Final | 6/3/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Rock A. Hudson
|
|
|
Call Joey C. prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell Final ok
|
Final | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Call Joey Campbell prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell 110.22- Each roof top unit shall be identified as per which disconnecting means operates it. 314.20= Boxes that are not flush with combustible materials shall be extented to be flush. All receptacles in electrical room on all floors.
|
Final | 5/20/2019 | 5/21/2019 | 5/21/2019 | P | FAIL |
Rock A. Hudson
|
|
|
Call Joey C. prior to arrival Phone #: ###-#### Inspection requested via web by Scott Campbell 300.15- All wiring shall terminate in a box. Switch leg for accent LED tape light hanging at misc locations. 120 volt dampers not complete. 314.25- All boxes shall have covers. Misc found on level 1.
|
Electrical Rough-In | 5/14/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Rock A. Hudson
|
|
|
Exterior trenching and conduit on west and south sides of building. Call Joey C. prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell Areas noted underground rough in ok cover
|
Conference | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | DONE |
Rock A. Hudson
|
|
|
Request for consultation to meet requirements for building temporary occupancy. Phone #: ###-#### Inspection requested via web by Scott Campbell Discussed requirements for TCO of core and shell. All emergency lighting, interior and exterior egress lighting, gererator shall be operational and commissioning reports complete. All unfinished wiring shall terminate in a box.
|
Electrical Rough-In | 5/10/2019 | 5/13/2019 | 5/13/2019 | A | PASS |
Rock A. Hudson
|
|
|
3rd and 4th Floor Ceiling Inspection for cover. Phone #: ###-#### Inspection requested via web by Scott Campbell Levels 3 and 4 grid rough in ok cover
|
Electrical Rough-In | 4/29/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Rock A. Hudson
|
|
|
1st ; 2nd Floor Ceilings. Generator Grounding Electrode. Call Joey C. prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell Generator GES and level 1 and 2 corridor grid rough in ok cover
|
Electrical Rough-In | 4/25/2019 | 4/26/2019 | 4/26/2019 | A | PASS |
Rock A. Hudson
|
|
|
1st floor vestibules. Call Joey C, prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell HVAC to be installed after cover. Rough in ok cover.
|
Electrical Rough-In | 4/23/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Rock A. Hudson
|
|
|
Bank Canopy hardlid, two vestibule hardlid, 1st ceiling t-grid inspection. Call Joey C prior to arrival Phone #: ###-#### Inspection requested via web by Scott Campbell Vestibules and grid not ready, Bank canopy hard lid rough in ok cover
|
Electrical Rough-In | 4/22/2019 | 4/22/2019 | 4/22/2019 | P | PART |
Rock A. Hudson
|
|
|
Two exterior canopies and 5th Floor elevator lobby. Call Joey C. prior to arrival. If no answer, call Ben M. at ###-####. Phone #: ###-#### Inspection requested via web by Scott Campbell 300.11- Ceiling support system shall not support raceways or cable unless manufacturers instructions state system has been tested for support of such cables and raceways. Contractor is checking instructions. Level 5 elevator lobby wall and south lobby hardlid rough in ok cover
|
Electrical Rough-In | 4/16/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Rock A. Hudson
|
|
|
1st through 4th floor elevator lobby wall inspection. Call Joey Campbell prior to arrival. If no answer call Ben MacDonagh at ###-####. Phone #: ###-#### Inspection requested via web by Scott Campbell Verified main bonding jumper installed at generator. Elevator lobby walls levels 1 thru 4 rough in ok cover
|
Electrical Rough-In | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | NH |
Rock A. Hudson
|
|
|
1st through 4th Floor elevator lobby wall rough-in. Call Joey Campbell prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell Called twice unable to leave message, mail obx full. Recall when available.
|
Permanent Service | 4/10/2019 | 4/12/2019 | 4/12/2019 | P | CANC |
Rock A. Hudson
|
|
|
Call Joey Campbell prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell Needed rough in inspection.
|
Electrical Rough-In | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Rock A. Hudson
|
|
|
Call Joey Campbell prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell Discussed the work depth for HVAC unit on roof disconnecting means at 480 volt. As per 110.26(A)(1) a minimum depth of 3'6" shall be present. Disconnects will have to be moved to another location. Energize sub gear on all floors rough in ok.
|
Permanent Service | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PASS |
Rock A. Hudson
|
|
|
Joey ###-#### p/s u/g n ok
|
Permanent Service | 4/1/2019 | 4/8/2019 | 4/8/2019 | A | NR |
Rock A. Hudson
|
|
|
Joey Phone #: ###-#### Field testing being performed at time of inspection as per 230.95(C). 110.24- Available fault current shall be posted prior to permanent service inspection
|
Electrical Rough-In | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PASS |
Rock A. Hudson
|
|
|
Joey Phone #: ###-#### Bollard bases east end and pole bases north side rough in ok cover
|
Electrical Rough-In | 3/21/2019 | 3/21/2019 | 3/21/2019 | P | PASS |
Rock A. Hudson
|
|
|
Underground conduit install rough-in for cover. Call Joey Campbell prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell N.E. 3 post bases and underground rough in ok cover
|
Electrical Rough-In | 3/5/2019 | 3/6/2019 | 3/6/2019 | P | PASS |
Rock A. Hudson
|
|
|
Call Joey Campbell prior to arrival. Fifth floor hardlids. Phone #: ###-#### Inspection requested via web by Scott Campbell Level 5 hardlids in bathrooms and elevator lobby rough in ok cover
|
Electrical Rough-In | 2/22/2019 | 2/25/2019 | 2/25/2019 | P | PASS |
Rock A. Hudson
|
|
|
Call Joey C prior to arrival. North and South Stairwell hardlid inspection Phone #: ###-#### Inspection requested via web by Scott Campbell Level 1 north and south stair hardlid as noted on contractor print rough in ok cover
|
Electrical Rough-In | 2/12/2019 | 2/14/2019 | 2/14/2019 | P | PASS |
Rock A. Hudson
|
|
|
Call Joey C prior to arrival. Rough in for hardlids floors 2-4. Phone #: ###-#### Inspection requested via web by Scott Campbell Levels 2,3,4 elevator lobbies and tape lighting wiring and level 5 tape wiring only as noted on contractor print rough in ok cover
|
Electrical Rough-In | 2/6/2019 | 2/7/2019 | 2/7/2019 | P | PASS |
Rock A. Hudson
|
|
|
3rd and 4th floor restroom ceiling rough-in. 5th floor wall rough-in. Call Joey Campbell prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell Areas as noted and marked on contractor print rough in ok cover.
