Permit Information
Permit NumberESC19-00351
StatusIssued
Name MICHAEL MCHARGUE
Site Address 52 N LIBERTY ST
Project NameLiberty Lofts Subdivision
Customer Number 
ePlanReviewNo
Description
19 Lot Subdivision on 1.55 Acres with private street. Construction entrance required, protect existing storm drains on Liberty Street. Leak proof concrete washout facility required. Must control fugitive dust during grading activities. ESC Site Preparation inspection is required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/10/20208/10/20208/10/2020 PASS
DetailsMichael Zawacki
All units framed, all concrete work looks completed.
Units have trash boxed, some loose trash around. SIte is all contained.
General Inspection6/23/20206/23/20207/1/2020 PASS
DetailsAndy J. Long
WIP on townhomes on Tierra. Storm drains have sediment protection, permit sign posted at entrance. No dumped material or trackout observed. Trash contained.

No corrections requested.
General Inspection5/8/20205/8/20205/8/2020 CANC
DetailsAndy J. Long
no activity
General Inspection3/23/20203/23/20203/23/2020 PASS
DetailsAndy J. Long
No activity. No ESC corrections needed.
General Inspection2/4/20202/4/20202/7/2020 PASS
DetailsMichael Zawacki
No new activity.
General Inspection12/18/201912/18/201912/18/2019 PASS
DetailsMichael Zawacki
No building activity has begun. Seepage beds between sidewalk and road completed and covered with clean rock.
General Inspection10/30/201910/30/201910/30/2019PPASS
DetailsAndy J. Long
No activity. Site work complete. Storm drains has sediment protection. No trash or debris left behind. SW corner has perimeter sediment control wattle installed.
General Inspection9/19/20199/19/20199/19/2019PPASS
DetailsMichael Zawacki
SXite prep work completed. No building have begun.
General Inspection8/19/20198/19/20198/19/2019APASS
DetailsAndy J. Long
No activity at site, dry conditions. Site stormwater drains and frontage swale are complete.

No spills, discharges, loose trash, permit sign/SWPPP info posted.

Correction request to install wattles to protect new swales and prevent access to lots through parking lot south of site.

Relocate portapotty > 50 m from storm drain and stake down.
BMP Violation7/18/20197/25/20197/24/2019APASS
DetailsMichael Zawacki
Washout cleaned and lined washout installed.
General Inspection7/18/20197/18/20197/18/2019PFAIL
DetailsMichael Zawacki
Washout dumped. Concrete crew on site, say they will clean it.
Follow up scheduled.
General Inspection6/11/20196/11/20196/11/2019PPASS
DetailsMichael Zawacki
WIP on sewer in road in front of site. No new activity, site is exposed, water truck on site.
General Inspection5/3/20195/15/20195/15/2019PPASS
DetailsMichael Zawacki
Grading and prep for road bed completed. SIte will need new entrance when work resumes. Inlet protection installed and clean, no dirt or dust leaving site.
Site Preparation5/2/20195/3/20195/3/2019APASS
DetailsAndy J. Long
Meeting with RP Mike.

ESC permit sign and SWPPP info posted. Receiving storm drains south and west of site have sediment protection installed.

Employees to park on paved parking lot in empty building next door.

Flat lot, request to put either fence or silt fence around east and south perimeter to control access. Subdivsion to build its own stormwater system. No groundwater anticipated at this time.