General Inspection | 11/22/2019 | 11/22/2019 | 11/22/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 11/22/2019 | 11/22/2019 | 11/22/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/7/2019 | 10/7/2019 | 10/7/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean, all homes completed, landscapers finishing up last two homes. Dumped washout on one lot, 5991 lucky, seperate inspection for specific lot recorded.
|
General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 | P | PASS |
Michael Zawacki
|
|
|
Met with builder at site. Area is clean, no ESC issues.
|
General Inspection | 8/9/2019 | 8/9/2019 | 8/12/2019 | | PASS |
Michael Zawacki
|
|
|
WIP on last 3 homes, other homes are completed. Area is clean, permits posted on rear fence.
|
General Inspection | 6/24/2019 | 6/24/2019 | 6/26/2019 | | PASS |
Michael Zawacki
|
|
|
First batch of homes completed and landscaped. Few homes framed. Area for last two homes has been excavated, concrete washout has been removed, was in area where new foundation going.
|
General Inspection | 5/7/2019 | 5/7/2019 | 5/8/2019 | | PASS |
Michael Zawacki
|
|
|
3 homes under construction, one area has just been excavated. Well mrked washout on site, no ESC issues.
|
BMP Violation | 3/19/2019 | 3/22/2019 | 3/22/2019 | A | PART |
Michael Zawacki
|
|
|
Road and sidewalk swept, new washout installed. Old dried dumped washout hasn't been cleaned up.
|
General Inspection | 3/19/2019 | 3/19/2019 | 3/19/2019 | | FAIL |
Michael Zawacki
|
|
|
3 homes under construction. Lucky Ln and sidewalk have lots of dirt. No washout used, all has been dumped on ground at end of construction entrance. Pictures and cleanup request sent to Scott, listed RP for all activity.
|
General Inspection | 2/1/2019 | 2/1/2019 | 2/1/2019 | P | PASS |
Michael Zawacki
|
|
|
Stabalized entrance installed. Work on two homes, both have permits on fence. No ESC issues.
|
General Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 | | FAIL |
Michael Zawacki
|
|
|
Work has begun on two homes, permits displayed on fence. No washout on site, did not see any dumped washout. Workers parked on road. Some trackout on Eugene, looks like delivery drivers going through lots. Contacted RP and he said he would get it clean and fixed.
|
General Inspection | 11/20/2018 | 11/20/2018 | 11/20/2018 | | PASS |
Michael Zawacki
|
|
|
Still idle, no new activity. No dumping on site.
|
General Inspection | 10/3/2018 | 10/3/2018 | 10/3/2018 | | PASS |
Michael Zawacki
|
|
|
No new activity. People have been driving on lots, owner will be responsible for any track out.
|
General Inspection | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Michael Zawacki
|
|
|
Lot is weed covered and stable. No new activity.
|
General Inspection | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PASS |
Andy J. Long
|
|
|
Infill subdivision installation complete. No SFH construction, no activity. No sediment runoff or dust issues observed.
|
Site Preparation | 6/15/2018 | 6/15/2018 | 6/15/2018 | P | PASS |
Michael Zawacki
|
|
|
No new work, no signs of activity.
|
General Inspection | 4/6/2018 | 4/9/2018 | 4/9/2018 | P | PASS |
Michael Zawacki
|
|
|
Site grading, utilities, curb & gutter, and road complete. Few stockpiles on site. No ESC issues.
|