BLD-Final | 3/19/2020 | 3/20/2020 | 3/20/2020 | A | PASS |
Mike Jordan
|
|
|
nate Phone #: ###-####. Occupant load sign posted and seating installed. Ok for perm occ.
|
FIRE-Final Inspection | 3/13/2020 | 3/13/2020 | 3/13/2020 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Phone #: ###-#### Inspection requested via web by Nate Carriveau
|
BLD-Final | 2/25/2020 | 2/26/2020 | 2/26/2020 | A | PART |
Mike Jordan
|
|
|
Temp Occupancy Phone #: ###-#### Inspection requested via web by Nate Carriveau. Ok for temp occ. Needs to post max of 40 occupant load sign in room 138 and have fixed seating installed.
|
FIRE-Final Inspection | 2/25/2020 | 2/25/2020 | 2/25/2020 | P | PART |
Troy Cobbley
|
|
|
A temporary for life safety is being given for 90 days. A final life safety can be given when the project related fire alarm permit is finaled.
Phone #: ###-#### Inspection requested via web by Nate Carriveau
|
FIRE-Final Inspection | 2/24/2020 | 2/24/2020 | 2/24/2020 | P | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when the project related fire alarm permit is finaled.
Phone #: ###-#### Inspection requested via web by Nate Carriveau
|
FIRE-Final Inspection | 2/21/2020 | 2/21/2020 | 2/21/2020 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire alarm permit finaled. Need the two exit signs modified as discussed. Need suite number posted. All other items appear ok. Phone #: ###-#### Inspection requested via web by Nate Carriveau
|
BLD-Ceiling Grid Inspection | 1/30/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Carriveau
|
BLD-Ceiling Grid Inspection | 1/29/2020 | 1/30/2020 | 1/30/2020 | A | PART |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Carriveau need mains supported max 8 inches both ends of mains/ ok to flood sm rooms and primtors ajsent to mains.
|
BLD-Ceiling Grid Inspection | 1/23/2020 | 1/24/2020 | 1/24/2020 | A | PASS |
Mike Jordan
|
|
|
West half of building Phone #: ###-#### Inspection requested via web by Nate Carriveau
|
BLD-Framing/Rough-in | 12/17/2019 | 12/18/2019 | 12/18/2019 | A | FAIL |
Mike Jordan
|
|
|
Soffit inspection to cover Phone #: ###-#### Inspection requested via web by Nate Carriveau. Soffits to be supported from rtop chord or pan decking, or provide engineering showing bottom chords of joist can support additional loads.
|
BLD-Framing/Rough-in | 12/12/2019 | 12/13/2019 | 12/13/2019 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Nate Carriveau. Remainder of interior steel stud framed walls ok.
|
BLD-Framing/Rough-in | 12/5/2019 | 12/6/2019 | 12/6/2019 | P | PASS |
Mike Jordan
|
|
|
Partial inspection for West side of building. Phone #: ###-#### Inspection requested via web by Nate Carriveau. Interior steel stud framed walls, west half only. No grid, hardlids or soffits at this time.
|