DOC - Permit Finaled | 8/13/2019 | 8/13/2019 | 8/13/2019 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/6/2019 | 8/6/2019 | 8/7/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/22/2019 | 7/22/2019 | 7/22/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/5/2019 | 7/5/2019 | 7/5/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/20/2019 | 6/20/2019 | 6/21/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/5/2019 | 6/5/2019 | 6/5/2019 | | PASS |
Michael Zawacki
|
|
|
Met with contractor on site. Site is clean, landscapers working on sprinklers. No ESC issues, has trash box scheduled for pickup.
|
General Inspection | 5/21/2019 | 5/21/2019 | 5/21/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/6/2019 | 5/6/2019 | 5/6/2019 | | PASS |
Michael Zawacki
|
|
|
Work on outside brick landscape and pothway. Gutters hooked to black poly pipe and discharging down hill. No ESC issues on site.
|
General Inspection | 4/19/2019 | 4/19/2019 | 4/19/2019 | | PASS |
Michael Zawacki
|
|
|
Cement tuck on site, crew working on steps. Truck in dumping into wheelbarrows and vrew bringing to where needed. No current ESC issues.
|
General Inspection | 4/4/2019 | 4/4/2019 | 4/4/2019 | | PASS |
Michael Zawacki
|
|
|
Site contained, no ESC issues.
|
General Inspection | 3/20/2019 | 3/20/2019 | 3/20/2019 | | PASS |
Michael Zawacki
|
|
|
Site is clean and contained. No rear perimeter controls, back has been terraced, no runoff. Some rilling from gutters, not leaving site or very large.
|
General Inspection | 3/5/2019 | 3/5/2019 | 3/5/2019 | | PASS |
Michael Zawacki
|
|
|
Gate is closed and locked. No dirt leaving to street.
|
General Inspection | 2/14/2019 | 2/14/2019 | 2/19/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/29/2019 | 1/29/2019 | 1/30/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/27/2018 | 12/27/2018 | 12/27/2018 | | PASS |
Michael Zawacki
|
|
|
Home framed and prepped for stucco. Driveway has been poured, lot not stabalized.
|
General Inspection | 12/12/2018 | 12/12/2018 | 12/12/2018 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout or discharges. Site is clean and existing hardscape and vegetatation has been preserved.
|
General Inspection | 10/8/2018 | 10/8/2018 | 10/8/2018 | P | PASS |
Andy J. Long
|
|
|
WIP. Site fenced in, perimeter vegetation preserved. No trackout, discharges, or loose trash
|
General Inspection | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Michael Zawacki
|
|
|
Used same foot print as old home, old landscaping still in place. Trash is all contained to site, trash box on site. No runoff issues.
|
General Inspection | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | PASS |
Michael Zawacki
|
|
|
Site is clean. Building material stored on site behind fence. No ESC issues.
|
General Inspection | 5/31/2018 | 5/31/2018 | 5/31/2018 | P | PASS |
Andy J. Long
|
|
|
Permit sing posted. Minimal disturbance, clean site. No sediment runoff observed.
|
Site Preparation | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PASS |
Andy J. Long
|
|
|
Call 20 minutes before // Don Phone #: ###-####
ESC permit sign posted. New home to be built on existing foundation. Minimal excvation to be done to add stem walls. Driveway and vegetated backyard to be preserved, driveway will be stabilized entrance and used for loading. Reviewed concrete washout and trash requirements.
ESC permit for demolition has now been finaled, see ESC18-00395
|