Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberESC16-01706
StatusFinaled
Name NATE BOHACHEK
Site Address 5390 W IRVING ST
Project NameMark Guho Irving Street Wareho
Customer Number 
ePlanReviewNo
Description
Site development for a future warehouse and office development including grubbing and clearing, grading and utility placement, concrete and parking lot work, and install irrigation and landscaping. Site to apply for LEW for CGP coverage.Site preparation inspection required, call 608-7070 to schedule
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/12/20194/25/20194/24/2019PPASS
DetailsMichael Zawacki
General Inspection4/12/20194/12/20194/12/2019 PASS
DetailsAndy J. Long
Project complete. Checking on vegetation along side ditch along the frontage. BLD has been finaled.
General Inspection2/25/20192/25/20192/26/2019 CANC
DetailsMichael Zawacki
General Inspection1/8/20191/8/20191/8/2019 PASS
DetailsAndy J. Long
Warehouse now complete. Parking lot paved and frontage along Irving has been sodded. Large stockpile of dirt and disturbed area are still onsite. Will continue to monitor. No trackout or discharges occuring.
General Inspection11/23/201811/23/201811/23/2018 PASS
DetailsAndy J. Long
WIP on site improvements and interior work on warehouse. Parking lot paved, frontage sod and landscaping has been installed. Large stockpile onsite, may require stabilization if to remain on site. No corrections requested.
General Inspection10/8/201810/8/201810/9/2018 PASS
DetailsAndy J. Long
No trackout or discharges from site. Parking lot paved, frontage landscaping has been initiated.
General Inspection8/21/20188/22/20188/22/2018APART
DetailsAndy J. Long
No discharges, fugitive dust or uncontained trash. RP on site. On site storm water facililities are installed. Temporary office building now onsite for MG Construction office personnel.

Correction needed:
- clean and/or remove dirt ramp construction entrance in gutter at east side of site.
- pick up loose trash along frontage.
General Inspection7/17/20187/17/20187/19/2018 PASS
DetailsAndy J. Long
Site entrance and curbing is complete. Concrete washout containment was used. Permit posted. No trackout. Minimal actitivity at time of inspection. No dust. Approved.
General Inspection6/1/20186/1/20186/1/2018 PASS
DetailsAndy J. Long
WIP on foundation. No trackout or discharges. Wattles installed around perimeter of irrigation ditch. Permit sign posted.

Correction request to refresh rock on construction entrance next week. RP noted that paving should also occur within two weeks.
General Inspection4/16/20184/16/20184/16/2018 PART
DetailsMichael Zawacki
Rock entrance is round river rock and compacted, trackout is leaving site. Canal is protected by wattles. Road is dirty from cut area and pipe installation.
BMP Violation2/20/20182/27/20182/27/2018APASS
DetailsAndy J. Long
check for construction entrance maintenance.

New rock has been installed on construction entrance. No new trackout. Site currently inactive. Permit sign posted on Irving at center of project.
Complaint Inspection2/20/20182/20/20182/20/2018APEND
DetailsAndy J. Long
Verbal correcton request to conduct maintenance on construction entrance. Trackout reported has been cleaned/swept. No new violations.

Will follow up in one week. Site is to be inactive this week.
Random Inspection1/8/20181/8/20181/8/2018PPASS
DetailsAndy J. Long
WIP on site work and tiling the irrigation ditch on site along Irving. No activity or crew onsite at time of inspection. Currently wet & muddy conditions on site as snow melts. NO trackout from site. No corrections requested.
General Inspection11/28/201711/28/201711/28/2017 PASS
DetailsAndy J. Long
WIP on tiling the canal. No water flowing currently. No trackout or discharges from site. Permit sign posted.
General Inspection10/12/201710/12/201710/13/2017 PASS
DetailsAndy J. Long
Permit posted. Construction entrance, DI protection, and perimeter wattles installed. No trackout or discharges. Approved.
General Inspection8/23/20178/23/20178/23/2017APASS
DetailsAndy J. Long
WIP removing stockpiles on lot. Water truck onsite for dust control and construction entrance installed. Approved.
Site Preparation8/7/20178/8/20178/9/2017APASS
DetailsAndy J. Long
nate Phone #: ###-####

Permit sign posted. Storm drain on Irving has filter mat installed. Wattle installed between area of disturbance and irrigation ditch. Reviewed fugitive dust control requirements with RP.

Approved for construction.