
BLD-Framing/Rough-in | 4/8/2020 | 4/9/2020 | 4/9/2020 | P | FAIL |
Mike Jordan
|
|
|
Building 10 Energy Seal, Fire Caulking ; Framing for Cover Phone #: ###-#### Inspection requested via web by Bob Goodwin. Complete fire caulking, fireblock fur out walls. Provide approved fix for missed bearing points on C3 trusses.
|
BLD-Framing/Rough-in | 2/26/2020 | 2/27/2020 | 2/27/2020 | A | CANC |
Mike Jordan
|
|
|
Re-inspect shear Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Wall Bracing | 2/27/2020 | 2/27/2020 | 2/27/2020 | A | PASS |
Mike Jordan
|
|
|
Re-inspect shear Phone #: ###-#### Inspection requested via web by Kris Linnell. Exterior shear only.
|
BLD-Framing/Rough-in | 2/26/2020 | 2/26/2020 | 2/26/2020 | P | NR |
Mike Jordan
|
|
|
Shear re-inspection Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Framing/Rough-in | 2/25/2020 | 2/25/2020 | 2/25/2020 | P | FAIL |
Mike Jordan
|
|
|
Inspection on Exterior shear Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Framing/Rough-in | 2/20/2020 | 2/21/2020 | 2/21/2020 | A | PART |
Mike Jordan
|
|
|
Exterior Shear and Wall Framing on East Exterior Walls for Plumbing wall pre-rock. Phone #: ###-#### Inspection requested via web by Kris Linnell. Ok to pre rock at tubs only.
|
BLD-Concrete | 10/9/2019 | 10/10/2019 | 10/13/2019 | P | PASS |
Dave Hannah
|
|
|
Building 10 Thickend footing and slab reinforcement inspeciton Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Energy code compliance | 9/20/2019 | 9/23/2019 | 9/23/2019 | P | PASS |
Mike Jordan
|
|
|
Stem Wall insulation Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Foundation | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PASS |
Mike Jordan
|
|
|
Stem Walls for Building 10. Pour scheduled for 2P.M. Phone #: ###-#### Inspection requested via web by Kris Linnell
|
BLD-Footing | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | PART |
Mike Jordan
|
|
|
Rebar inspection for footings. Pour is scheduled for 1130 Phone #: ###-#### Inspection requested via web by Kris Linnell. Work in progress on installing the remaing verts. Ok to place concrete pending special inspection.
|
BLD-Footing | 9/5/2019 | 9/6/2019 | 9/6/2019 | P | CANC |
Mike Jordan
|
|
|
Chris Phone #: ###-#### Inspection cancelled from web by: Kris Linnell
|