General Inspection | 1/2/2020 | 1/2/2020 | 1/2/2020 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 1/2/2020 | 1/2/2020 | 1/2/2020 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/18/2019 | 12/18/2019 | 12/18/2019 | | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 12/3/2019 | 12/3/2019 | 12/3/2019 | | PASS |
Michael Zawacki
|
|
|
OK to final when interior work finished and port o pot removed.
|
General Inspection | 11/18/2019 | 11/18/2019 | 11/18/2019 | | PASS |
Michael Zawacki
|
|
|
Exterior and landscaping completed. Trash box and pot o pottie still out front.
|
General Inspection | 11/1/2019 | 11/1/2019 | 11/1/2019 | | PASS |
Michael Zawacki
|
|
|
Area clean and stable. OK to close when building permit done.
|
General Inspection | 10/17/2019 | 10/17/2019 | 10/17/2019 | | PASS |
Michael Zawacki
|
|
|
Home is completed and lot landscaped. Trash box still on neighboring lot.
|
General Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 | | PASS |
Michael Zawacki
|
|
|
All trash in box, none has blown out. Lot looks prepped for landscaping.
|
General Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 | | PASS |
Michael Zawacki
|
|
|
Area is clean, all workers parked on street.
|
General Inspection | 9/2/2019 | 9/2/2019 | 9/3/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. Painters currently on site doing interior,no outside work at time of inspection. No landscaping or stabalization.
|
General Inspection | 8/16/2019 | 8/16/2019 | 8/16/2019 | | PART |
Michael Zawacki
|
|
|
Some trash starting to accumulate on lot.
|
General Inspection | 8/1/2019 | 8/1/2019 | 8/1/2019 | | PEND |
Michael Zawacki
|
|
|
Message sent to RP Trash box needs to be emptied and trash cleaned at site.
|
General Inspection | 7/17/2019 | 7/17/2019 | 7/17/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean. Wind fence has caught some trash.
|
General Inspection | 7/2/2019 | 7/2/2019 | 7/2/2019 | | PASS |
Michael Zawacki
|
|
|
Stucco has been dumped on plastic not ground. Trash has been picked up. No ESC issues.
|
General Inspection | 6/17/2019 | 6/17/2019 | 6/17/2019 | | PART |
Michael Zawacki
|
|
|
No dirt or erosion issues. Trash bin is overfull, really needs to be picked up.
|
General Inspection | 5/31/2019 | 5/31/2019 | 5/31/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean, all trash contained. Trash box needs to be emptied. No blow outs off back of lot.
|
General Inspection | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Andy J. Long
|
|
|
Framing in progress. No trackout or discharges. Access to open adjacent lot blocked off.
|
General Inspection | 5/2/2019 | 5/2/2019 | 5/2/2019 | | PASS |
Michael Zawacki
|
|
|
Site clean and contained.
|
General Inspection | 4/17/2019 | 4/17/2019 | 4/18/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean. No ESC issues.
|
General Inspection | 4/2/2019 | 4/2/2019 | 4/2/2019 | | PASS |
Michael Zawacki
|
|
|
WIP, home framed, flashing being installed on roof. Trash all contained in one area, will need to watch out for blowing cardboard if it gets windy.
|
General Inspection | 3/18/2019 | 3/18/2019 | 3/18/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean. All trash contained, is full needs a pickup. No dirt leaving site or going into road.
|
General Inspection | 3/1/2019 | 3/1/2019 | 3/1/2019 | | PASS |
Michael Zawacki
|
|
|
WIP on framing. All workers parked in street. No ESC violations.
|
General Inspection | 2/12/2019 | 2/12/2019 | 2/12/2019 | | PASS |
Michael Zawacki
|
|
|
Framers on site, ground is snow covered.
|
General Inspection | 1/25/2019 | 1/25/2019 | 1/25/2019 | | PASS |
Michael Zawacki
|
|
|
Site clean and contained. Trusses being stored on road and sidewalk.
|
General Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | | PASS |
Michael Zawacki
|
|
|
Foundation is complete and backfilled. Lot has been graded flat, no vertical work has begun. Washout located on different lot is full.
|
General Inspection | 12/19/2018 | 12/19/2018 | 12/19/2018 | | PASS |
Michael Zawacki
|
|
|
Backfill has been pushed back into foundation. Site will need trash container soon. No activity today, site is fenced off.
|
General Inspection | 12/4/2018 | 12/4/2018 | 12/6/2018 | | PASS |
Michael Zawacki
|
|
|
Foundation completed. No current activity. Concrete washout located on lot down hill from home.
|
General Inspection | 11/8/2018 | 11/8/2018 | 11/8/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on foundation. First pour completed, no concrete washout on site, didn't see any dumped washout on ground. All back fill is on neighboring lot.
|
General Inspection | 10/24/2018 | 10/24/2018 | 10/24/2018 | P | PASS |
Michael Zawacki
|
|
|
Working on driveway and pathway. Lot still needs landscaping.
|
Site Preparation | 9/21/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Andy J. Long
|
|
|
Permit sign posted. Approved for initial excavation. Earthen berm (1 ft +) was graded on lot to retain runoff from the slope to the flat daylight bassement area. Concrete washout pit excavated on lot down the hill owner by GC-RP.
After excavation, inspection for additional BMPs is required. Receiving storm drain on Pleasant Hill does not have DI bag installed yet.
|
Site Preparation | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | CANC |
Andy J. Long
|
|
|
cAMERON Phone #: ###-####
Rescheduled by RP for Monday
|