Permit Information
Permit NumberFIR18-00159
StatusFinaled
Name STATEFIRE DC SPECIALTIES
Site Address 2200 W FAIRVIEW AVE
Project NameNew Path Community Housing
Customer Number 
ePlanReviewYes
Description
[New Path Community Housing]
The fire sprinkler scope of work consists of protecting a four level apartment building per NFPA 13R. The bottom level has various service room, offices and a community room. The remainder of the building is apartments. There are two manual wet class I standpipes in the stair towers. The hose outlets are on the intermediate floor landings. The standpipe isolation valves are located on the main fire protection header. Floor control valves are supplied by the north standpipe. The piping is predominately CPVC. The 6” underground piping supplies a 4” backflow preventer and header. The systems are designed with 2 ½” and 1 ½” mains with 1” branch lines. This is a class B seismic zone and therefore, does not require earthquake bracing.

• The underground piping is under permit FIR17-00674.

[BLD17-02377]
To demolish existing 6,061 sq. ft. restaurant building and to construct a new 34,249 sf, 4-story, 41-unit multi-family apartment building and site improvements. This building is fully fire sprinklered for R occupancy and a story increase and is equipped with and alarm system. CDM

Alternative Materials and Methods:

• There are two AMM. However, they do not apply to the fire protection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/30/201810/31/201810/31/2018APASS
DetailsJim Page
Final fire sprinkler inspection complete.

Phone #: ###-#### Inspection requested via web by jeremiah robison
INSP-Final Inspection10/29/201810/30/201810/30/2018AFAIL
DetailsJim Page
Need to install correct heads in non-residential areas as shown on city approved drawings. Head in room 105 to close to wall, repair as needed. Submit as-builts showing changes made to fire sprinkler system.

Leon Taylor is the contact. Phone #: ###-#### Inspection requested via web by Randy Knutson
INSP-Final Inspection10/25/201810/26/201810/26/2018AFAIL
DetailsJim Page
Repair all noted items mentioned through inpsection on level 3 and 4. Contractor needs to walk remaining floors and fix any deficiencies found.

Leon is point of contact. Phone #: ###-#### Inspection requested via web by Randy Knutson
INSP-Final Inspection10/24/201810/25/201810/25/2018PCANC
DetailsJim Page
Leon Taylor is point of contact. Phone #: ###-#### >> Inspection requested via web by Randy Knutson Inspection cancelled from web by: Randy Knutson
INSP-Final Inspection10/18/201810/23/201810/22/2018PCANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Matthew Lewis Inspection cancelled from web by: Randy Knutson
INSP-Sprinkler Rough-in/Hydro10/4/201810/4/201810/4/2018PDONE
DetailsJim Page
Hydrostatic test for level 1 complete, all hydrostatic testing for project is complete.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro10/3/201810/3/201810/3/2018PPART
DetailsJim Page
Hydostatic test for stanpipe complete, level 1 to be tested at a later date.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro10/1/201810/2/201810/2/2018PPART
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping on levls 2, 3 and 4 complete, level 1 and standpipes to be tested at a later date.

Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in/Hydro10/1/201810/1/201810/1/2018PCANC
DetailsJim Page
Hydrostatic test cancelled per point of contact, inspection request will be scheduled for a later date.

Hydro of full building. Leon Taylor is point of contact. Phone #: ###-#### Inspection requested via web by Randy Knutson
INSP-Sprinkler Rough-in9/4/20189/5/20189/5/2018PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in level 1 corridor complete, approved for cover.

Had to reschedule Tuesday inspection to Wednesday. 1st floor Hall Rough-in.
Leon Taylor is the man on site. Phone #: ###-#### Inspection requested via web by Randy Knutson
INSP-Sprinkler Rough-in8/31/20189/4/20189/4/2018ACANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Matthew Lewis Inspection cancelled from web by: Randy Knutson
INSP-Sprinkler Rough-in8/23/20188/24/20188/24/2018PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located on north wing level 1 complete excluding corridor heads, approved for cover, corridor cover is not approved until finish pendant heads are installed and inspected.

All Rooms on North Wing. First floor I believe.
Leon Taylor should be on site. Phone #: ###-#### Inspection requested via web by Randy Knutson
INSP-Sprinkler Rough-in8/21/20188/21/20188/21/2018PPART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located on east wing level 1 complete excluding corridor heads complete, approved for cover, corridor cover is not approved until finish pendant heads are installed and inspected.

Rough-In 1st floor East Wing
Leon Taylor is on-site.
Thanks, Phone #: ###-#### Inspection requested via web by Randy Knutson
INSP-Sprinkler Rough-in8/14/20188/15/20188/15/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in corridors on levls 2, 3 and 4 complete, approved for cover.

2nd.3rd,4th Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in8/14/20188/15/20188/14/2018ACANC
DetailsJim Page
Phone #: ###-#### >> Inspection requested via web by Matthew Lewis Inspection cancelled from web by: Matthew Lewis
INSP-Sprinkler Rough-in6/18/20186/19/20186/19/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in rooms on levels 2, 3 and 4 complete, notated city approved drawings with red in areas approved for cover.

3rd and 4th floor Phone #: ###-#### Inspection requested via web by Matthew Lewis
INSP-Sprinkler Rough-in6/15/20186/18/20186/18/2018AFAIL
DetailsTroy Cobbley
Missing the small documents and the hanger clips are missing. Per discussion with the fitter it will be rescheduled

3rd and 4th floor Phone #: ###-#### Inspection requested via web by Matthew Lewis