Site Final | 10/15/2019 | 10/16/2019 | 10/17/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 10/15/2019 | 10/15/2019 | 10/15/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 9/30/2019 | 9/30/2019 | 9/30/2019 | | PASS |
Michael Zawacki
|
|
|
Landscaping in progress.
|
General Inspection | 9/13/2019 | 9/13/2019 | 9/13/2019 | | PASS |
Michael Zawacki
|
|
|
Still needs landscaping.
|
General Inspection | 8/29/2019 | 8/29/2019 | 8/29/2019 | | PASS |
Michael Zawacki
|
|
|
Home exterior is completed, lot hasn't been landscaped, is clean but bare. Lot next door is being used for storage, pallets and etc.
|
General Inspection | 8/14/2019 | 8/14/2019 | 8/15/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/25/2019 | 7/30/2019 | 8/1/2019 | P | PASS |
Michael Zawacki
|
|
|
Exterior of home completed, still needs landscaping. No runoff to golf course.
|
General Inspection | 7/25/2019 | 7/25/2019 | 7/25/2019 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
General Inspection | 7/10/2019 | 7/10/2019 | 7/10/2019 | P | PASS |
Andy J. Long
|
|
|
WIP. Erosion on long south side of home has been fixed. No corrections requested.
|
General Inspection | 7/4/2019 | 7/4/2019 | 7/5/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 | | PASS |
Michael Zawacki
|
|
|
All work completed. Landscaper on site finishing up.
|
General Inspection | 6/4/2019 | 6/4/2019 | 6/4/2019 | | PASS |
Michael Zawacki
|
|
|
Wattle and silt fence along bottom of hill to prevent any blowout onto golf cart path. Some small rills on side of home getting caught by BMPs. No loose trash around site.
|
General Inspection | 5/17/2019 | 5/17/2019 | 5/17/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/2/2019 | 5/2/2019 | 5/8/2019 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/17/2019 | 4/17/2019 | 4/17/2019 | P | PASS |
Michael Zawacki
|
|
|
Lots that were draining onto lot have had wattle installed on perimeters and a berm on last lot. Rill was repaired but starting to form again. Wattle installed along bottom in front of silt fence. Golf cart path swept.
|
BMP Violation | 4/9/2019 | 4/9/2019 | 4/9/2019 | P | FAIL |
Michael Zawacki
|
|
|
Rilling and runoff. Correction sent to RP
|
General Inspection | 3/26/2019 | 3/26/2019 | 3/26/2019 | | PASS |
Michael Zawacki
|
|
|
Correction request for entire site sent to RP.
|
General Inspection | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | FAIL |
Michael Zawacki
|
|
|
Giant gully running down hill, silt fence has blown out and dirt on golf cart path. Message sent to RP.
|
General Inspection | 2/15/2019 | 2/15/2019 | 2/15/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/31/2019 | 1/31/2019 | 1/31/2019 | | PASS |
Andy J. Long
|
|
|
inpspected 1/30. Subdivision bmps installed. No trackout.
|
General Inspection | 7/10/2018 | 7/26/2018 | 7/26/2018 | A | PASS |
Michael Zawacki
|
|
|
Site has been idle since excavation. No ESC issues.
|
General Inspection | 7/10/2018 | 7/10/2018 | 7/10/2018 | P | PASS |
Andy J. Long
|
|
|
Excavation complete, large basement protectect with orange fencing. Perimeter silt fence installed below disturbances. ESC permit sign posted. No violations.
|
General Inspection | 6/12/2018 | 6/15/2018 | 6/15/2018 | A | PASS |
Michael Zawacki
|
|
|
Site is clean. Backfill hauled to new phase for fill dirt.
|
Site Preparation | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PASS |
Michael Zawacki
|
|
|
BMPs along perimeter, silt fence on bottom. Backfill will be used for next phase. Will follow up Friday.
|