Permit Information
Permit NumberELE19-03017
StatusIssued
Name POWER PLUS INC
Site Address 3434 N BOGUS BASIN RD
Project Name 
Customer Number1572
ePlanReviewNo
Description
Alteration: elec.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final7/10/20207/10/20207/10/2020APART
DetailsMark Moncarr
exterior building Phone #: ###-#### Inspection requested via web by Debby Pierce Partial final. Waiting for possible commisioning report. General said there was only 1 for mechanical, is checking for the electrical side.
Final7/6/20207/6/20207/6/2020PPART
DetailsMark Moncarr
area c final Phone #: ###-#### Inspection requested via web by Debby Pierce Partial for cafeteria, and a couple of classrooms. Discussed moving line sets and gas line up so they are out of working clearance zone for panel in mezzanine.
Final6/17/20206/17/20206/17/2020APART
DetailsRock A. Hudson
FINAL MEZZANINE AND ELECTRICAL ROOM Phone #: ###-#### Inspection requested via web by Debby Pierce
No heat tape installed yet, did not test EPD breakers.
110.26- Work space height shall be provided for area A Mezz. Panel M1.Line sets at 6' 28" in front of panel, 6'6" required,
TCO for areas noted ok
Final6/10/20206/11/20206/10/2020ACANC
DetailsMark Moncarr
final main electrical room and mezzanines Phone #: ###-#### >> Inspection requested via web by Debby Pierce Inspection cancelled from web by: Debby Pierce
Final6/10/20206/10/20206/10/2020PPART
DetailsMark Moncarr
final area B Phone #: ###-#### Inspection requested via web by Debby Pierce Area B classrooms
Final6/9/20206/9/20206/9/2020PPART
DetailsMark Moncarr
PARTIAL FINAL AREA A Phone #: ###-#### Inspection requested via web by Debby Pierce Area A
Electrical Rough-In6/3/20206/3/20206/3/2020PPASS
DetailsMark Moncarr
kitchen ceiling Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover kitchen ceiling
Electrical Rough-In5/21/20205/21/20205/21/2020PPASS
DetailsMark Moncarr
front entry rough in Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover ceiling inside main entrance on E side.
Electrical Rough-In4/21/20204/21/20204/21/2020PPASS
DetailsMark Moncarr
ceiling inspection area c Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover area listed
Electrical Rough-In3/31/20203/31/20203/31/2020PPASS
DetailsRock A. Hudson
Ceiling inspection please. ###-####
Area A corridor and classroom grid rough in ok cover.
Permanent Service3/5/20203/9/20203/9/2020APASS
DetailsMark Moncarr
service Phone #: ###-#### Inspection requested via web by Debby Pierce Equiptment tested, service was energized over the weekend. AFC present
Electrical Rough-In3/5/20203/5/20203/5/2020PPASS
DetailsMark Moncarr
ceiling inspection south wing.
consult on disconnect locations roof Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover ceilings S side classrooms. Disconnects for units on rooftop clearance ok.
Electrical Rough-In2/25/20202/25/20202/25/2020PPASS
DetailsMark Moncarr
GYM CEILING Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover gym ceiling
Electrical Rough-In2/3/20202/4/20202/4/2020APASS
DetailsMark Moncarr
kitchen Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover kitch walls.
Electrical Rough-In1/14/20201/15/20201/15/2020APASS
DetailsMark Moncarr
wall and hard lid rough in west wing. excludes kitchen and gym. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover areas listed
Electrical Rough-In12/24/201912/30/201912/30/2019APASS
DetailsMark Moncarr
area a north wing rough in. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover Area A north side.
Electrical Rough-In12/2/201912/3/201912/3/2019APASS
DetailsMark Moncarr
south wing wall rough in
exterior soffit rough in.
south wing hard lid rough in Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover areas listed. Fire hats installed on exterior soffits.
Rough-In Permanent Service10/22/201910/23/201910/23/2019APASS
DetailsMark Moncarr
UNDERGROUND AT IDAHO POWER TRANSFORMER Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover conduits from trans to building on E side of school.
Electrical Rough-In10/8/201910/8/201910/8/2019PPASS
DetailsMark Moncarr
electrical room underground rough in. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover grd work elec room on E bldg W side.
Electrical Rough-In9/11/20199/12/20199/12/2019APASS
DetailsMark Moncarr
branch underground area A Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover conduits from elec room to misc locations for classrooms.
Electrical Rough-In8/26/20198/26/20198/26/2019PPASS
DetailsMark Moncarr
In Slab, underground, Area B. - Steve Hook is contact at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover conduit in area listed.
Electrical Rough-In8/19/20198/20/20198/20/2019APASS
DetailsMark Moncarr
underground gym and UFER Phone #: ###-#### Inspection requested via web by Debby Pierce Ok cover grd work for gym, and 3/0 ufer.