Information based on query as of Saturday, May 11, 2024.
Permit Information
Permit NumberESC18-00492
StatusFinaled
Name CHUCK STORY
Site Address 4252 W ROSE HILL ST
Project NameOlive Grove II Apartments
Customer Number 
ePlanReviewNo
Description
Protect MS4 inlets on Rose Hill and Roosevelt, install construction entrance to prevent trackout to Rose Hills. Concrete washout containment and trash control is required. Call 208-608-7070 to schedule mandatory ESC site preaparation inspection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/6/20199/6/20199/6/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled9/6/20199/6/20199/6/2019PPASS
DetailsMichael Zawacki
Site Final7/22/20197/22/20197/22/2019PNR
DetailsAndy J. Long
Project complete and landscaped. Need to remove storm drain sediment bag installed north of site on Franklin Road.

Notified RP Chuck
General Inspection6/10/20196/10/20196/11/2019 PASS
DetailsMichael Zawacki
Parking lot now paved, area still needs landscaping.
General Inspection4/23/20194/23/20194/23/2019 PASS
DetailsMichael Zawacki
Exterior work completed. Trash is all in trailer. Parking area still needs to be paved.
General Inspection3/7/20193/7/20193/7/2019 PASS
DetailsAndy J. Long
General Inspection1/15/20191/15/20191/16/2019PPASS
DetailsMichael Zawacki
Ite surrounded with fencing and K-rail. Inlets on Franklin protected with witches hats. Garbage trailer on site and used. Circular access road is completely rocked. No issues observed at time of inspection.
General Inspection11/13/201812/4/201812/3/2018AFAIL
DetailsAndy J. Long
No construction entrance. Employees and material loading occuring in the mud off Rose HIll. DI bags installed, but need a stabilized construction access.
General Inspection11/13/201811/13/201811/13/2018APASS
DetailsAndy J. Long
WIP on frame. No trackout, permit posted. Storm drain to west of entrance on Rose Hill and storm drain south of site on Franklin have sediment protection installed. Perimeter barricades and wattles keeping site contained.
General Inspection8/29/20189/4/20189/4/2018APASS
DetailsAndy J. Long
Follow up on corrections to RP Chuck. He will have site swept and add additional BMPs as needed.

Sidewalk was swept as requested. No activity at time of inspection. No new violations observed.

Re-inspection fee removed due to RP requesting an inspection under the Public Works permit.
General Inspection8/27/20188/27/20188/27/2018AFAIL
DetailsAndy J. Long
- no site preparation inspection requested as noted on permit documents and project description
- no ESC permit sign posted
- no construction entrance installed
- concrete washout poured on the ground within site, no contaiment

Only BMP is inlet protection on the MS4 inlets on Rose Hill and south of site on Franklin @ Roosevelt.

- need to pay for re-inspection fee , complete corrections, and schedule Site Preparation inspection.