INSP-Final Inspection | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 6/20/2019 | 6/21/2019 | 6/21/2019 | A | PASS |
Troy Cobbley
|
|
|
Underground hydro test witnessed with no visible loss of pressure.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | FAIL |
Troy Cobbley
|
|
|
Underground hydro failed due to visible loss on the guage
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 6/18/2019 | 6/19/2019 | 6/19/2019 | A | PASS |
Troy Cobbley
|
|
|
Supply line re-flush witnessed
|
INSP-Sprinkler Rough-in | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PASS |
Troy Cobbley
|
|
|
The underground supply line had a leak, was repaired and now can be re-covered.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Supply line flush | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
Gabe Garduno is the contact. Stacey with Suez will be at this building as well as 11792 at 10:00 AM to do this underground flush. This inspection is to be at the same time as above ground hydros for both buildings as well. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 3/11/2019 | 3/12/2019 | 3/13/2019 | A | FAIL |
Troy Cobbley
|
|
|
Addressing and permit number neeed sorted out as per onsite conversation.
underground fire line // Cam Phone #: ###-####
|
INSP-Sprinkler Rough-in | 3/11/2019 | 3/11/2019 | 3/11/2019 | P | FAIL |
Troy Cobbley
|
|
|
There are issues with this permit number/job. Per activities this project was inspected on 9/7/18 after being scheduled by Shilo. The onsite underground installer and building contractor state that it hasn't been inspected yet. Per Pat with Biltmore Const. Shilo did not know about the project until January. I let all parties know they need to have the correct inspection/address/activity scheduled so that the proper inspection can be performed. Also concrete for the thrust blocks is running late. No inspection performed.
The contact is Bryan Collins. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 9/6/2018 | 9/7/2018 | 9/7/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for ubnderground supply complete, approved for cover.
underground // Cam Phone #: ###-####
|