Permit Information
Permit NumberFIR18-00675
StatusFinaled
Name VIKING AUTOMATIC SPRINKLER CO
Site Address 2121 N COLE RD
Project NameFairmont Jr. High School
Customer Number 
ePlanReviewYes
Description
[Fairmont Jr. High School Gymnasium]
The fire sprinkler scope of work consists of a new building on the existing campus of Fairmont Jr. High. The new building is completely independent, and not connected to the existing school structure. It will have a Gym, Locker Rooms, Common Areas, and a Kitchen.

[BLD18-00943]
Permit to construct a new 28,750 square foot gymnasium, locker rooms, and cafeteria with associated support areas including restrooms, kitchen associated office, storage, and mechanical rooms on the existing Fairmont Jr. High campus. Work also includes general site work. Special inspections required per attached Form 310. All work per the approved plans and notations. This building is fully fire sprinklered for area increase and is fully alarmed. JAR

Alternative Materials and Methods:
This project includes approved code alternates to the following fire protection systems and/or building life safety systems. Please review the supplemental documents attached to this building permit case for details. Fire protection “shop drawings” shall include approved code alternate design.

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/12/20197/15/20197/15/2019APASS
DetailsTroy Cobbley
Permit finaled

Phone #: ###-#### Inspection requested via web by Brett Lawatch
INSP-Sprinkler Rough-in/Hydro4/25/20194/29/20194/29/2019APASS
DetailsTroy Cobbley
Overhead hydro test for the south half of the project passed with no visible loss at the guage. Also corrections have been made as previously noted so all piping can be covered.

Contact is Jeff Phone #: ###-#### Inspection requested via web by Chris Green
INSP-Sprinkler Rough-in/Hydro4/24/20194/25/20194/25/2019AFAIL
DetailsTroy Cobbley
Inspection was for all piping to the south of the dividing doors between the Cafeteria and Gym. Hydro test failed due to missing sprinkler heads, also piping size for the amount of heads at the south end of the corridor does not match plans. Two additional 90's and additional piping needs to be added to the Gym area hydraulic calculation.

CONTACT NAME IS JEFF. INSPECTION IS FOR TEN SPRINKLER HEADS. Phone #: ###-#### Inspection requested via web by Chris Green
INSP-Final Inspection3/21/20193/22/20193/22/2019APART
DetailsTroy Cobbley
The Phase 1 work is complete. Forward flush testing passed. Robert Phone #: ###-####
INSP-Final Inspection3/20/20193/21/20193/21/2019ACANC
DetailsTroy Cobbley
Fire alarm was not ready. To be rescheduled.
Robert Phone #: ###-####
INSP-Final Inspection3/19/20193/20/20193/20/2019ACANC
DetailsTroy Cobbley
To be rescheduled for tomorrow. Robert Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro3/19/20193/20/20193/20/2019APASS
DetailsTroy Cobbley
Overhead hydro test passed for the phase 1 area. Need to add sprinkler coverage in Display/Trophy case as discussed. Need plan modes for additional 90's for the remote area under the mezzanine.

Robert Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro3/18/20193/19/20193/19/2019ACANC
DetailsTroy Cobbley
To be rescheduled, Robert Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro3/15/20193/18/20193/18/2019PCANC
DetailsTroy Cobbley
Not ready for inspection yet after onsite visit with Robert during a conference with the General Contractor. Will need city approved drawings and we also discussed the need for a hydro test for the phase 1 area. Will be rescheduled for the morning. Robert Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro2/28/20193/1/20193/1/2019PPART
DetailsTroy Cobbley
Hydro test held pressure but I found out not all piping has been cut/installed and the general contractor stated there was a leak in the Gym. Hydro will need to be redone. Rough-in passed for the Kitchen/Office/Dish Washing area and piping can be covered.
Jeff Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro1/31/20192/1/20192/1/2019PPASS
DetailsTroy Cobbley
See the city approved plans for locations in the south side of building where sprinkler piping can be covered. I also looked at the overhead sprinkler piping in the Kitchen/Cooler area. Another rough-in inspection will be needed for cover when the T-bar and pendants in this area have been installed. Right now it is just the supply piping at the roof deck.

Cesear Phone #: ###-####
INSP-Supply line flush1/31/20192/1/20192/1/2019PPASS
DetailsTroy Cobbley
Underground flush passed

Cesear Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro11/6/201811/7/201811/7/2018APASS
DetailsTroy Cobbley
Underground Hydro passed. Rough to cover passed. Piping can be covered.
INSP-Sprinkler Rough-in/Hydro11/5/201811/6/201811/6/2018PPART
DetailsTroy Cobbley
Rough in for the underground supply line passed and the piping can be covered./ The Hydro for underground dedicated fire main failed due to visible loss at the guage.. Contact is Cesar Rodriguez Phone #: ###-#### Inspection requested via web by Brett Lawatch