Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberBLD19-00362
StatusIssued
Name KREIZENBECK CONSTRUCTORS
Site Address 3500 N CABARTON LN
Project NameMountain View Elementary
Customer Number 
ePlanReviewYes
Description
(MOUNTAIN VIEW ELEMENTARY) (Project Management - Ron Hill) Permit for the construction of a new 46,980 sq. ft. elementary school to replace the existing 32,175 sq ft school that is to be demolished when the new school is completed. Work will include general site work, utilities and construction of the new building per the approved plans, attached engineering and any comments. Special inspections required per attached Form 310. A fire wall between the north portion(cafeteria/gym) and the south portion (classrooms/admin) is used to create two buildings for building area. This is a fully fire sprinklered and alarmed building for E fire area over 12,000 sq. ft. and building area increase. Mechanical Commissioning preliminary report required for mechanical occupancy. *JAR*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection8/12/20208/13/20208/12/2020APASS
DetailsTroy Cobbley
Life safety passed.

Troy *screened Phone #: ###-####
BLD-Final7/27/20207/28/20207/28/2020APART
DetailsTell Riley
Screened- Troy Phone #: ###-####/temp occupancy ok, see entry from zoning, see email to Troy for public works--other signatures are on card// will need final special inspection report prior to permanant occupancy//
BLD-Final7/8/20207/10/20207/10/2020PPART
DetailsTell Riley
Troy *screened* Phone #: ###-####//Temp ok to start setup in offices and classrooms//other trades and fire life safety has passed//let Troy know that ACHD, CDHD, zoning and Public works temps will be needed//an updated temp occupancy will be needed prior to full occupancy of the school//
FIRE-Final Inspection7/8/20207/10/20207/10/2020APART
DetailsTroy Cobbley
Temp for life safety until the new parking lot on norht side has been built/verified. All of the new school life safety items appear ok.

Troy *screened* Phone #: ###-####
FIRE-Conference4/28/20204/28/20204/28/2020PDONE
DetailsTroy Cobbley
The general contractor and I went over the life safety notes.
BLD-Ceiling Grid Inspection2/13/20202/14/20202/14/2020APART
DetailsTell Riley
Troy Phone #: ###-####//cafeteria area only//
BLD-Framing/Rough-in1/31/20201/31/20201/31/2020PPART
DetailsBrandon Shaw
Kitchen bathroom, ceiling framing...
OK to cover...
BLD-Conference1/15/20201/16/20201/16/2020ADONE
DetailsTell Riley
BLD-Ceiling Grid Inspection1/14/20201/14/20201/14/2020PPART
DetailsTell Riley
Troy Phone #: ###-####//area C classrooms ok to cover//

