General Inspection | 4/17/2018 | 4/17/2018 | 4/17/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 4/17/2018 | 4/17/2018 | 4/17/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 3/30/2018 | 3/30/2018 | 3/30/2018 | | PASS |
Michael Zawacki
|
|
|
Concrete work complete. Front is landscaped.
|
General Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 | | PASS |
Michael Zawacki
|
|
|
Concrete contractor installing driveway, sidewalk, curb and gutter. Sunroc washed out into gutter, contractor cleaned up after them, I let Sunroc know.
|
General Inspection | 2/28/2018 | 2/28/2018 | 2/28/2018 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Frame and home footprint complete. Workers parking on street. Back slope vegetation preserved. No trackout or discharges. Approved.
|
General Inspection | 2/13/2018 | 2/13/2018 | 2/15/2018 | | PASS |
Michael Zawacki
|
|
|
WIP. No dirt leaving site, trash has been cleaned up.
|
General Inspection | 1/29/2018 | 1/29/2018 | 1/29/2018 | | PASS |
Andy J. Long
|
|
|
WIP on interior. No trackout, trash contained. Permit posted. Not yet landscaped/stabilized
|
General Inspection | 1/12/2018 | 1/12/2018 | 1/12/2018 | | PART |
Michael Zawacki
|
|
|
Lots of small pieces of trash and stucco all over property. Some dirt getting onto sidewalk and into gutter.
|
General Inspection | 12/27/2017 | 12/27/2017 | 12/27/2017 | | PASS |
Michael Zawacki
|
|
|
WIP on exterior rock work. Ground is snow covered, not able to verify trash has been picked up.
|
General Inspection | 12/8/2017 | 12/8/2017 | 12/8/2017 | | PART |
Michael Zawacki
|
|
|
Front yard needs to be cleaned up. Lots of small pieces of trash, stucco, and concrete. Sidewalk needs to be swept, some dirt ending up on road.
|
General Inspection | 11/23/2017 | 11/23/2017 | 11/27/2017 | | PASS |
Andy J. Long
|
|
|
WIP on interior and landscaping activities. No trackout, discharges or uncontained trash. Approved.
|
Random Inspection | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Andy J. Long
|
|
|
WIP on frame and interior. Street and sidewalk are clean, trash container in good condition. Approved.
|
General Inspection | 10/11/2017 | 10/11/2017 | 10/12/2017 | A | PASS |
Michael Zawacki
|
|
|
Site clean. Dirt is high on silt fence on back slope. Will advise contractor to clean up. Has cleaning crew come through, site free of trash.
|
Tracking Control | 7/10/2017 | 7/12/2017 | 7/13/2017 | A | PASS |
Andy J. Long
|
|
|
Trackout
Track out has been cleaned up. Site is now in compliance.
|
Complaint Inspection | 7/10/2017 | 7/10/2017 | 7/10/2017 | A | FAIL |
Melissa Jannusch
|
|
|
There is trackout. RP is now Doug Tobb ###-####. Issued correction request to sweep to RP. Follow up set for later this week.
|
Complaint Inspection | 7/5/2017 | 7/6/2017 | 7/10/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/26/2017 | 6/5/2017 | 6/5/2017 | A | PASS |
Melissa Jannusch
|
|
|
WIP. Vegetation is containing sediment. No trackout. Trash is contained. No corrections.
|
General Inspection | 5/26/2017 | 5/26/2017 | 5/26/2017 | A | PART |
Andy J. Long
|
|
|
Initial grading & clearing performed without ESC site preparation. Permit sign is posted, no sediment leaving site. Vegetative buffer of hillside vegetation has been preserved. No BMps installed currently. Different RP listed on sign than permit. VM left with Clive - will follow up
|