Permit Information
Permit NumberESC16-01370
StatusFinaled
Name JAMES LARKIN
Site Address 3684 W QUAIL HOLLOW CT
Project Name 
Customer Number 
ePlanReviewNo
Description
BMPs include perimeter sediment control around the downhill side and back of lot, construction entrance, washout containment, and permit signage. BMP installation and site preparation inspection required prior to excavation, call 384-3802 or 794-8996
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final10/5/201710/11/201710/12/2017PPASS
DetailsMichael Zawacki
House is complete. Landscaping finished, used zero scape and shrubs. DIs removed from down hill storm drains.
Site Final10/2/201710/3/201710/5/2017PCANC
DetailsAndy J. Long
Site Final9/26/20179/27/201710/2/2017PCANC
DetailsAndy J. Long
General Inspection9/25/20179/25/20179/26/2017 CANC
DetailsAndy J. Long
General Inspection9/8/20179/8/20179/8/2017 CANC
DetailsAndy J. Long
General Inspection8/24/20178/24/20178/24/2017 CANC
DetailsAndy J. Long
General Inspection8/9/20178/9/20178/11/2017 CANC
DetailsAndy J. Long
General Inspection7/20/20177/20/20177/20/2017PPASS
DetailsAndy J. Long
Near completion. Some final landscaping and clean up is in progress. RP Jim on site, stated he will remove DI bag and call in Site Final within the next 2 weeks. No corrections requested.
General Inspection6/30/20176/30/20176/30/2017PPASS
DetailsAndy J. Long
WIP. No trackout or discharges from site. Not yet landscaped. Will need to remove the temp. DI sediment bag 2 blocks downhill in order to get ESC final.
General Inspection6/8/20176/8/20176/8/2017PPASS
DetailsMelissa Jannusch
WIP on interior and exterior. Trash is contined. No trackout. No corrections issued.
General Inspection5/9/20175/9/20175/9/2017PPASS
DetailsAndy J. Long
WIP on exterior finish. Permit sign posted, trash contained. No trackout/discharges observed. Receiving MS4 has had new inlet protection installed as requested. Approved.
General Inspection4/11/20174/11/20174/11/2017PPEND
DetailsAndy J. Long
Site trash was cleaned up, some remaining on back slope within the silt fence area and some below. Sidwalk & trackout swept. Permit sign is on the construction company sign. NO discharges or new violations observed. No activity at time of inspection.

No action on the DI bag, other site by Shadow Mtn is supposed to remove the DI bag. Once gone, Paradigm may supply a DI bag until this project is stabilized/landscaped.
General Inspection4/5/20174/5/20174/5/2017PFAIL
DetailsAndy J. Long
Corrections needed:

- pick up loose trash blowing around site.
- repost ESC permit sign
- sweep sidewalk and driveway apron.
- work with adjacent site to clean out the DI bag down gradient from the two construction sites.

Verbal request given to Jim with Paradigm
General Inspection3/1/20173/1/20173/1/2017AFAIL
DetailsAndy J. Long
No discharges or significant uncontained trash. Rear hillside perimeter BMP installed and hillside vegetation preserved.

Inspection Failed, verbal correction request:

Need to sweep up trackout and accumulated sediment on sidewalk and at driveway access. Street sweeper or manual.
Recommend to install some perimeter wattles along sidewalk to restrict access

General Inspection12/15/201612/16/201612/21/2016PCANC
DetailsAndy J. Long
General Inspection12/5/201612/9/201612/15/2016ACANC
DetailsAndy J. Long
Follow up inspection to check on clean up of dried concrete slurry around storm drain

rescheduled
General Inspection11/17/201612/1/201612/5/2016PFAIL
DetailsAndy J. Long
BMPs installed and permit sign is posted.

Verbal Correction Request to Brian w/ Paradigm:
- clean up dried slurry accumulated around down gradient inlet. Concrete washout pit was not utilized for all chute cleanings. Small exisiting washout is not lined and should be cleaned up and removed from the adjacent lot.

Follow up inspection scheduled 12/9
Site Preparation11/17/201611/17/201611/17/2016APASS
DetailsAndy J. Long
Silt fence installed on back of lot, permit sign posted. Down gradient storm drain has sediment filter bag installed. Will install wattles as needed along edge of pavement once foundation excavation is complete. Approved for construction.