Note: fire wall will need to be inspected for penetrations and fire caulking in the end rooms and hallway//
BLD-Ceiling Grid Inspection1/6/20201/7/20201/7/2020APASS
DetailsTell Riley
Troy Phone #: ###-####//remaining portions of area A and B//hallways in area A,B and C//
BLD-Ceiling Grid Inspection12/20/201912/20/201912/20/2019APART
DetailsTell Riley
Area A grids ok, where rough ins are approved//
BLD-Wall cover12/19/201912/20/201912/20/2019APART
DetailsTell Riley
Troy Phone #: ###-####//wall framing for cafeteria ok minus short wall near oven area//
BLD-Other12/10/201912/11/201912/11/2019APASS
DetailsTell Riley
TROY- inspection for hardlid Phone #: ###-####//area c hardlids--ok add fire caulk to small conduit//area d wall cover ok in back of gym area--still need to see cafeteria//1 hour wall in electrical room was looked at and discussed for penetrations///
BLD-Ceiling Grid Inspection11/27/201912/2/201912/2/2019APART
DetailsTell Riley
Troy Phone #: ###-####//area B six classrooms ok//
BLD-Ceiling Grid Inspection11/21/201911/22/201911/22/2019APART
DetailsTell Riley
Troy Phone #: ###-####//walk through yesterday for school//discussed fire wall area and penetrations//hardlids area A ok to cover//no grid at this time//
BLD-Wall Bracing11/7/201911/8/201911/8/2019PPART
DetailsTell Riley
Troy Phone #: ###-####//add screws at bottom of shear panels as discussed--guys working on when I left//
BLD-Wall Bracing10/15/201910/16/201910/16/2019PPART
DetailsTell Riley
shear // Troy Phone #: ###-####//area d and part of c bolts and hold downs installed// shear nailing ok on areas that are complete//
BLD-Framing/Rough-in9/24/20199/24/20199/24/2019PPART
DetailsTell Riley
area A wall framing ok to cover//electrical and plumbing ok//covered under shear inspection for shear wall// Area C walk through-will need to add double studs under girder as discussed//
BLD-Wall Bracing9/24/20199/24/20199/24/2019PPART
DetailsTell Riley
Troy Phone #: ###-####//area A wall bracing complete//all wall bracing is on interior side of wall//framing is being inspected with hold down and anchor inspections//
BLD-Other9/20/20199/20/20199/20/2019PPASS
DetailsTell Riley
Troy- sheeting inspection call in at 11:28 am Phone #: ###-####//roof sheathing last area ok to cover with roofing//straps installed and nailed//
BLD-Framing/Rough-in9/18/20199/19/20199/19/2019APART
DetailsTell Riley
roof sheathing- troy Phone #: ###-####//last of the roof sheathing--ok to cover//call to check strap nailing near gym wall//
BLD-Wall Bracing9/13/20199/13/20199/13/2019PPART
DetailsTell Riley
hold down // Troy Phone #: ###-####//hold downs and anchor bolts for shear walls in area A and B--bolts ok and hold downs corrected// insulation visual inspection area B//ledger attachment per detail on gym//
BLD-Other9/11/20199/11/20199/11/2019APART
DetailsTell Riley
area B and portion of area A hold downs//add double stud to hold down in corner// fix two hold downs(saddles upside down)// will double check next inspection//
BLD-Other9/10/20199/11/20199/11/2019APART
DetailsTell Riley
roof // Troy Phone #: ###-####//area c roof nailing//need to adjust nail depth//corrected onsite ok to continue...///
BLD-Wall cover9/5/20199/5/20199/5/2019PPART
DetailsTell Riley
troy Phone #: ###-####//area B partial wall cover for insulation and shear walls//
BLD-Other9/3/20199/4/20199/4/2019APART
DetailsTell Riley
Troy-roof sheating Phone #: ###-####//roof decking ok per plans//
BLD-Other8/23/20198/26/20198/26/2019APART
DetailsTell Riley
roof seathing // Troy Phone #: ###-####//nailing ok on deck//
BLD-Foundation8/19/20198/20/20198/20/2019APASS
DetailsTell Riley
Troy Phone #: ###-####//pier stems// ok to pour pending specials....//
BLD-Foundation8/15/20198/16/20198/16/2019APART
DetailsTell Riley
Troy Phone #: ###-####//pier footings for awnings//ok to pour pending specials//
BLD-Foundation8/9/20198/12/20198/12/2019PPASS
DetailsTell Riley
TROY- REBAR INSPECTION Phone #: ###-####//area d slab// final slab pour//pending all specials//
BLD-Other8/6/20198/7/20198/7/2019PPART
DetailsTell Riley
roof sheeting // Jeff Phone #: ###-####//area b roof sheathing//
BLD-Footing8/6/20198/7/20198/7/2019PPART
DetailsTell Riley
rebar and vapor barrier concrete // Jeff Phone #: ###-####//slab vapor barrier ok pending specials//
BLD-Foundation7/30/20197/30/20197/30/2019PPART
DetailsTell Riley
Troy Phone #: ###-####//final foundation inspection on building//ok pending specials....///
BLD-Concrete7/25/20197/26/20197/26/2019PPART
DetailsTell Riley
tROY Phone #: ###-####//slab vapor barrier//middle section of building//ok//pending specials//
BLD-Footing7/22/20197/23/20197/23/2019PPART
DetailsTell Riley
Troy Phone #: ###-####//area D footings//ok pending specials......////
BLD-Foundation7/18/20197/19/20197/19/2019APASS
DetailsTell Riley
TROY- foundation insalation inspection Phone #: ###-####//insulation ok//
BLD-Foundation7/16/20197/17/20197/17/2019APASS
DetailsBrandon Shaw
Work in progress...
Pending special inspection...
BLD-Other7/8/20197/9/20197/9/2019PPART
DetailsTell Riley
TROY- inspection for vapor barrier floor Phone #: ###-####//ok pending specials...////also looked at exterior footings//
BLD-Concrete7/1/20197/2/20197/2/2019PPART
DetailsTell Riley
Troy Phone #: ###-####//area A slab//vapor barrier installed//remesh installed//rebar ok//pendinng special inspections//
BLD-Footing6/28/20197/1/20197/1/2019APART
DetailsTell Riley
Troy Phone #: ###-####//foundation insulation//area B///
BLD-Other6/27/20196/27/20196/27/2019APART
DetailsTell Riley
CMU inspection ok pending specials// gym area//1st grout//
BLD-Foundation6/26/20196/27/20196/27/2019APART
DetailsTell Riley
Troy Phone #: ###-####//ok for foundation pending specials//area D//
BLD-Foundation6/19/20196/20/20196/20/2019APART
DetailsTell Riley
Troy Phone #: ###-####//area A foundation insulation//ok per plans//
BLD-Footing6/19/20196/20/20196/20/2019APART
DetailsTell Riley
Troy Phone #: ###-####//area b footings and rebar.//ok pending specials//
BLD-Foundation6/13/20196/14/20196/14/2019APART
DetailsTell Riley
stem wall // Troy Phone #: ###-####//walls ok on west side//pending special inspection ok to pour//
BLD-Footing6/7/20196/10/20196/10/2019APART
DetailsTell Riley
Troy Phone #: ###-####, west footings ok per plans, ok pending special inspections
BLD-Footing6/3/20196/4/20196/4/2019PPART
DetailsTony Young
Call ahead for directions // Troy Phone #: ###-####,, looked at NE interior footers,, approved pending special,, looked at north and east wall slab insulation, ok work in progress. NW foundation wall work in progress pending special inspection. look at current engineering plan for current rebar plans
BLD-Footing5/15/20195/17/20195/17/2019APART
DetailsJim Sly
call for directions // Troy Phone #: ###-####
Area D.....OK pending STRATA special inspection, tests and approvals.