General Inspection | 8/10/2020 | 8/10/2020 | 8/10/2020 | | PASS |
Michael Zawacki
|
|
|
All units framed, all concrete work looks completed. Units have trash boxed, some loose trash around. SIte is all contained.
|
General Inspection | 6/23/2020 | 6/23/2020 | 7/1/2020 | | PASS |
Andy J. Long
|
|
|
WIP on townhomes on Tierra. Storm drains have sediment protection, permit sign posted at entrance. No dumped material or trackout observed. Trash contained.
No corrections requested.
|
General Inspection | 5/8/2020 | 5/8/2020 | 5/8/2020 | | CANC |
Andy J. Long
|
|
|
no activity
|
General Inspection | 3/23/2020 | 3/23/2020 | 3/23/2020 | | PASS |
Andy J. Long
|
|
|
No activity. No ESC corrections needed.
|
General Inspection | 2/4/2020 | 2/4/2020 | 2/7/2020 | | PASS |
Michael Zawacki
|
|
|
No new activity.
|
General Inspection | 12/18/2019 | 12/18/2019 | 12/18/2019 | | PASS |
Michael Zawacki
|
|
|
No building activity has begun. Seepage beds between sidewalk and road completed and covered with clean rock.
|
General Inspection | 10/30/2019 | 10/30/2019 | 10/30/2019 | P | PASS |
Andy J. Long
|
|
|
No activity. Site work complete. Storm drains has sediment protection. No trash or debris left behind. SW corner has perimeter sediment control wattle installed.
|
General Inspection | 9/19/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Michael Zawacki
|
|
|
SXite prep work completed. No building have begun.
|
General Inspection | 8/19/2019 | 8/19/2019 | 8/19/2019 | A | PASS |
Andy J. Long
|
|
|
No activity at site, dry conditions. Site stormwater drains and frontage swale are complete.
No spills, discharges, loose trash, permit sign/SWPPP info posted.
Correction request to install wattles to protect new swales and prevent access to lots through parking lot south of site.
Relocate portapotty > 50 m from storm drain and stake down.
|
BMP Violation | 7/18/2019 | 7/25/2019 | 7/24/2019 | A | PASS |
Michael Zawacki
|
|
|
Washout cleaned and lined washout installed.
|
General Inspection | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | FAIL |
Michael Zawacki
|
|
|
Washout dumped. Concrete crew on site, say they will clean it. Follow up scheduled.
|
General Inspection | 6/11/2019 | 6/11/2019 | 6/11/2019 | P | PASS |
Michael Zawacki
|
|
|
WIP on sewer in road in front of site. No new activity, site is exposed, water truck on site.
|
General Inspection | 5/3/2019 | 5/15/2019 | 5/15/2019 | P | PASS |
Michael Zawacki
|
|
|
Grading and prep for road bed completed. SIte will need new entrance when work resumes. Inlet protection installed and clean, no dirt or dust leaving site.
|
Site Preparation | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PASS |
Andy J. Long
|
|
|
Meeting with RP Mike.
ESC permit sign and SWPPP info posted. Receiving storm drains south and west of site have sediment protection installed.
Employees to park on paved parking lot in empty building next door.
Flat lot, request to put either fence or silt fence around east and south perimeter to control access. Subdivsion to build its own stormwater system. No groundwater anticipated at this time.
|