Information based on query as of Tuesday, May 14, 2024.
Permit Information
Permit NumberFIR18-00708
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 8000 S FEDERAL WAY
Project NameMICRON BUILDING 37
Customer Number 
ePlanReviewYes
Description
Level 1 fire sprinkler system shall connect to the existing 6" standpipe from previously approved permit FIR18-00428, and extend throughout level 1 area of building 37, utilizing upright and pendant sprinklers supplied by the wet system with 4" mains, 1½" branch lines and 1" arm-overs, sprigs and drops.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection1/22/20191/24/20191/24/2019PPASS
DetailsTroy Cobbley
permit finaled

Tony Phone #: ###-####
INSP-Sprinkler Rough-in12/26/201812/28/201812/28/2018APART
DetailsJim Page
Rough to cover inspection for overhead firte sprinkler piping on level 1 restroom/gym area complete. RTC for grid areas on level 1 complete, areas inspected approved for cover.

Contact is Mike Martin. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro12/27/201812/28/201812/28/2018ADONE
DetailsJim Page
Hydrostatic test for level 1 witnessed, nio pressure loss observed.

Mike Phone #: ###-####
INSP-Sprinkler Rough-in12/11/201812/12/201812/12/2018APASS
DetailsTroy Cobbley
The piping above the hardlids in Area "C" Restrooms at the east side of the building is ok for cover.

Tony Cetani is the contact. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in12/6/201812/7/201812/7/2018PPART
DetailsJim Page
Rough to cover inspection for overehad fire sprinkler piping located above hardlids in restrooms complete, approved for cover.

to cover, 1st floor // Tony Phone #: ###-####
INSP-Sprinkler Rough-in12/4/201812/5/201812/5/2018APART
DetailsJim Page
Rough in inspection for shell piping complete, a cover inspection will be required after pendant heads/arm overs are installed.

Tony Cetani is the contact and he would like a rough to cover inspection on piping. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/14/201811/15/201811/15/2018APART
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping located above the hardlids in the east restrooms complete to include corridor, areas inspected approved for cover.

Tony Cetani is the Shilo foreman. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in11/13/201811/13/201811/13/2018PFAIL
DetailsTroy Cobbley
No city approved plans for the areas requested for inspection

Tony Cetani is the contact. Thanks. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro11/13/201811/13/201811/13/2018PFAIL
DetailsTroy Cobbley
Not ready for hydro since all heads have not been cut in.

Tony Cetani is the contact. Thanks:) Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/30/201810/31/201810/31/2018PDONE
DetailsJim Page
Consultation complete.

Consultation Phone #: ###-#### Inspection requested via web by Stan Beus