Permit Information
Permit NumberESC18-00529
StatusFinaled
Name STEVE SNEDECOR
Site Address 1290 W MYRTLE ST
Project NamePioneer Crossing Office Buildi
Customer Number 
ePlanReviewNo
Description
5 Story office building that is 125,000sf. Building will have (future) ground level bank tenant and business tenants on all floors. This permit is for the Grading, Drainage, Footing/Foundation and Super Structure. The other portions will be submitted under a separate Shell/Core Permit. Only one ESC permit required for Pioneer office building. Updated ESC site map submitted. ESC site preparation required. Need to designate RP from Okland for permit issue.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/2/20198/2/20198/2/2019 CANC
DetailsMichael Zawacki
DOC - Permit Finaled8/2/20198/2/20198/2/2019PPASS
DetailsMichael Zawacki
General Inspection6/17/20196/17/20196/17/2019 PASS
DetailsMichael Zawacki
All outside work completed, landscaping done, temporary BMPs removed. All work is now TIs inside.
General Inspection4/30/20194/30/20194/30/2019 PASS
DetailsAndy J. Long
General Inspection3/13/20193/13/20193/14/2019 PASS
DetailsMichael Zawacki
Site contained, no dirt leaving site.
General Inspection1/17/20191/18/20191/22/2019PPASS
DetailsAndy J. Long
General Inspection1/10/20191/10/20191/10/2019PPASS
DetailsMichael Zawacki
Major ground disturbances completed, area around building still bare. Masond working on exterior, mortar mixer has secondary containment and washout on site. No dirt leaving site.
General Inspection10/1/201810/1/201810/1/2018PPASS
DetailsAndy J. Long
WIP on vertical. No trackout or dicharges from site or staging area across the street. Trash and materials are contained.
General Inspection8/20/20188/21/20188/22/2018APASS
DetailsAndy J. Long
check on trackout control, construction entrance and dust control on the laydown yard east of 13th on and I-184 on-ramps. Project using it for staging and parking.


No trackout or discharges from site. WIP on vertical frame for office building.

ESC pernit sign posted. Okland will take care of any issues (trackout, discharges, dust) that arise from using the staging/laydown yard.
General Inspection7/17/20187/17/20187/17/2018PPASS
DetailsAndy J. Long
WIP on foundation. No trackout. Permit sign and SWPPP info posted inside entrance. MS4 inlet at 13th & Myrtle has sediment protection instaled.

Ecopan concrete washout pans being utilized to contain washout. No corrrections requested.
General Inspection6/1/20186/1/20186/1/2018APASS
DetailsMichael Zawacki
Completed all permits as one large site inspection. Controlled entrance and exit, no trackout onto roads. Site is free from fugitive dust, all trash contained. Materials on site are neatly stored. Landscaping along front of hotel not yet completed. Panera Bread has no stucco washout, is being dumped on ground.
Site Preparation5/15/20185/16/20185/16/2018APASS
DetailsMichael Zawacki
Met with Tom from Alta, did site walkthrough. He will talk to Syman to get a SWPPP & board on site, I left him some green permit signs. DIs are all protected, site will eventually be below sidewalk grade. Water wagon is on site, roads will need to be monitored for trackout, site has controlled access.
Site Preparation5/15/20185/16/20185/15/2018ACANC
DetailsAndy J. Long