General Inspection | 9/5/2019 | 9/5/2019 | 9/5/2019 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 9/5/2019 | 9/5/2019 | 9/5/2019 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 8/21/2019 | 8/21/2019 | 8/21/2019 | | PASS |
Michael Zawacki
|
|
|
Washout has been cleaned.
|
General Inspection | 8/2/2019 | 8/2/2019 | 8/2/2019 | | FAIL |
Andy J. Long
|
|
|
Dumped concrete washout on upper lot. Either from pool or home below.
|
General Inspection | 7/18/2019 | 7/18/2019 | 7/18/2019 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/3/2019 | 7/3/2019 | 7/3/2019 | | PASS |
Michael Zawacki
|
|
|
House and pool completed, landscaping in progress.
|
General Inspection | 5/16/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Andy J. Long
|
|
|
Stockpile on adjacent lot has been removed. Homeowner is hiring crew to finish landscaping. Pool crew utilized a contained washout. No corrections.
|
BMP Violation | 4/12/2019 | 4/12/2019 | 4/17/2019 | P | PEND |
Andy J. Long
|
|
|
Trash picked up, BMPs reinstalled. Ecopan washout removed. Fines paid.
Still need to move stockpile off of upper lot this week.
|
BMP Violation | 4/8/2019 | 4/8/2019 | 4/8/2019 | A | FAIL |
Andy J. Long
|
|
|
Using adjacent lot without permission. Large stockpile and trackout occuring. Workers driving through mud and parking in the back. Should be for essential access only.
Parcel hold until site is cleaned up, stockpile removed or arrangement worked out with lot owner.
|
Complaint Inspection | 3/29/2019 | 3/29/2019 | 3/29/2019 | P | DONE |
Andy J. Long
|
|
|
trash along Bogus Basin road?
RP to pick up trash visible for BB road in the landscaped portion of the subdivision.
|
Complaint Inspection | 3/26/2019 | 3/27/2019 | 3/27/2019 | A | PASS |
Michael Zawacki
|
|
|
Trash has all been cleaned and bin is in neighboring home garage. Talked to inspector representing buyers, said on Monday trash bin was blown over and garbage was every where. All cleaned. Some rills coming on and leaving lot.
|
General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 | P | PART |
Michael Zawacki
|
|
|
Site is clean and contained. Material being stored on lot above home. Lots of mud from lot below.
|
General Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 | P | PASS |
Andy J. Long
|
|
|
WIP on frame. Perimeter BMPs installed, site fenced off to prevent access and trackout. No corrections requested. No discharges, uncontained trash or trackout.
|
Tracking Control | 10/31/2018 | 11/2/2018 | 11/6/2018 | A | PASS |
Michael Zawacki
|
|
|
WIP on framing. Road and sidewalk being swept, site kept clean.
|
General Inspection | 10/23/2018 | 10/23/2018 | 10/25/2018 | A | PART |
Michael Zawacki
|
|
|
Foundation completed and work begun on framing and floor. Lots of trackout, looks like it has been swept but still showing. Eco pan on road. No trash.
|
General Inspection | 9/24/2018 | 10/4/2018 | 10/4/2018 | P | PART |
Michael Zawacki
|
|
|
Large rill has formed draining onto lot below. No sediment making it onto road or sidewalk.
|
Site Preparation | 9/24/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Andy J. Long
|
|
|
Justin ###-#### @ 2:30
Approved for excavation. Existing driveway approach to be leveled, will install additional controls or pave during foundation work.
Gravel check bag to be installed in gutter. RP Justin is working with developer to get a designated washout on the common area at top of culdesac. Will preserve existing earthen berm around parcel as perimeter control.
|