|
Electrical Rough-In | 1/29/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Rock A. Hudson
|
|
|
Rough in for North stairwell 2nd floor. Phone #: ###-#### Inspection requested via web by Scott Campbell All of north stair walls and level 2 bathroom hardlids as noted on contractor print rough in ok cover
|
Electrical Rough-In | 1/22/2019 | 1/23/2019 | 1/23/2019 | A | PASS |
Rock A. Hudson
|
|
|
Call Joey C at 208 ###-#### prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell South stairway walls complete 1 thru 5 rough in ok cover
|
Electrical Rough-In | 1/21/2019 | 1/22/2019 | 1/22/2019 | A | CANC |
James Ady
|
|
|
Call Joey C at ###-#### prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell will recall for AM inspection
|
Electrical Rough-In | 1/14/2019 | 1/16/2019 | 1/16/2019 | P | PASS |
Rock A. Hudson
|
|
|
1st Floor hardlid areas. Call Joey C. prior to arrival. ###-####. Phone #: ###-#### Inspection requested via web by Scott Campbell Level 1 elevator lobby, clouds, bathrooms hardlids and south stair levels1 to 2 1/2 wall rough in ok cover
|
Electrical Rough-In | 1/14/2019 | 1/17/2019 | 1/14/2019 | P | CANC |
Rock A. Hudson
|
|
|
1st Floor hardlid areas. Call Joey C. prior to arrival. ###-####. Phone #: ###-#### >> Inspection requested via web by Scott Campbell Inspection cancelled from web by: Scott Campbell
|
Conference | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | PASS |
Rock A. Hudson
|
|
|
Discussed with Ben temporary power requirements for job site. Having issues with tripping circuit taking out multiple floors. As long as temporary power complies with 590.6(B)(1)(2)(3) ok to make changes to reduce tripping issues.
|
Electrical Rough-In | 1/7/2019 | 1/9/2019 | 1/9/2019 | A | PASS |
Rock A. Hudson
|
|
|
WALL ROUGH-IN INSPECTION FOR FIRST AND FOURTH FLOOR. CALL JOEY C AT ###-#### PRIOR TO ARRIVAL. Phone #: ###-#### Inspection requested via web by Scott Campbell Informed seperate electrical permit required for elevators. Level 1 mail room, demizing wall, east exterior wall only. No stairway walls. Level 4 bathrooms and corridor as noted on contractor print wall rough in ok cover
|
Electrical Rough-In | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Rock A. Hudson
|
|
|
Contractor called and asked if ok to 1-side electrical rooms only. OK to cover 1 side of 2 electrical rooms only rough in ok cover
|
Electrical Rough-In | 11/19/2018 | 11/20/2018 | 11/20/2018 | A | PASS |
Rock A. Hudson
|
|
|
Wall rough-in inspection on floors 2 and 3. Contact is Joey Campbell Phone #: ###-#### Inspection requested via web by Scott Campbell Walls- level 1 from center to west exterior lighting, level 2 corridors, bathrooms, electrical rm, level 3 bathrooms and electrical room. All marked and dated in blue on contractor print rough in ok cover
|
Electrical Rough-In | 10/31/2018 | 11/2/2018 | 11/2/2018 | A | PASS |
Rock A. Hudson
|
|
|
Please call Joey Campbell at ###-#### prior to arrival. 1st floor wall inspection. Phone #: ###-#### Inspection requested via web by Scott Campbell Fire riser room, bathrooms, corridors and noted in orange on contractor print wall rough in ok cover
|
Temporary Service | 8/8/2018 | 8/8/2018 | 8/8/2018 | P | CANC |
Rock A. Hudson
|
|
|
Please call Joey Campbell @ ###-#### 30 minutes prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell needed temp service. seperate permit required.
|
Electrical Rough-In | 8/3/2018 | 8/6/2018 | 8/6/2018 | A | PASS |
Rock A. Hudson
|
|
|
If possible, please see if this inspection can be the first inspection of the day. Call Joey Campbell at ###-#### prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell Service entrance conduits rough in ok cover
|
Electrical Rough-In | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Rock A. Hudson
|
|
|
Joey Phone #: ###-#### Note: If an inspection is needed time shall be provided to complete and inspect before cover. Concrete encased electrode rough in ok cover
|
Electrical Rough-In | 7/18/2018 | 7/23/2018 | 7/23/2018 | A | PASS |
Rock A. Hudson
|
|
|
Please call Joey Campbell @ ###-#### 20 minutes prior to arrival. Phone #: ###-#### Inspection requested via web by Scott Campbell Underslab conduits to east of electrical room rough in ok cover
|