General Inspection | 10/8/2019 | 10/8/2019 | 10/8/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 10/8/2019 | 10/8/2019 | 10/8/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 9/20/2019 | 9/20/2019 | 9/20/2019 | | PASS |
Michael Zawacki
|
|
|
Work completed and landscaped. Some rilling coming from sprinkler head on rear terrace, hill seeded and just starting to grow. Landscape gravel still on road.
|
General Inspection | 9/5/2019 | 9/5/2019 | 9/5/2019 | | PASS |
Michael Zawacki
|
|
|
Small area of hillside still exposed. Rest of lot landscaped and stabilized, landscape rock still on street.
|
General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 | | PASS |
Michael Zawacki
|
|
|
Crew on site installing retaining wall and ADS drainage. Some topsoil is stored on street.
|
BMP Violation | 8/2/2019 | 8/5/2019 | 8/5/2019 | P | CANC |
Andy J. Long
|
|
|
see ESC19-00601
|
General Inspection | 7/24/2019 | 7/24/2019 | 7/24/2019 | | PASS |
Michael Zawacki
|
|
|
All work is on interior. Gator guards at perimeter, material starting to accumulate. No landscaping or stabalization has been begun.
|
General Inspection | 7/9/2019 | 7/9/2019 | 7/10/2019 | | PASS |
Andy J. Long
|
|
|
Work on interior still occuring. Exterior not yet landscaped. BMPs installed and maintained, no trackout, loose trash, or discharges
|
BMP Violation | 6/20/2019 | 6/24/2019 | 6/24/2019 | P | PASS |
Andy J. Long
|
|
|
check for site clean up, see corrections from previous inspection.
Corrections requested were completed. Site is in compliance.
|
BMP Violation | 6/20/2019 | 6/20/2019 | 6/20/2019 | P | FAIL |
Andy J. Long
|
|
|
Dumped washout on adjacent one lot (from pool contractor per GC/RP) perimeter wattles are no longer properly installed. Gravel gutter check bag has a lot of accumulated sand and some stucco/concrete slurry.
Corrections: - clean up gutter and sidewalk - clean up dumped washout - re-install sections of watlle that are dislodged.
Verbal correction request issued to GC-RP Justin. Compliance follow up scheduled for Monday 6/24
|
BMP Violation | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | FAIL |
Andy J. Long
|
|
|
Trackout, loose trash, full concrete washout, damaged BMPs.
Parcel hold and fine issued on site. Inspector already picked up trash for site on Thursday April 4th.
|
General Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | FAIL |
Michael Zawacki
|
|
|
Lot has been graded onto sidewalk. Correction request sent to RP
|
Site Preparation | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PEND |
Andy J. Long
|
|
|
Justin ###-#### @ 2:30
This project will begin after upper Sunrise lot is excavated.
|